203 West 146 Street
Manhattan, NY 10039BBL 1-02032-0023Map
Owner of record: West 146th St Sr Hsg Devlp Fd Corp
203 West 146 Street is an elevator apartment building built in 2010 in Manhattan, 10039. It has 65 residential units across 8 floors. The owner of record is West 146th St Sr Hsg Devlp Fd Corp. HPD has recorded 78 housing violations here, most recently on May 8, 2026. 24 of the 50 most recent violations are still open.
- HPD violations
- 78
- DOB violations
- 19
- ECB violations
- 5
- HPD complaints
- 268
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 78
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 8, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4g, 4th story, 4th apartment from east at south
Apr 22, 2026 · Apt 4G
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5c, 5th story, 3rd apartment from west at north
Feb 26, 2026 · Apt 5C
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from north at east located at apt 6g, 6th story, 4th apartment from east at south
Jan 23, 2026 · Apt 6G
Open — Not complied with - BHazardous
Properly repair the source and abate the evidence of a water leak above ceiling in the 2nd room from north at east located at apt 6g, 6th story, 4th apartment from east at south
Jan 23, 2026 · Apt 6G
Open — Not complied with - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 7d, 7th story, 2nd apartment from west at north
Nov 19, 2025 · Apt 7D
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 8g, 8th story, 1st apartment from east at south
Nov 15, 2025 · Apt 8G
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the kitchen located at apt 8g, 8th story, 1st apartment from east at south
Nov 15, 2025 · Apt 8G
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 8g, 8th story, 1st apartment from east at south
Nov 15, 2025 · Apt 8G
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 8g, 8th story, 1st apartment from east at south
Nov 15, 2025 · Apt 8G
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Provide ready access to buildings heating system door to boiler room locked at cellar
Oct 8, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4h, 4th story, 3rd apartment from east at south
Oct 8, 2025 · Apt 4H
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2g, 2nd story, 4th apartment from east at south
Oct 8, 2025 · Apt 2G
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 8g, 8th story, 2nd apartment from east at south
Oct 5, 2025 · Apt 8G
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4h, 4th story, 3rd apartment from west at north
Jun 23, 2025 · Apt 4H
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
Jun 21, 2025
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 8g, 8th story, 1st apartment from east at south
Jun 21, 2025 · Apt 8G
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5a, 5th story, 5th apartment from east at south
Jun 18, 2025 · Apt 5A
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement
Jun 18, 2025
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 8e, 8th story, 1st apartment from west at north
Jun 17, 2025 · Apt 8E
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3d, 3rd story, 2nd apartment from west at north
Jun 16, 2025 · Apt 3D
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3k, 3rd story, 1st apartment from east at south
Jun 16, 2025 · Apt 3K
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 13, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5j, 5th story, 2nd apartment from east at south
Jun 13, 2025 · Apt 5J
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at laundry room door at public hall, 1st story
Jun 13, 2025
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at cellar
Jun 13, 2025
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5h, 5th story, 3rd apartment from east at south
Jun 13, 2025 · Apt 5H
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at penthouse 7e, 7th story, 1st penthouse from east at south
Jun 10, 2025 · Apt 7E
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 7g, 7th story, 1st apartment from east at south
Apr 9, 2025 · Apt 7G
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 7g, 7th story, 1st apartment from east at south
Apr 9, 2025 · Apt 7G
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures ... in the entire apartment located at apt 8g, 8th story, 1st apartment from east at south
Mar 26, 2025 · Apt 8G
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures .. in the entire apartment located at apt 8f, 8th story, 2nd apartment from east at south
Mar 26, 2025 · Apt 8F
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and south wall at public hall, 1st story
Mar 19, 2025
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2c, 2nd story, 3rd apartment from west at north
Mar 19, 2025 · Apt 2C
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at boiler room
Mar 19, 2025
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3j, 3rd story, 2nd apartment from east at south
Mar 19, 2025 · Apt 3J
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at cellar
Mar 16, 2025
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 6b, 6th story, 4th apartment from west at north
Mar 16, 2025 · Apt 6B
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 7b, 7th story, 3rd apartment from north at east
Mar 14, 2025 · Apt 7B
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at cellar
Mar 14, 2025
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3e, 3rd story, 1st apartment from north at east
Mar 14, 2025 · Apt 3E
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling by mailbox area at public hall, 1st story
Mar 11, 2025
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling by the mailbox area at public hall, 1st story
Mar 11, 2025
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 7d, 7th story, 2nd apartment from north at east
Mar 11, 2025 · Apt 7D
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
Mar 11, 2025
