102 Bradhurst Avenue
Manhattan, NY 10039BBL 1-02045-7502Map
Owner of record: Unavailable Owner
102 Bradhurst Avenue is a condominium built in 2005 in Manhattan, 10039. It has 135 residential units across 11 floors. The owner of record is Unavailable Owner. HPD has recorded 24 housing violations here, most recently on September 2, 2026. 11 of the 24 most recent violations are still open.
- HPD violations
- 24
- DOB violations
- 27
- ECB violations
- 18
- HPD complaints
- 61
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 24
- BHazardous
Properly repair or replace the broken or defective window frame casing at 1st window from south at west wall in the 1st room from north located at apt 1004, 4th story, 1st apartment from west at north
Sep 2, 2026 · Apt 1004
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective window frame casing at 2nd window from south at west wall in the 1st room from north located at apt 1004, 4th story, 1st apartment from west at north
Sep 2, 2026 · Apt 1004
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north located at apt 1004, 4th story, 1st apartment from west at north
Sep 2, 2026 · Apt 1004
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at west wall in the 1st room from north located at apt 1004, 4th story, 1st apartment from west at north
Sep 2, 2026 · Apt 1004
Open — Notice of issuance sent to tenant - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north located at apt 1004, 4th story, 1st apartment from west at north
Sep 2, 2026 · Apt 1004
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1004, 4th story, 1st apartment from west at north
Sep 2, 2026 · Apt 1004
Open — Notice of issuance sent to tenant - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sqft at ceiling in the 2nd room from north at west located at apt 505, 5th story, 4th apartment from west at north
Aug 20, 2026 · Apt 505
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north at west located at apt 505, 5th story, 4th apartment from west at north
Aug 20, 2026 · Apt 505
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak over the ceiling in the 2nd room from north at west located at apt 505, 5th story, 4th apartment from west at north
Aug 20, 2026 · Apt 505
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 605, 6th story, 1st apartment from south at west
Feb 18, 2026 · Apt 605
Open — Nov sent out
Show 14 more ↓
- BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 605, 6th story, 1st apartment from south at west
Feb 18, 2026 · Apt 605
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 9, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 4, 2019
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor ... at public hall
Oct 25, 2019
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box ... at public hall
Oct 25, 2019
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system ... at public hall
Oct 25, 2019
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall
Oct 25, 2019
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall
Oct 25, 2019
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Oct 25, 2019
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall
Oct 25, 2019
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 14; wg to replace = 0; wg to repair = 0; in the 1st bedroom from north located at apt 1104, 11th story, 1st apartment from west at north
Oct 25, 2019 · Apt 1104
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures gas range in the kitchen located at apt 405, 4th story, 1st apartment from north at east , section at northwest
Jun 14, 2013 · Apt 405
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling at public hall, 6th story
Jun 14, 2013
Closed — Violation closed - BHazardous
Repair the broken or defective connection at wasteline at drainpipes ( 2 ) at ceiling at basement
Jun 9, 2011
Closed — Violation closed
DOB building violations · 27
- Construction other optional
Failure to maintain building in a code compliant manner.note observed bulging masonry sections at several locations on exp1,4 west,south ele vation.remedy:fix and/or replace
May 14, 2024
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2022
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Jul 31, 2019
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 8a technical report by 02/21/2017
May 31, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 25, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 25, 2017
Dob violation - resolved
Show 17 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Dec 1, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 1, 2016
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 28, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 28, 2015
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 2, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 2, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 14, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 14, 2011
Dob violation - resolved - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed
ECB violations · 18
- Class - 1
Work without a permit.as noted:at the time of inspection i observed construction fence on exposure#4 south elevtation but there were no permit obtained for the installation of the fence.rem:obtain permit for th
Oct 1, 2025 · Penalty $1,250
Resolve - Class - 2
Storage zone area adjacent to public sidewalk consists barriers,debris nets reducing visibility unto public sidewalk.hazard for pedestrians in event of emergency,first responders unable to see due to view obstr
Apr 14, 2025
Resolve - Class - 2
Observed scaffold frames connections 7 and 9 floor roof setback not conform to pe drawings missing details mix components in use to support 6 foot walk through frames.hazard structural stability for workers lea
Apr 14, 2025
Resolve - Class - 2
At 11 story observed pulley system for hoisting materials at scaffold.upon request manufacture specs per bc3301.1.3 and pe design drawings per bc3301.6 failed to provide created hazard of unknown conformance to
Apr 14, 2025 · Penalty $1,250
Resolve - Class - 2
Failure to file acceptable amended cycle 8a and 9a report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control#914140.agg1:prior nov 37022057z under 28
Jan 16, 2024 · Penalty $3,125
Active - Class - 2
Boiler 01, prvs above boiler pres rating-backflow valve leaking and flooding floor-defective prvs on boilers 01, 02 and 03-exposed electrical on hw boilers circulating pumps-discharges for prvs not piped-main s
Feb 14, 2022
Resolve - Class - 2
Failure to file acceptable amended cycle8a report indicating correction of unsafe conditions described in initial facades report required by28-302.5 for control#814140.file acceptable report
Oct 8, 2021 · Penalty $1,250
Active - Class - 2
Outside comm inoperative , repair
Oct 21, 2020
Resolve - Class - 2
Outside comm inoperative , repair
Oct 21, 2020
Resolve - Class - 2
28-105.1 faiure to obtain permit. noted: at time of inspection i observed sidewalk shed in place with out valid permit. remedy: comply with code obtain permit.
