415 West 150 Street
Manhattan, NY 10031BBL 1-02065-0022Map
Owner of record: Icer Of 415 West 150th Street LLC
415 West 150 Street is an elevator apartment building built in 2007 in Manhattan, 10031. It has 16 residential units across 7 floors. The owner of record is Icer Of 415 West 150th Street LLC. HPD has recorded 92 housing violations here, most recently on May 8, 2026. 2 of the 50 most recent violations are still open.
- HPD violations
- 92
- DOB violations
- 33
- ECB violations
- 31
- HPD complaints
- 138
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 92
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 8, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 201, 2nd story, 1st apartment from south at west
Feb 16, 2026 · Apt 201
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Feb 16, 2026
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water temperature exceeding 130 degrees at all water fixtures in the entire apartment located at apt 503, 5th story, 1st apartment from north at east
Nov 6, 2025 · Apt 503
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 202, 2nd story, 1st apartment from west at north
Sep 27, 2025 · Apt 202
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
Sep 27, 2025
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east located at apt 402, 4th story, 1st apartment from west at north
Jul 19, 2024 · Apt 402
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 402, 4th story, 1st apartment from west at north
Jul 19, 2024 · Apt 402
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color header and jambs at 1st window from west at north in the 1st room from east located at apt 402, 4th story, 1st apartment from west at north
Jul 19, 2024 · Apt 402
Closed — Violation dismissed - BHazardous
Properly secure the loose light fixture at ceiling at public hall, 1st story
Jul 10, 2024
Open — Nov sent out
Show 40 more ↓
- BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Jun 28, 2024
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the recycle garbage at basement
Jun 28, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at hooper door at compactor closet, 7th story
Jan 29, 2024
Closed — Violation closed - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at east door to roof at bulkhead staircase a
Jan 29, 2024
Closed — Violation dismissed - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at west door to roof at bulkhead staircase b
Jan 29, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ....(latch set) in the entrance located at apt 602, 6th story, 1st apartment from west at north
Jan 10, 2024 · Apt 602
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at bulkhead door leading to roof at public hall stairs, 7th story
Jan 10, 2024
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north located at apt 301, 3rd story, 1st apartment from south at west
Sep 12, 2023 · Apt 301
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color window header at south wall in the 3rd room from north located at apt 301, 3rd story, 1st apartment from south at west
Sep 12, 2023 · Apt 301
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approximately 1 sq ft at window header in the 3rd room from north located at apt 301, 3rd story, 1st apartment from south at west
Sep 12, 2023 · Apt 301
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). inoperative in the entire apartment located at apt 301, 3rd story, 1st apartment from south at west
Sep 12, 2023 · Apt 301
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector inoperative in the entire apartment located at apt 301, 3rd story, 1st apartment from south at west
Sep 12, 2023 · Apt 301
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 301, 3rd story, 1st apartment from south at west
Sep 12, 2023 · Apt 301
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 402, 4th story, 1st apartment from west at north
Aug 5, 2023 · Apt 402
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt 402, 4th story, 1st apartment from west at north
Aug 5, 2023 · Apt 402
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... 5 sq ft at west wall and 5 sq ft ceiling. in the 1st room from east located at apt 402, 4th story, 1st apartment from west at north
Aug 5, 2023 · Apt 402
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and west wall in the 1st room from east located at apt 402, 4th story, 1st apartment from west at north
Aug 5, 2023 · Apt 402
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the 1st room from east located at apt 402, 4th story, 1st apartment from west at north
Aug 5, 2023 · Apt 402
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 402, 4th story, 1st apartment from west at north
Aug 5, 2023 · Apt 402
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at vestibule fire door , 1st story
Aug 5, 2023
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Nov 25, 2022
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 202, 2nd story, 1st apartment from west at north
Nov 25, 2022 · Apt 202
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and west wall in the 1st room from east located at apt 601, 6th story, 1st apartment from south at west
Nov 25, 2022 · Apt 601
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... approx 15 sq. ft at ceiling in the 1st room from east located at apt 601, 6th story, 1st apartment from south at west
Nov 25, 2022 · Apt 601
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 402, 4th story, 1st apartment from west at north
Nov 21, 2022 · Apt 402
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Nov 21, 2022