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3e, 3rd story, 1st apartment from north at east
Mar 11, 2025 · Apt 3E
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at cellar
Dec 16, 2024
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 8a, 8th story, 5th apartment from west at north
Dec 16, 2024 · Apt 8A
Open — Invalid certification - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4f, 4th story, 5th apartment from east at south
Nov 20, 2024 · Apt 4F
Open — Invalid certification - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4f, 4th story, 5th apartment from east at south
Nov 20, 2024 · Apt 4F
Open — Notice of issuance sent to tenant
DOB building violations · 19
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 11, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 11, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 11, 2019
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 14, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 14, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 14, 2017
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed
Show 9 more ↓
- Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 31, 2013
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 3, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 11, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 10, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 10, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 7, 2011
Dob violation - resolved - Construction other optional
C-construction other optional
Sep 20, 2003
Dob violation - dismissed - Unsafe buildings none
Ub-unsafe buildings none
May 15, 1996
Dob violation - dismissed
ECB violations · 5
- Class - 2
Failure to submit an acceptable required cycle 8c and 9c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #918345. remedy: submit acceptab
Apr 8, 2025 · Penalty $10,000
Active - Class - 2
Failure to comply with commissioner order contained in summons/violat on#38267042h issued on 12-21-2018 and to fiel a certificate of correc ion pursuant to 28-201.1 and 1rcny 102-01(d)(2) an acceptibel certific
Oct 15, 2019 · Penalty $625
Resolve - Class - 2
81y11,68m07,68b07,70o02,02m07,40b07-81)replace packing on cylinder. 68)update maintenance log. 68)provide mcp. 70)clean oil in pit. 02)provide in car alarm. 40)provide machine room ventilation.
Dec 21, 2018 · Penalty $625
Resolve - Class - 2
Failure to file annual certification that cooling tower 100001789 has been inspected,tested,and disinfected and that a maintenance plan has been developed and implemented by november,1,2016.rem:file annual cert
Jun 20, 2017 · Penalty $10,000
Active - Class - 2
Work does not conform to approved construction document and/or approved amendments. noted: at the time of inspection approx 100 linear ft ofshed in place in front and rear of site w/45% attached to parapet w/o
Oct 20, 2009
Resolve
Complaints
- Heat/hot water
Entire building
Aug 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 25, 2026 · Apt BLDG
Close - Plumbing
Water supply
Jun 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 22, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 14, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 4, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 2, 2026 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Apr 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 31, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 31, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 26, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 25, 2026 · Apt 5C
Close - Heat/hot water
Apartment only
Feb 25, 2026 · Apt 7D
Close - Heat/hot water
Entire building
Feb 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt 4G
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt 7D
Close - Heat/hot water
Entire building
Feb 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 21, 2026 · Apt BLDG
Close - Plumbing
Water supply
Jan 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 21, 2026 · Apt BLDG
Close - Plumbing
Water supply
Jan 21, 2026 · Apt 2G
Close - Heat/hot water
Entire building
Jan 20, 2026 · Apt 6D
Close - Heat/hot water
Entire building
Jan 12, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 17, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 9, 2025 · Apt 3J
Close - Heat/hot water
Apartment only
Dec 6, 2025 · Apt 4G
Close - Heat/hot water
Entire building
Dec 3, 2025 · Apt 7D
Close - Heat/hot water
Entire building
Dec 3, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 3, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 3, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 18, 2025 · Apt 7D
Close - Heat/hot water
Entire building
Nov 13, 2025 · Apt 8E
Close - Heat/hot water
Apartment only
Nov 13, 2025 · Apt 7D
Close - Heat/hot water
Entire building
Nov 12, 2025 · Apt 8G
Close - Plumbing
Water supply
Oct 6, 2025 · Apt 4H
Close - Heat/hot water
Entire building
Oct 4, 2025 · Apt 8G
Close - Heat/hot water
Entire building
Oct 1, 2025 · Apt 5D
Close - Heat/hot water
Entire building
Sep 16, 2025 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D9)
- Year built
- 2010
- Floors
- 8
- Residential units
- 65
- Building area
- 61,549 ft²
- Lot area
- 12,490 ft²
- Zoning
- R7-2
- Community board
- 110
- Council district
- 9
- Block / lot
- 2032 / 23
- Assessed value
- $1,422,000
- Landmark / historic district
- No
HPD registration #144077, last renewed Oct 17, 2025.
Questions about 203 West 146 Street
Who owns 203 West 146 Street?
The owner of record in NYC Department of City Planning PLUTO data is West 146th St Sr Hsg Devlp Fd Corp.
Does 203 West 146 Street have violations?
Yes. NYC HPD has recorded 78 housing violations at this property.
Is 203 West 146 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 203 West 146 Street built?
City records list 2010 as the year it was built.
How many apartments are in 203 West 146 Street?
It has 65 residential units and 66 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.