roofy

520 West 145 Street

Manhattan, NY 10031BBL 1-02076-0046Map

Owner of record: Hudson View II Owner LLC

520 West 145 Street is an elevator apartment building built in 1915 in Manhattan, 10031. It has 30 residential units across 5 floors. The owner of record is Hudson View II Owner LLC. HPD has recorded 199 housing violations here, most recently on June 18, 2026. 11 of the 50 most recent violations are still open.

HPD violations
199
DOB violations
42
ECB violations
12
HPD complaints
405

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Jun 18, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 199

  • B

    Remove all obstructions and repair all defects in wasteline pipe at bathtub in the bathroom located at apt 1f, 1st story, 1st apartment from west at north

    Jun 18, 2026 · Apt 1F

    Open — Nov sent out
  • B

    Remove all obstructions and repair all defects in wasteline pipe under washbasin at east wall in the bathroom located at apt 1f, 1st story, 1st apartment from west at north

    Jun 18, 2026 · Apt 1F

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 5th room from east located at apt 1f, 1st story, 1st apartment from west at north

    Jun 18, 2026 · Apt 1F

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 2nd room from east located at apt 1f, 1st story, 1st apartment from west at north

    Jun 18, 2026 · Apt 1F

    Open — Nov sent out
  • A

    Properly repair or replace the broken or defective intercom return system from bulding front to the west wall in the 2nd room from east located at apt 1f, 1st story, 1st apartment from west at north

    Jun 18, 2026 · Apt 1F

    Open — Civ14 mailed
  • B

    Refit door knob in the entrance located at apt 4c, 4th story, 2nd apartment from east at south

    Apr 16, 2026 · Apt 4C

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective counter balance spring at lower sash at 1st window from south on west wall in the 4th room from east at south located at apt 1f, 1st story, 1st apartment from west at north

    Apr 16, 2026 · Apt 1F

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 4c, 4th story, 2nd apartment from east at south

    Apr 16, 2026 · Apt 4C

    Open — Not complied with
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 4c, 4th story, 2nd apartment from east at south

    Apr 16, 2026 · Apt 4C

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at south wall and ceiling in the kitchen located at apt 4c, 4th story, 2nd apartment from east at south

    Apr 16, 2026 · Apt 4C

    Closed — Violation closed
Show 40 more ↓
  • A

    Paint with light colored paint to the satisfaction of this department north wall in the bathroom located at apt 4c, 4th story, 2nd apartment from east at south

    Apr 16, 2026 · Apt 4C

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective leaky shutoff valve at radiator on north wall in the 2nd room from east located at apt 1f, 1st story, 1st apartment from west at north

    Apr 16, 2026 · Apt 1F

    Open — Not complied with
  • A

    Paint with light colored paint to the satisfaction of this department east wall in the 2nd room from east located at apt 1f, 1st story, 1st apartment from west at north

    Apr 16, 2026 · Apt 1F

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... more than 10 sq ft at north wall in the 2nd room from east located at apt 1f, 1st story, 1st apartment from west at north

    Feb 22, 2026 · Apt 1F

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective lower window sash at west wall in the 4th room from east at south located at apt 1f, 1st story, 1st apartment from west at north

    Feb 22, 2026 · Apt 1F

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... more than 10 sq ft at north wall in the 2nd room from east located at apt 1f, 1st story, 1st apartment from west at north

    Feb 12, 2026 · Apt 1F

    Closed — Violation closed
  • B

    Remove all obstructions and repair all defects in drain pipe at sink in the bathroom located at apt 1f, 1st story, 1st apartment from west at north

    Feb 12, 2026 · Apt 1F

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... more than 10 sq ft at north wall in the kitchen located at apt 1f, 1st story, 1st apartment from west at north

    Feb 12, 2026 · Apt 1F

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt 1f, 1st story, 1st apartment from west at north

    Feb 12, 2026 · Apt 1F

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of a key operated lock installed at door to room with fire escape wondow in the 5th room from north located at apt 4c, 4th story, 2nd apartment from east at south

    Dec 6, 2025 · Apt 4C

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling, south and west walls in the 1st room from north located at apt 4c, 4th story, 2nd apartment from east at south

