515 West 148 Street
Manhattan, NY 10031BBL 1-02080-0122Map
Owner of record: 515 West 148th Street
515 West 148 Street is a walk-up apartment building built in 1910 in Manhattan, 10031. It has 10 residential units across 3 floors. The owner of record is 515 West 148th Street. HPD has recorded 48 housing violations here, most recently on March 29, 2018.
- HPD violations
- 48
- DOB violations
- 17
- ECB violations
- 39
- HPD complaints
- 13
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 48
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color north wall and west wall in the 1st room from north at west located at apt 1
Mar 29, 2018 · Apt 1
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the riser at west wall in the bathroom located at bsmt-apt 1
Mar 29, 2018 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water. at community bathroom, 1st story
Mar 18, 2017
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ornamental decorative masonry molding above the 4th window from east at the front at building , 1st story
Jun 29, 2016
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box ... at public hall, 1st story
Jun 29, 2016
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Jun 29, 2016
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jun 29, 2016
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jun 29, 2016
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant ceiling at the boiler room at cellar
Jun 29, 2016
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at the boiler room at cellar
Jun 29, 2016
Closed — Violation dismissed
Show 38 more ↓
- BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 101, 2nd story, 1st apartment from west at north
Mar 25, 2015 · Apt 101
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 101, 2nd story, 1st apartment from west at north
Mar 25, 2015 · Apt 101
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Mar 25, 2015
Closed — Violation closed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following a minimum of 100 watts incandescent light required; light fixture present. at front areaway
Nov 3, 2014
Closed — Violation closed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts minimum required (light fixtures present)
May 6, 2013
Closed — Violation closed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts minimum required
Jul 16, 2012
Closed — Violation closed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following , 100 watts required.
Jan 25, 2006
Closed — Violation closed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts lights not on
Oct 24, 2005
Closed — Violation closed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts light not on
Oct 16, 2005
Closed — Violation closed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts lights not on
Oct 11, 2005
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of cellar flooded throughout.
Sep 16, 1999
Closed — Violation closed - BHazardous
Properly repair the broken or defective 8 9 10 11 tread from bottom stair 2 sty public hall.
Apr 28, 1999
Closed — Violation closed - CImmediately hazardous
D26-17.10 adm code post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to building's heating system 1st sty public hall near mailboxes and at door to boiler room.
Apr 28, 1999
Closed — Violation closed - BHazardous
D26-10.01 adm code properly secure the loose metal fence at west front entrance to building.
Apr 28, 1999
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective masonry nosing ground landing front yard.
Apr 28, 1999
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper.
Apr 28, 1999
Closed — Violation closed - ANon-hazardous
Paint or post a sign indicating floors public hall all stys.
Apr 28, 1999
Closed — Violation closed - ANon-hazardous
Refit door to boiler room cellar.
Apr 28, 1999
Closed — Violation closed - BHazardous
Replace with new the missing missing fuse box cover west wall cellar.
Apr 28, 1999
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material floor of south cellar.
Apr 28, 1999
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the bags clothes cellar thru out.
Oct 27, 1998
Closed — Violation closed - CImmediately hazardous
Replace with new the missing top & bottom west window sashes & glass kitchen bsmt sty apt 1 er1 located at apt 1
Feb 9, 1998 · Apt 1
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective cement brown stone over bldg front entrance to vestibule bsmt sty
Feb 9, 1998
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective cement brownstone retaining walls bldg front at bsmt level
Feb 9, 1998
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant ceiling cellar thru out
Feb 9, 1998
Closed — Violation closed - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint & or plaster all walls 2 window framies radiator & heat riser northwest room bsmt sty atp 1 steinbrige 368 8507 er1 98005072
Feb 9, 1998
Closed — Violation closed - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint & or plaster ceiling all walls 2 window frames & radiator kitchen bsmt sty atp 1 er1 98005072
Feb 9, 1998
Closed — Violation dismissed - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint & or palster ceiling all walls heat riser windwo frame center room bsmt sty apt 1 er1 98005072 located at apt 1
Feb 9, 1998 · Apt 1
Closed — Violation closed - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint & or plaster ceiling all walls heat riser bathroom bsmt sty apt 1 er1 98005072 located at apt 1
Feb 9, 1998 · Apt 1
Closed — Violation closed - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint & or plaster ceiling all walls 2 window frames radiator south room bsmt sty apt 1 er1 98005072 located at apt 1
Feb 9, 1998 · Apt 1
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor private hall 1 sty east apt 1 , section '' ''
Jan 3, 1998 · Apt 1
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective facade at entrance & at stoop.