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 402, 4th story, 1st apartment from west at north
Nov 21, 2022 · Apt 402
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 402, 4th story, 1st apartment from west at north
Nov 21, 2022 · Apt 402
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 201, 2nd story, 1st apartment from south at west
Sep 19, 2022 · Apt 201
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 201, 2nd story, 1st apartment from south at west
Sep 19, 2022 · Apt 201
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the kitchen located at apt 303, 3rd story, 1st apartment from north at east
Sep 15, 2022 · Apt 303
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective window frame at north wall in the 1st room from north at east located at apt 302, 3rd story, 1st apartment from west at north
Sep 15, 2022 · Apt 302
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 302, 3rd story, 1st apartment from west at north
Sep 15, 2022 · Apt 302
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 1st room from north at west located at apt 302, 3rd story, 1st apartment from west at north
Sep 15, 2022 · Apt 302
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and north wall in the 1st room from north at west located at apt 302, 3rd story, 1st apartment from west at north
Sep 15, 2022 · Apt 302
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 3rd room from north located at apt 302, 3rd story, 1st apartment from west at north
Sep 15, 2022 · Apt 302
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at north wall in the 3rd room from north located at apt 302, 3rd story, 1st apartment from west at north
Sep 15, 2022 · Apt 302
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and east wall in the kitchen located at apt 303, 3rd story, 1st apartment from north at east
Sep 15, 2022 · Apt 303
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... at north wall approx. 20 sq. ft in the 1st room from north at east located at apt 302, 3rd story, 1st apartment from west at north
Sep 15, 2022 · Apt 302
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 4th room from north located at apt 303, 3rd story, 1st apartment from north at east
Sep 15, 2022 · Apt 303
Closed — Violation dismissed
DOB building violations · 33
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 10, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 16, 2019
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 8a technical report by 02/21/2017
May 31, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 26, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 10, 2015
Dob violation - resolved - Construction other optional
Boro-comm has ordered all work stopped
Apr 18, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 13, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed
Show 23 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 11, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 11, 2013
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2010 inspection/test
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 26, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 26, 2011
Dob violation - resolved - Construction other optional
C-construction other optional
Jan 5, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 27, 2010
Dob violation - resolved - Construction other optional
Failure to provide approved plans or stop drawing on site for underpinning sheeting and shoring noted: at time of inspection an active site plans provided are missing details for propose shoring sheeting and underpinning remedy: stop work except to make safe provide amended plans 7188024594
Oct 30, 2007
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 5, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed
ECB violations · 31
- Class - 2
Class 2: phone inoperative repair & connect service to 24 hr emergency operator. restore service to basement level. no access to motor room & pit.
Apr 30, 2025
Resolve - Class - 2
No access to motor room at time of inspection, must provide access to motor room. superintendent unavailable during inspection, code for padlock he gave me did not work and did not respond to further communicat
Aug 28, 2024
Resolve - Class - 2
Class 2: 53.k.10 governor ropes rusted. repair & replace. 52.k.10 hoist ropes rusted. check counterweight ropes repiar & replace all ropes.
Nov 1, 2022 · Penalty $310
Resolve - Class - 2
Class 2: 2.x.10 phone inoperative repair & program to 24 emergency operator. 16.m.7 sight guards missing from both front & side hoist doors. install sight guards. 40.z.2 water leak in motor room. repair & close
Nov 1, 2022 · Penalty $310
Resolve - Class - 1
Failure to maintain building in a code compliant manner - household debris on the stairwell on the 5th and 6th floor, remove obstruction
Mar 19, 2022 · Penalty $312
Resolve - Class - 1
Failure to maintrain building in a code compliant manner: under cover of the balcony (603) has fallen onto the balcony below (503) exposing the rusted metal, repair and/replace
Mar 19, 2022 · Penalty $1,250
Resolve - Class - 1
No door lock monitoring installed in controller as mandated in appendix k of the 2014 building code. remedy: install dlm, file and perform test with nyc dob
Aug 9, 2021 · Penalty $1,250
Resolve - Class - 2
Repair outside communication .
Jul 3, 2020 · Penalty $625
Resolve - Class - 2
41l10,42g11,67x10. 41l10-machine room door lock defective repair 42g11-improper fusing on the controller; 67x10-in car phone not working.