    Dec 6, 2025 · Apt 4C

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak above ceiling in the 1st room from north located at apt 4c, 4th story, 2nd apartment from east at south

    Dec 6, 2025 · Apt 4C

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 4c, 4th story, 2nd apartment from east at south

    Dec 6, 2025 · Apt 4C

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak above ceiling in the bathroom located at apt 4c, 4th story, 2nd apartment from east at south

    Dec 6, 2025 · Apt 4C

    Closed — Violation dismissed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt 4c, 4th story, 2nd apartment from east at south

    Dec 6, 2025 · Apt 4C

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak above ceiling in the kitchen located at apt 4c, 4th story, 2nd apartment from east at south

    Dec 6, 2025 · Apt 4C

    Closed — Violation dismissed
  • B

    Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at .. in the entrance located at apt 5f, 5th story, 1st apartment from west at north

    Apr 25, 2025 · Apt 5F

    Open — First no access to re- inspect violation
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 5f, 5th story, 1st apartment from west at north

    Apr 25, 2025 · Apt 5F

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system locked door at cellar

    Dec 12, 2024

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at hopper chute door at public hall, 5th story

    Dec 12, 2024

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 5f, 5th story, 1st apartment from west at north

    Dec 12, 2024 · Apt 5F

    Closed — Violation dismissed
  • B

    Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at .. in the entrance located at apt 5f, 5th story, 1st apartment from west at north

    Dec 12, 2024 · Apt 5F

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 2d, 2nd story, 3rd apartment from east at south

    Nov 16, 2024 · Apt 2D

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2d, 2nd story, 3rd apartment from east at south

    Nov 16, 2024 · Apt 2D

    Closed — Violation dismissed
  • C

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2d, 2nd story, 3rd apartment from east at south

    Nov 16, 2024 · Apt 2D

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at door in the bathroom located at apt 2d, 2nd story, 3rd apartment from east at south

    Nov 16, 2024 · Apt 2D

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 5f, 5th story, 1st apartment from west at north

    Nov 2, 2024 · Apt 5F

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 5a, 5th story, 1st apartment from north at east

    Nov 2, 2024 · Apt 5A

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system door to boiler room locked at cellar

    Nov 2, 2024

    Closed — Violation closed
  • B

    Replace with new the missing escutcheon plate at ceiling in the bathroom located at apt 2a, 2nd story, 1st apartment from north at east

    Aug 16, 2023 · Apt 2A

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... approximately 3sq feet on window casing in the bathroom located at apt 2a, 2nd story, 1st apartment from north at east

    Aug 16, 2023 · Apt 2A

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... approximately 2sq feet on window casing at second window from west at north in the 1st room from north at east located at apt 2a, 2nd story, 1st apartment from north at east

    Aug 16, 2023 · Apt 2A

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... approximately 3sq feet on window casing at first window from west at north in the 1st room from north at east located at apt 2a, 2nd story, 1st apartment from north at east

    Aug 16, 2023 · Apt 2A

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective assembly lock at door in the entrance located at apt 4e, 4th story, 4th apartment from east at south

    Jul 18, 2023 · Apt 4E

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective buzzer system from building entrance to phone line located at apt 4e, 4th story, 4th apartment from east at south

    Jul 18, 2023 · Apt 4E

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 4e, 4th story, 4th apartment from east at south

    Jul 18, 2023 · Apt 4E

    Closed — Violation closed
  • A

    Replace with new the missing eschutcheon plate ceiling at riser in the bathroom located at apt 4e, 4th story, 4th apartment from east at south

    Jul 18, 2023 · Apt 4E

    Closed — Violation dismissed
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at building front at 2nd fire escape from east, 3rd story

    Apr 24, 2023

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 2a, 2nd story, 2nd apartment from west at north

    Apr 21, 2023 · Apt 2A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the bathroom located at apt 2a, 2nd story, 2nd apartment from west at north

    Apr 21, 2023 · Apt 2A

    Closed — Violation closed

DOB building violations · 42

  • Immediate emergency anythingoptional

    To protect the pubilc safety, it is recommended to erect sidewalk shed along exp#1 (west 145 st) covering appx 26 linear feet, this measure will provide necesary protection for pedestrian until further repairs

    Nov 4, 2024

    Dob violation - active
  • Construction other optional

    Structure rendered non complaint. observed adjacent building 528 west 145 street. sustained excessive fire damage compromising egress at exp#1 handicapped ramp.