May 16, 1994
Closed — Violation closed - BHazardous
D26-10.01 adm code properly repair with similar material the broken or defective walls basement stairs to cellar.
Dec 10, 1986
Closed — Violation closed - BHazardous
D26-11.01, 11.03, 11.05 adm code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the cellar throughout.
Dec 10, 1986
Closed — Violation closed - BHazardous
D26-10.01 adm code properly repair the broken or defective paving cellar at rear.
Dec 10, 1986
Closed — Violation closed - BHazardous
D26-10.01 adm code replace with new the broken or defective door assembly at cellar to rear yard.
Dec 10, 1986
Closed — Violation closed - ANon-hazardous
D26-10.01 adm code repair the broken or defective plastered surfaces and paint in a uniform color wall at bathtub 1st sty public hall bathroom.
Dec 10, 1986
Closed — Violation closed - BHazardous
D26-10.01 adm code properly repair with similar material the broken or defective metal ceiling over boiler cellar boiler room.
Dec 10, 1986
Closed — Violation closed
DOB building violations · 17
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 4, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 26, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 16, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 6, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 23, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 28, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 5, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 5, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 7, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 15, 2017
Dob violation - dismissed
Show 7 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 15, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 14, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 14, 2017
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boiler boiler optional
B-boiler boiler optional
Feb 8, 1989
Dob violation - dismissed
ECB violations · 39
- Class - 1
Failure to maintain bldg walls or appurtenances. noted: at time of inspection i observed at exp#1 at the front facade decorative cornice moulding in disrepair w/spalling concrete & pieces seperating,need to mak
Aug 13, 2019 · Penalty $6,250
Resolve - Class - 1
Failure to maintain bldg walls or appurtenances.note:at exposure #1 front facade decorative cornice moulding in disrepair with spalling concrete and pieces seperating.rem:repair and maintain bldg exterior walls
Jun 10, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to maintain bldg walls or appurtenance. note: at exp#1 front facade decorative masonry work having pieces fallen off or spaling throughout entire bldg face. remedy: repair & or replace.
Mar 30, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to maintain building wall(s) or appurtenances. noted: at time of inspection i observed at exp1 spalling throughout decorative, masonry broke off and deteriorating brownstone need to make needed repair.
Jan 31, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to maintain building walls and appurtenances. at exposure 1 spalling throughout, decorative masonnry broke off and deteriorating brownstone. remedy: maintain exterior building walls
Dec 11, 2018 · Penalty $1,250
Resolve - Class - 1
Failure to maintain bldg walls or appurtenance. noted: at time of inspection observed at exp#1 at soffit-spaulding masonry & decorative ornament(casr iron)in disrepair broken off over entry need to mark necessa
Oct 23, 2018 · Penalty $3,125
Resolve - Class - 1
Failure to maintain building wall(s) and appurtenances. noted: at exp1at soffit-spaulding masonry and decorative ornament (cast iron) in disrepair/broken off over entry way of dwelling. openings in soffit with
Sep 6, 2018 · Penalty $625
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation #35332099h issued 06/04/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. rem: comply with commissi
Sep 6, 2018 · Penalty $1,250
Active - Class - 2
Failure to comply with the commissioners order contained in summons/violatin#35335450j issued on 06/09/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.rem;comply with commission
Sep 6, 2018 · Penalty $1,250
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation #35334549j issued on 06/09/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for c of c ,failure to m
Jul 26, 2018 · Penalty $1,250
Resolve
Show 29 more ↓
- Class - 1
Failure to maintain building walls or appurtenances. roof level chimney mortar has no strength and is like sand brick are about to fall ontoexp1 of building front is spalling in some areas. at exp3 in rear part
Jun 9, 2018 · Penalty $2,500
Resolve - Class - 2
Failure to maintain building in code compliant manner. fdny ripped open walls and floor in office on ground level and ceiling in the cellar level walls, floor, and ceiling need to be closed and fixed.rmdy:repai
Jun 4, 2018
Resolve - Class - 2
Occupancy contrary to that allowed by the c of o or bldg dept records.c of o#24991 indicates bldg as 3 sty w/1 apt at basement,3 furnished rooms at 1st sty 4 furnished rooms at 2nd sty & 4 furnished rooms at 3r
Jun 4, 2018 · Penalty $1,250
Resolve - Class - 2
Failure to maintain building in code compliant manner. lack of emergency lighting for exits, exit discharges and public corridors per bc 1006.1; 27.542. emergency lights not working by room 2018 when tested, al
Jun 4, 2018
Resolve - Class - 2
Failure to maintain building in code compliant manner. notice stoppingper bc 712.3; 28-345. at cellar level, holes in wall and ceiling in the boiler room no fire stop was used some areas done with foam which is
Jun 4, 2018
Resolve - Class - 2
Failure to maintain bld in code compliant manner.observed on 06/04/18 at above address in boiler rm located at cellar level,no fresh air intake intake in the boiler room.rem:repair and or replace.