Mar 7, 2019
Resolve - Class - 1
Failure to provide safety measures, such as sidewalk shed's fence etc where require to protect and secure public safety from documented unsafe facada as per 1rcny-103-04.facade technical report file unsafe noti
Jan 31, 2019
Resolve
Show 21 more ↓
- Class - 2
Failure to submit acceptable 8th round report of critical exmination documenting condition of exterior walls and appurtenances required by 28-302.4 for control #814863.submit required technical report.
May 18, 2018 · Penalty $1,250
Resolve - Class - 1
Cease use cu97x10/ cu27x10/ cu26x10/ cu91x10/ cu61x10/ cu27b09/ 07m07/100m07/ 100m07/ 6m07/ 96m07/ 96m07/ (91-x-10) stop switch top of car run box not working (27-x-10) gov electrical switch not working (26-x-1
May 13, 2014 · Penalty $1,000
Resolve - Class - 2
The permit for sidewalk shed shall be posted in visible place. noted: no permit posted for sidewalk shed. remedy: post permit.
Jan 24, 2009 · Penalty $400
Resolve - Class - 2
Failure to safeguard persons & property affected by construction operations. 'no smoking' signs w/i construction site not observed or inadequate in violation of nyc fire code 1404.1 & fc 310. remedy: safeguard
Nov 15, 2008 · Penalty $1,200
Resolve - Class - 2
Failure to safeguard all persons & property affected by construction operations. observed smoking w/i construction site in violation of nyc fire code 1404.1. smoking observed on 1st fl near center staircase.
Nov 15, 2008 · Penalty $1,200
Resolve - Class - 2
Failure to provide approved/accepted plans at jobsite at time of inspection a) no drawing for supported scaffold over 40 remedy:provide plans
Sep 10, 2008 · Penalty $250
Resolve - Class - 1
Every damaged or weaken scaffold shall be immediately repaired or secured & shall not be used until satisfactory repairs have been complete a) 71' of supported scaffold resting on bent frame remedy:repair & sec
Sep 10, 2008 · Penalty $1,600
Resolve - Class - 1
Safe points of anchorage include structural members of a bldg a)supporrted scaffold not tie back into bldg remedy:provide anchorage
Sep 10, 2008 · Penalty $1,600
Resolve - Class - 1
Scaffold platform shall be provided w/ a guardrail system & toeboard a) missing guardrail system & toeboard remedy:provide guardrails
Sep 10, 2008 · Penalty $1,600
Resolve - Class - 1
All platforms shall be tied down cleated or other wise restranded by hooks or equilvalent means to prevent dislodgement c) planks not tie down remedy:conform to code
Sep 10, 2008 · Penalty $1,600
Resolve - Class - 1
Frames & panels shall be joined together vertically by coupling or stacking pins or equivalent means remedy:comply w/code
Sep 10, 2008 · Penalty $1,600
Resolve - Class - 1
Two or more two point suspension scaffolds shall not be combined into one by bridging the distance between them or by any other form of connection remedy:comply w/code
Sep 10, 2008 · Penalty $1,600
Resolve - Class - 1
Suspended scaffolds shall be erected & operated in such a manner that suspension elements are vertical & in a plane parallel to the wall at all times
Sep 10, 2008 · Penalty $1,600
Resolve - Class - 1
Inadequate safety measures operation hoisting equipment in unsafe manner a) one 1) tie back per rig remedy:discontinue use
Sep 10, 2008 · Penalty $4,800
Resolve - Class - 2
Failure to maintain adequate housekeeping a) sidewalk shed loaded withpallets remedy:maintain adequate housekeeping
Sep 10, 2008 · Penalty $400
Resolve - Class - 2
Comply with nyc chapter code subchapter 18 nyc bldg cide 27-989 a bldg75ft in height shall provide & elevators readiness for fire dept. & service all fls
Aug 28, 2008 · Penalty $500
Resolve - Hazardous
Work contrary to approved dob plans & application.
