roofy

59 Edgecombe Avenue

Manhattan, NY 10030BBL 1-02048-0001Map

Owner of record: St Marks Meth Epis Ch

59 Edgecombe Avenue is a religious facility built in 1946 in Manhattan, 10030. The owner of record is St Marks Meth Epis Ch. HPD has recorded 6 housing violations here, most recently on June 2, 2010. 6 of the 6 most recent violations are still open.

HPD violations
6
DOB violations
11
ECB violations
12
HPD complaints
39

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Jun 2, 2010

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 6

  • B

    Abate the nuisance consisting of bedbugs in the entire apartment located at apt 6c, 6th story, 1st apartment from east at south

    Jun 2, 2010 · Apt 6C

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the walls in the kitchen located at apt 6c, 6th story, 1st apartment from east at south

    Jun 2, 2010 · Apt 6C

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and walls in the 1st room from east at south located at apt 6c, 6th story, 1st apartment from east at south

    Jun 2, 2010 · Apt 6C

    Open — Nov sent out
  • B

    M/d law abate the nuisance consisting of evidence of water leak at the ceiling and south wall in the 2nd room from east at south located at apt 6c, 6th story, 1st apartment from east at south

    Jun 2, 2010 · Apt 6C

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective wood floor at the entrance in the 2nd room from east at south located at apt 6c, 6th story, 1st apartment from east at south

    Jun 2, 2010 · Apt 6C

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall in the 2nd room from east at south located at apt 6c, 6th story, 1st apartment from east at south

    Jun 2, 2010 · Apt 6C

    Open — Nov sent out

DOB building violations · 11

  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2022

    Dob violation - dismissed
  • Construction other optional

    Failure to maintain building in code compliant manner. access provided to sanctuary noted plaster / mortar / stucco actively releasing from terra-cotta perimeter exterior walls and falling to interior sanctuary area creating an immediately hazardous condition for sanctuary occupants.

    May 16, 2022

    Dob violation - active
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2021

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jun 9, 2021

    Dob violation - active
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Apr 29, 2021

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 3, 2021

    Dob violation - dismissed
  • Construction other optional

    Due to vehicle striking sidewalk shed displacing one column & 1 cross brace

    Jul 25, 2020

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 24, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 13, 2016

    Dob violation - dismissed
Show 1 more ↓
  • Immediate emergency anythingoptional

    Imegncy-immediate emergency anythingoptional

    Apr 21, 2016

    Dob violation - dismissed

ECB violations · 12

  • Class - 2

    Failure to maintain bldg in codecompliant manner.atoi noted@facade exp4 minor cracking note overhead protection in place to protect public.

    May 13, 2021 · Penalty $3,125

    Resolve
  • Class - 1

    Failure to maintain building exterior walls in a code complaint manner. noted: building exterior walls in disrepair and deteriorated with cracked decorative masonry arch above exposure # 1 and # 4 entrance door

    Mar 9, 2021 · Penalty $6,250

    Active
  • Class - 2

    Failure to obtain a temp. construction permit prior to installation/use of temporary construction equipment.note:at time of comp inspection i observed supported pipe scaffold erected on top of sidewalk shed app

    Nov 30, 2020 · Penalty $625

    Resolve
  • Class - 2

    Temporary construction equipment onsite:expired permit.note at time ofcomp inspection i observed sidewalk shed erected with supported scaffold on top.upon research in bis system it shows sidewalk shed permit ex

    Nov 30, 2020

    Resolve
  • Class - 2

    Pedestrian protection does not meet code specification note:at time of comp inspection i observed sidewalk shed erected and dues cover fullwidth of sidewalk as required by (bc 3307.6.3)this condition creates a

    Nov 30, 2020 · Penalty $625

    Resolve
  • Class - 2

    Failure to maintain sidewalk shed parapet panels note:at time of comp inspection i observed sidewalk shed erected and missing approx 4 parapet panels.this condition creates a hazard to pedestrians walking under

    Nov 30, 2020 · Penalty $625

    Resolve
  • Class - 1

    Bc 3314.8.2 supported scaffold debris netting. note:at time of comp inspection i observed supported pipe scaffold erected on top of sidewalkshed w/ large gaps and netting blowing in the wind. this condition cre

    Nov 30, 2020 · Penalty $2,500

    Resolve
  • Class - 2

    Sidewalk shed does not meet code specs. noted: at time of inspection underside lights for sidewalk shed on st. nicholas av side are not littime of inspection 6:50am. rmdy: conform shed to code specs.