Jun 4, 2018
Resolve - Class - 1
Work w/o a permit. noted: at basement level,a class'a'apt was removed. there are now 3 sro's,an office & security guards booth/office. remedy: obtain permit.
Jun 4, 2018 · Penalty $1,600
Active - Class - 2
B254,3a,38,50,50a,50b. as per class 2 b254 28-301.1 violating condi tions 3a,38, 50 both flues not "b" vent material through boiler rom wall into chimney base; 50a-cleanout missing at base of chimney; 50b
May 14, 2018 · Penalty $625
Active - Class - 1
An unlawful act.failure to comply w/orde of the comm.failure to correct and certify summ#35297493p idd on 12/14/17 for defective water main grounding connection.rem:comply w/ec code-obtain permit.
Mar 23, 2018 · Penalty $625
Resolve - Class - 2
Failure to maintain bldg wall(s) or appurtenances. noted: observed throughout front facade, cracks, spalling & missing pieces of stone @ various locations throughout structure. rem: maintain exterior bldg wall.
Dec 14, 2017 · Penalty $1,250
Resolve - Class - 2
Occupancy contrary to that allowed by the c of o or dob records. noted: c of o# 24991 indicates cellar to be storage, basement 1 apt 1st flr- 3 sro's, 2nd & 3rd flr- 4 sro's each, now 2nd & 3rd flrs has 5 sro's
Dec 14, 2017 · Penalty $3,000
Active - Class - 1
Failure to ground electrical systems observed @ water main located in cellar. main grounding conductor for bldgs electrical systems disconnected from water main pipe, floating ground. please know that failure t
Dec 14, 2017 · Penalty $12,000
Resolve - Class - 2
Occupancy contrary to that allowed by the c of o or bldg dept records. noted: c of o #24991 indicates cellar as storage,basement 1 apt,1st fl 3 sro's,2nd fl,4 sro's,& 3rd fl,4 sro's-now 1st fl has 3 sro's,1st,
Aug 24, 2017 · Penalty $3,000
Resolve - Class - 2
Failure to maintain bldg walls or appurtances. noted: observed at front facade of bldg,spalling throughout facade & pieces of masonry stone missing. remedy: maintain exterior bldg wall.
Aug 24, 2017 · Penalty $1,250
Resolve - Class - 1
Unapproved,unsafe,unsuitable electrical equipment,apparatus,materials,appliances or wiring in use. observed throughout basement & outdoors: exposed energized wiring,defective fixtures,defective wiring,open elec
Aug 24, 2017 · Penalty $1,600
Resolve - Class - 1
Failure to ground electrical systems. observed in basement at water main pipe: main grounding conductor for bldgs electrical system disconnected from water main;floating ground. failure to ground electrical sys
Aug 24, 2017 · Penalty $4,800
Resolve - Class - 1
Sec: fgc 408.2. future connection exist on gas piping. @ time of insp observed in the cellar several future connections installed on gas piping. this is prohibited by the requirements of the fgc. photo taken. r
Mar 17, 2017
Resolve - Class - 1
Sec: fgc 409.5.1. shut off gas valves to appliances shall be w/in 6ft of connection of the appliance upstream of a union & in the same room as the appliance. @ time of insp observed in the cellar the shut off v
Mar 17, 2017 · Penalty $1,600
Active - Class - 2
Occupancy contrary to that allowed by the c of o or bldg dept records.co#24991 indicates storage(cellar)1)apt(basement) 3)furnished room(1st fl),4)furnished rooms(2nd fl)& 4)furnished rooms(3rd fl). observed
Mar 17, 2017 · Penalty $1,200
Resolve - Class - 2
Failure to maintain bldg walls & appurtenances. spalling throughout front facade of bldg also pieces of masonry missing at time of inspection. remedy: comply w/notice of violation.