Jun 13, 2008 · Penalty $500
Resolve - Non-hazardous
Failure to provide required lot line construction fence noted:at time of inspection an active excavation site construction fence is missing at lot line ribbon(east side)at#801 st nicholas & at#417 w 150 st w si
Oct 30, 2007
Resolve - Non-hazardous
Failure to provide protection a side of excavation noted:at time of inspection an active excavation site an open cut of approx 10'deep at rear of excavation site no sheeting or shoring provided job#104523464.re
Oct 30, 2007
Resolve - Non-hazardous
Failure to notify dob w/in 24-48hrs of the start of excavation as required by rule 52.noted:at time of inspection no notification to dob prior excavation job#104523464.remedy:officially notify dob call212227441
Oct 30, 2007 · Penalty $200
Resolve - Non-hazardous
Failure to safeguard public & property affected by construction operations.noted:at time of inspection an active excavation site adjacent property side yard is undermined#801 st nicholas ave also observed crack
Oct 30, 2007
Resolve
Complaints
- Elevator
Maintenance
Oct 21, 2026 · Apt BLDG
Open - Water leak
Heavy flow
Aug 20, 2026 · Apt 402
Close - Water leak
Slow leak
Aug 18, 2026 · Apt 201
Close - Unsanitary condition
Mold
Aug 18, 2026 · Apt 201
Close - Heat/hot water
Entire building
Aug 12, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 12, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 12, 2026 · Apt BLDG
Close - Water leak
Damp spot
Apr 6, 2026 · Apt 201
Close - Heat/hot water
Apartment only
Feb 16, 2026 · Apt 502
Close - Heat/hot water
Entire building
Feb 16, 2026 · Apt BLDG
Close
Show 40 more ↓
- Water leak
Slow leak
Feb 16, 2026 · Apt 602
Close - Unsanitary condition
Mold
Feb 16, 2026 · Apt 602
Close - Paint/plaster
Ceiling
Feb 16, 2026 · Apt 602
Close - Heat/hot water
Entire building
Feb 16, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 16, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 16, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 16, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 16, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 16, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 16, 2026 · Apt 702
Close - Water leak
Heavy flow
Feb 16, 2026 · Apt 702
Close - Heat/hot water
Entire building
Feb 16, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 15, 2026 · Apt BLDG
Close - Plumbing
Water supply
Feb 15, 2026 · Apt BLDG
Close - Water leak
Heavy flow
Feb 14, 2026 · Apt 702
Close - Electric
No lighting
Feb 14, 2026 · Apt 702
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt BLDG
Close - Elevator
Maintenance
Feb 8, 2026 · Apt BLDG
Close - Elevator
Maintenance
Feb 8, 2026 · Apt BLDG
Close - Elevator
Maintenance
Feb 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 4, 2025 · Apt 503
Close - Heat/hot water
Entire building
Nov 3, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 3, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 3, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 26, 2025 · Apt 202
Close - Door/window
Door
Aug 15, 2025 · Apt 201
Close - Water leak
Heavy flow
Jul 16, 2025 · Apt 201
Close - Appliance
Refrigerator
Jul 7, 2025 · Apt 201
Close - Door/window
Door
Jun 24, 2025 · Apt 501
Close - Heat/hot water
Entire building
Jan 20, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 21, 2024 · Apt 202
Close - Water leak
Heavy flow
Jul 7, 2024 · Apt 402
Close - Water leak
Slow leak
Jul 7, 2024 · Apt 402
Close - Unsanitary condition
Garbage/recycling storage
Apr 26, 2024 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Feb 10, 2024 · Apt BLDG
Close - Plumbing
Water supply
Jan 9, 2024 · Apt BLDG
Close - Door/window
Door
Nov 5, 2023 · Apt LOBBY
Close - Door/window
Door
Oct 21, 2023 · Apt 602
Close - Door/window
Door
Oct 21, 2023 · Apt 503
Close - Door/window
Door
Oct 21, 2023 · Apt LOBBY
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 2007
- Floors
- 7
- Residential units
- 16
- Building area
- 29,529 ft²
- Lot area
- 4,996 ft²
- Zoning
- R7A
- Community board
- 109
- Council district
- 9
- Block / lot
- 2065 / 22
- Assessed value
- $2,434,050
- Landmark / historic district
- No
HPD registration #143320, last renewed Sep 11, 2025.
Questions about 415 West 150 Street
Who owns 415 West 150 Street?
The owner of record in NYC Department of City Planning PLUTO data is Icer Of 415 West 150th Street LLC.
Does 415 West 150 Street have violations?
Yes. NYC HPD has recorded 92 housing violations at this property.
Is 415 West 150 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 415 West 150 Street built?
City records list 2007 as the year it was built.
How many apartments are in 415 West 150 Street?
It has 16 residential units and 17 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.