    Nov 2, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Apr 29, 2021

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 2, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 30, 2020

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2020

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2020

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 2, 2020

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
Show 32 more ↓
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 2, 2019

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2019

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 26, 2018

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 27, 2016

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 8, 2015

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 18, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 23, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 7, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 26, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 23, 2010

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 17, 2005

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 24, 2004

    Dob violation - resolved
  • Elevator elevatorrequired

    1p31570

    Mar 31, 2003

    Dob violation - resolved
  • Elevator elevatorrequired

    1p31570

    Jan 14, 2002

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Mar 8, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1993

    Dob violation - dismissed
  • Elevator elevatorrequired

    Device #1p31570

    Mar 9, 1991

    Vp*-violation unserved ecb- dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 26, 1990

    Dob violation - resolved
  • Elevator elevatorrequired

    (51)repair tile in car flooring repair light in cab

    Jul 20, 1988

    Dob violation - resolved

ECB violations · 12

  • Class - 2

    At time of inspection observed existing trash chute access gates are sealed with duct tape on 1st to 5th floor at all levels. tenant unable to use trash chute for household debris., repair and/or replace

    Sep 1, 2023 · Penalty $625

    Resolve
  • Class - 1

    No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. remedy; file application, install dlm a

    Jun 25, 2020 · Penalty $1,250

    Resolve
  • Class - 1

    Unapproved/unsafe/unsuitable electrical equipment,apparatus,materials,devices,appliances or wiring in use. apt 1f living room,bedrooms: defective wiring are in use,defective receptacles outlets are in use,

    Nov 4, 2015 · Penalty $4,000

    Resolve
  • Class - 2

    71/x/10,72/x/10,75/k/10,40/i/10,42/n/09,56/y/10,68/m/07,69/m/07,08/v/01,39/x/10,05/b/01/40-i-lever hole on m.r wall,42-n-remove jumper from fuse on controller.08-v-adjust leveling on 1st flr & bsmt fl/39-x-repa

    Feb 19, 2010 · Penalty $500

    Resolve
  • Non-hazardous

    08v01,15k10,15l11,16h12,35o02,37g12,35y02,35y14,50q03,57p17,57z0975u05. #15k10= bsmt #15l11= 1st floor not self closing #16h12=3,4, and 5 floors. 37g12= 1,2,and3 #50q3= motor wiring

    Nov 29, 1999 · Penalty $350

    Resolve
  • Non-hazardous

    8v,57z. car not leveled with landing, pit dirty and water leak.

    Apr 9, 1999

    Resolve
  • Non-hazardous

    43 m 43 l 57 x

    Mar 6, 1997 · Penalty $100

    Resolve
  • Non-hazardous

    03x,08v,11b,15l,21l,22d,35d,53x,57o,55m,74#,03x-fan 15l-2nd floor, make delf-closing 35d-smoke hole grating 74# perform all the work to comply with dob ciolations: 030991e 1176c3,100191e 1176cz and 072792e 1366

    Jul 13, 1994 · Penalty $1,000

    Resolve
  • Non-hazardous

    14m, 57z, 57o 57z - install sump-pump

    May 4, 1993 · Penalty $250

    Resolve
  • Non-hazardous

    8v1, 21l11, 35w6, 57z9, 57o2

    Jul 27, 1992 · Penalty $500

    Resolve
Show 2 more ↓
  • Non-hazardous

    73o;57y;36w;53x;