Sep 21, 2016 · Penalty $500
Resolve - Class - 2
Work w/o a permit. work noted: at cellar level erected full height partitions for 1 room & installed water & waste lines for 3pc bathroom(sink,toilet,shower). remedy: obtain permitor restore premises to prior
Feb 18, 2016 · Penalty $2,000
Active - Class - 2
Occupancy contrary to that allowed by the c of o or bldg dept records.dob's c of o #24991 indicates storage(cellar)1 apt(basement).(3)furnished rooms(1st fl).(4)furnished rooms(2nd fl)& (4)furnished rooms(3rd
Feb 18, 2016 · Penalty $3,000
Resolve - Class - 2
B254,3a,7d,15,16,34b,38,50,50a,50b. 50-both flues not b vent material,thru boiler room wall into chimney; 50a-cleanout missing at base of chimney; 50b-opening in boiler room door.
Jun 24, 2015 · Penalty $500
Active - Hazardous
Plumbing work w/o a permit. upon physical inspection found in bldg notto have a permit on dob file of army sprinkler for flrs base-4th. remedy: obtain a permit if feasible or restore to prior legal condition.
Oct 18, 2007 · Penalty $1,000
Active - Non-hazardous
Failure to provide required siamese connections. upon physical inspection found thru out bldg on flrs c-4th. sprinkler system having over 36heads w/ no siamese connection for fire dept @ st level. remedy:
Oct 18, 2007 · Penalty $2,500
Active - Non-hazardous
Failure to maintain plumbing & or/ appurtenances upon physical inspection found in basement @ washing machine piping not properly supported to wall. remedy: maintain plumbing & or/ appurtenances.
Oct 18, 2007 · Penalty $2,500
Resolve - Hazardous
Plumbing fixtures not properly trapped or vented. upon physical inspection found in basement drainage piping for washing machine not vented to the plumbing vent system. remedy: properly trap or vent fixture.
Oct 18, 2007 · Penalty $2,500
Active - Hazardous
51,32, collapsed breeching; replace breeding
May 31, 1994
Resolve - Non-hazardous
Seal breeching around clean out cap rempair ceiling in blr rom hole above main header seal up old chimney outlets remove form breechin 2x4 wood breeching need better support
Apr 19, 1994
Resolve
Complaints
- Unsanitary condition
Garbage/recycling storage
Apr 18, 2026 · Apt BLDG
Close - Electric
Power outage
May 30, 2018 · Apt 1
Close - Heat/hot water
Entire building
Nov 8, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 8, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 16, 2017 · Apt 1A
Close - Heat/hot water
Entire building
Jan 5, 2017 · Apt 302
Close - Heat/hot water
Entire building
Nov 16, 2016 · Apt L1
Close - Heat/hot water
Entire building
Feb 10, 2016 · Apt 202
Close - Heat/hot water
Entire building
Jan 18, 2016 · Apt 101
Close - Heat/hot water
Entire building
Mar 19, 2015 · Apt 101
Close
Show 3 more ↓
- Heat/hot water
Entire building
Feb 20, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 18, 2015 · Apt 104
Close - Heating
Heat related
Feb 7, 2012 · Apt 210
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C5)
- Year built
- 1910
- Floors
- 3
- Residential units
- 10
- Building area
- 3,672 ft²
- Lot area
- 1,799 ft²
- Zoning
- R6A
- Community board
- 109
- Council district
- 7
- Block / lot
- 2080 / 122
- Assessed value
- $223,650
- Landmark / historic district
- No
HPD registration #117319, last renewed Aug 14, 2025.
Questions about 515 West 148 Street
Who owns 515 West 148 Street?
The owner of record in NYC Department of City Planning PLUTO data is 515 West 148th Street.
Does 515 West 148 Street have violations?
Yes. NYC HPD has recorded 48 housing violations at this property.
Is 515 West 148 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 515 West 148 Street built?
City records list 1910 as the year it was built.
How many apartments are in 515 West 148 Street?
It has 10 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.