    Jan 12, 2017 · Penalty $5,000

    Resolve
  • Class - 2

    Sidewalk shed parapet sign is not in compliance with section. noted:attime of inspection sidewalk shed sign does not indicate the address ofthe site and the name of the building owner.rmdy:provide sidewalk shed

    Jan 12, 2017 · Penalty $2,000

    Resolve
  • Class - 2

    Failure to comply with the commissioner's order contained in nov#35195094k issued on 06/2/16 &to file a certificate of correction pursuant to 28-201.1,28-204.4 &1rcny 102-01.noted:no document file for certifica

    Aug 18, 2016 · Penalty $2,000

    Resolve
Show 2 more ↓
  • Class - 1

    Failure to maintain bldg in code compliant manner.defect noted @ exp3 along st nicholas ave near west 138 st.2nd story.2nd window from left side of elevation.ornamental stone is spalling.eroding & breaking.rem

    Jun 2, 2016 · Penalty $1,030

    Resolve
  • Class - 1

    Failure to maintain bldg in code compliant manner. defect noted: at exp#3,along st nicholas ave near west 138 street. 2nd sty,2nd window from left side of elevation,oramental stone is spalling,eroding & breakin

    Apr 18, 2016 · Penalty $2,500

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Nov 13, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 7, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Dec 10, 2024 · Apt 1

    Close
  • Heat/hot water

    Entire building

    Nov 30, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 21, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 15, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 6, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 31, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 16, 2023 · Apt 2C

    Close
  • Safety

    Smoke detector

    Jul 17, 2020 · Apt 4D

    Close
Show 29 more ↓
  • Water leak

    Slow leak

    Jul 17, 2020 · Apt 4D

    Close
  • Heat/hot water

    Entire building

    Mar 6, 2019 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 29, 2017 · Apt 2C

    Close
  • Heat/hot water

    Entire building

    Oct 2, 2016 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Mar 9, 2016 · Apt 6F

    Close
  • Heat/hot water

    Apartment only

    Mar 8, 2016 · Apt 6F

    Close
  • Heat/hot water

    Apartment only

    Feb 6, 2016 · Apt 6F

    Close
  • Heat/hot water

    Apartment only

    Jan 3, 2016 · Apt 6F

    Close
  • Heat/hot water

    Apartment only

    Dec 10, 2015 · Apt 6F

    Close
  • Heat/hot water

    Entire building

    Dec 4, 2015 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 17, 2015 · Apt 3

    Close
  • Heating

    Heat related

    Nov 10, 2011 · Apt 5E

    Close
  • Paint/plaster

    Ceiling

    May 21, 2010 · Apt 6C

    Close
  • Paint/plaster

    Wall

    May 21, 2010 · Apt 6C

    Close
  • Paint/plaster

    Ceiling

    May 21, 2010 · Apt 6C

    Close
  • Electric

    Lighting

    May 21, 2010 · Apt 6C

    Close
  • Plumbing

    Water-leaks

    May 21, 2010 · Apt 6C

    Close
  • Paint/plaster

    Wall

    May 21, 2010 · Apt 6C

    Close
  • Paint/plaster

    Ceiling

    May 21, 2010 · Apt 6C

    Close
  • Paint/plaster

    Wall

    May 21, 2010 · Apt 6C

    Close
  • Nonconst

    Vermin

    May 21, 2010 · Apt 6C

    Close
  • Nonconst

    Vermin

    May 21, 2010 · Apt 6C

    Close
  • Nonconst

    Vermin

    Jun 5, 2008 · Apt NA

    Close
  • Nonconst

    Vermin

    Jun 5, 2008 · Apt NA

    Close
  • Nonconst

    Vermin

    Aug 16, 2007 · Apt 6B

    Close
  • General

    Doors

    Jan 25, 2007 · Apt 2A

    Close
  • Heating

    Heat related

    Oct 13, 2006 · Apt 8B

    Close
  • Heating

    Heat related

    Feb 18, 2006 · Apt 2A

    Close
  • Heating

    Heat related

    Dec 5, 2005 · Apt 2A

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Religious facility (M1)
Year built
1946
Floors
3.5
Residential units
—
Building area
25,505 ft²
Lot area
6,887 ft²
Zoning
R7-2
Community board
110
Council district
9
Block / lot
2048 / 1
Assessed value
$1,443,600
Landmark / historic district
Dorrance Brooks Square Historic District

Questions about 59 Edgecombe Avenue

Who owns 59 Edgecombe Avenue?

The owner of record in NYC Department of City Planning PLUTO data is St Marks Meth Epis Ch.

Does 59 Edgecombe Avenue have violations?

Yes. NYC HPD has recorded 6 housing violations at this property.

Is 59 Edgecombe Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 59 Edgecombe Avenue built?

City records list 1946 as the year it was built.