    Oct 1, 1991 · Penalty $1,000

    Resolve
  • Non-hazardous

    21i 35p 73o 8v 15x 57# 15 closer 57 water

    Mar 9, 1991 · Penalty $1,000

    Resolve

Complaints

  • Plumbing

    Radiator

    Mar 29, 2026 · Apt 1F

    Open
  • Plumbing

    Basin/sink

    Mar 20, 2026 · Apt 1F

    Close
  • Door/window

    Window pane

    Mar 20, 2026 · Apt 1F

    Close
  • Plumbing

    Bathtub/shower

    Mar 20, 2026 · Apt 1F

    Close
  • General

    Bell/buzzer/intercom

    Mar 10, 2026 · Apt 5F

    Close
  • Elevator

    Maintenance

    Feb 25, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 18, 2026 · Apt BLDG

    Close
  • Door/window

    Window frame

    Feb 16, 2026 · Apt 1F

    Close
  • Heat/hot water

    Entire building

    Feb 16, 2026 · Apt BLDG

    Close
  • Door/window

    Window frame

    Feb 16, 2026 · Apt 1F

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Feb 15, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 10, 2026 · Apt 3F

    Close
  • Heat/hot water

    Entire building

    Feb 9, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 9, 2026 · Apt 2B

    Close
  • Heat/hot water

    Entire building

    Feb 8, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 8, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 8, 2026 · Apt 1F

    Close
  • Heat/hot water

    Entire building

    Feb 8, 2026 · Apt BLDG

    Close
  • Plumbing

    Basin/sink

    Feb 5, 2026 · Apt 1F

    Close
  • Unsanitary condition

    Mold

    Feb 5, 2026 · Apt 1F

    Close
  • General

    Ventilation system

    Feb 5, 2026 · Apt 1F

    Close
  • Door/window

    Window frame

    Feb 5, 2026 · Apt 1F

    Close
  • Heat/hot water

    Entire building

    Feb 4, 2026 · Apt BLDG

    Close
  • General

    Bell/buzzer/intercom

    Feb 2, 2026 · Apt 5F

    Close
  • Heat/hot water

    Entire building

    Jan 21, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 21, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 21, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 14, 2026 · Apt BLDG

    Close
  • General

    Bell/buzzer/intercom

    Jan 8, 2026 · Apt 5F

    Close
  • General

    Bell/buzzer/intercom

    Dec 17, 2025 · Apt 5F

    Close
  • Heat/hot water

    Entire building

    Dec 14, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 9, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 9, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 6, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 3, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 3, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 3, 2025 · Apt BLDG

    Close
  • General

    Bell/buzzer/intercom

    Dec 1, 2025 · Apt 3B

    Close
  • Heat/hot water

    Entire building

    Nov 20, 2025 · Apt 1B

    Close
  • Heat/hot water

    Entire building

    Nov 16, 2025 · Apt BLDG

    Close
  • Door/window

    Door

    Aug 14, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Mold

    Jun 20, 2025 · Apt 1B

    Close
  • Water leak

    Slow leak

    Jun 20, 2025 · Apt 1B

    Close
  • Heat/hot water

    Apartment only

    Jan 10, 2025 · Apt 3C

    Close
  • Heat/hot water

    Entire building

    Dec 12, 2024 · Apt 1C

    Close
  • Unsanitary condition

    Mold

    Nov 14, 2024 · Apt 2D

    Close
  • Plumbing

    Steam pipe/riser

    Nov 14, 2024 · Apt 2D

    Close
  • Water leak

    Slow leak

    Nov 14, 2024 · Apt 2D

    Close
  • Heat/hot water

    Entire building

    Nov 6, 2024 · Apt BLDG

    Close
  • General

    Bell/buzzer/intercom

    Jul 20, 2024 · Apt 5A

    Close

Sales history

DatePriceTypeUnits
Jun 30, 2026$25,800,000Rentals - elevator apartments30

Building details

Building type
Elevator apartment building (D3)
Year built
1915
Floors
5
Residential units
30
Building area
25,050 ft²
Lot area
6,700 ft²
Zoning
R7D
Community board
109
Council district
7
Block / lot
2076 / 46
Assessed value
$2,101,500
Landmark / historic district
No

HPD registration #104198, last renewed Jul 8, 2025.

Questions about 520 West 145 Street

Who owns 520 West 145 Street?

The owner of record in NYC Department of City Planning PLUTO data is Hudson View II Owner LLC.

Does 520 West 145 Street have violations?

Yes. NYC HPD has recorded 199 housing violations at this property.

Is 520 West 145 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 520 West 145 Street built?

City records list 1915 as the year it was built.

How many apartments are in 520 West 145 Street?

It has 30 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.