Nov 9, 2018 · Penalty $625
Resolve
Show 8 more ↓
- Class - 2
Failure to submit acceptable 8th round report of critical examination documenting condition of exterior walls and appurtenances required by 28-302.4 for control # 814140.remedy: submit required technical report
May 18, 2018 · Penalty $3,125
Resolve - Non-hazardous
Expired permit standpipe permit upon insp standpipe permit# 104002687 ex 07/20/06 # 104002687-sd stand pipe erected to 6th fl.remedy:stop all work on stand pipe renew permit as per bld code call best of for re
Aug 9, 2006 · Penalty $250
Resolve - Non-hazardous
Expired permit sprinkler upon insp sprinkler permit# 104002687-01sp expired on 07/20/06.remedy:stop all work on sprinkler system renew permits call best sq for reinsp
Aug 9, 2006 · Penalty $130
Resolve - Hazardous
Unsafe storage of materials at edge of bldg nb#103856640 during inspection brick,sement blocks & bags of sand have been stored on edge of bldg from 3 to 7 fl.remedy:maintain storage as per code remove materials
Jul 26, 2006 · Penalty $1,250
Resolve - Hazardous
Failure to protect roof of adjoining property during construction operations nb#103856640 on inspection nb approx.constructed to 7th fl 2 level above adjoining bldg & no roof protect provided as per code
Jul 26, 2006 · Penalty $500
Resolve - Hazardous
Sidewalk shed does not meet building code specifications.building is under demolition.the side of the shed toward the structure is not solidly sealed with wood or other suitable material for the full height of
Apr 21, 2005 · Penalty $2,000
Resolve - Hazardous
Excessive dust.building is under demolition at time of inspection and no water hose provided to wet down dust.stop all work remedy:provide water hose.
Apr 21, 2005 · Penalty $2,000
Resolve - Hazardous
Failure to maintain exterior bldg wall. in that bricks fell from parapet brick wall east onto sidewalk below-note police barricade in place. remedy: maintain bldg-obtain permit if feasible-protect pedest
Jun 7, 1999
Resolve
Complaints
- Water leak
Heavy flow
Aug 28, 2026 · Apt 1004
Close - Water leak
Slow leak
Aug 28, 2026 · Apt 1004
Close - Unsanitary condition
Mold
Aug 28, 2026 · Apt 1004
Close - Water leak
Damp spot
Aug 28, 2026 · Apt 1004
Close - Door/window
Window frame
Aug 28, 2026 · Apt 1004
Close - Unsanitary condition
Mold
Aug 11, 2026 · Apt 505
Close - Water leak
Damp spot
Jul 31, 2026 · Apt 505
Close - Water leak
Slow leak
Jul 31, 2026 · Apt 505
Close - Heat/hot water
Apartment only
Mar 23, 2026 · Apt 1109
Close - Door/window
Window frame
Mar 4, 2026 · Apt 1109
Close
Show 40 more ↓
- Water leak
Damp spot
Feb 19, 2026 · Apt 301
Close - Flooring/stairs
Floor
Feb 19, 2026 · Apt 301
Close - Plumbing
Basin/sink
Feb 19, 2026 · Apt 301
Close - Heat/hot water
Entire building
Jan 22, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Jan 3, 2026 · Apt BASEME
Close - Unsanitary condition
Pests
Jan 2, 2026 · Apt 605
Close - Unsanitary condition
Pests
Jan 1, 2026 · Apt 605
Close - Heat/hot water
Entire building
Mar 2, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 16, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 11, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 17, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 7, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 2, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 26, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 4, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 1, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 14, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 28, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 25, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 23, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 27, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 24, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 13, 2022 · Apt 101100
Close - Heat/hot water
Apartment only
Nov 27, 2022 · Apt 1108
Close - Heat/hot water
Entire building
Nov 26, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 21, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 14, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 15, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 2, 2022 · Apt BLDG
Close - Door/window
Door
Feb 15, 2022 · Apt 25
Close - Plumbing
Toilet
Feb 15, 2022 · Apt 25
Close - Door/window
Window frame
Feb 15, 2022 · Apt 25
Close - Unsanitary condition
Pests
Feb 15, 2022 · Apt 25
Close - Water leak
Heavy flow
Feb 15, 2022 · Apt 25
Close - Safety
Window guard broken/missing
Oct 18, 2019 · Apt 1104
Close - Heat/hot water
Apartment only
Apr 15, 2018 · Apt 1108
Close - Unsanitary condition
Pests
Aug 4, 2016 · Apt 5
Close - Nonconst
Rubbish
Dec 20, 2013 · Apt 405
Close - Plumbing
Sewer
Dec 20, 2013 · Apt 405
Close - Nonconst
Rubbish
Dec 20, 2013 · Apt 405
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RM)
- Year built
- 2005
- Floors
- 11
- Residential units
- 135
- Building area
- 186,614 ft²
- Lot area
- 24,728 ft²
- Zoning
- R8
- Community board
- 110
- Council district
- 9
- Block / lot
- 2045 / 7502
- Assessed value
- $11,639,700
- Landmark / historic district
- No
HPD registration #142886, last renewed Aug 28, 2025.
Questions about 102 Bradhurst Avenue
Who owns 102 Bradhurst Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Unavailable Owner.
Does 102 Bradhurst Avenue have violations?
Yes. NYC HPD has recorded 24 housing violations at this property.
Is 102 Bradhurst Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 102 Bradhurst Avenue built?
City records list 2005 as the year it was built.
How many apartments are in 102 Bradhurst Avenue?
It has 135 residential units and 178 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.