125 West 144 Street
Manhattan, NY 10030BBL 1-02013-0018Map
Owner of record: NYC Housing Authority
125 West 144 Street is a walk-up apartment building built in 1920 in Manhattan, 10030. It has 20 residential units across 5 floors. The owner of record is NYC Housing Authority. HPD has recorded 44 housing violations here, most recently on May 30, 2026. 27 of the 44 most recent violations are still open.
- HPD violations
- 44
- DOB violations
- 10
- ECB violations
- 8
- HPD complaints
- 49
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 44
- BHazardous
Properly repair or replace the broken or defective light fixture at ceiling at public hall, 2nd story
May 30, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling at intermediate landing at public hall, 2nd story
May 30, 2026
Open — Nov sent out - BHazardous
Replace with new the missing door knob at vestibule door at public hall, 1st story
May 30, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch set at vestibule door at public hall, 1st story
May 30, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at north, east and west walls at public hall, 1st story
May 1, 2026
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department north, west and east walls at public hall, 1st story
May 1, 2026
Open — Not complied with - BHazardous
Replace with new the missing ceramic floor tiles at public hall, 1st story
May 1, 2026
Closed — Violation closed - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at rats at building front areaway
May 1, 2026
Open — Defect letter issued - CImmediately hazardous
Properly repair or replace the broken or defective hydronic baseboard heater missing cover at public hall, 1st story
May 1, 2026
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Closed — Violation dismissed
Show 34 more ↓
- CImmediately hazardous
Provide ready access to buildings heating system door locked to basement at boiler room
Jan 28, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east
Jan 28, 2026 · Apt 1B
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from east located at apt 1b, 1st story, 1st apartment from north at east
Jan 14, 2026 · Apt 1B
Open — First no access to re- inspect violation - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... more than 30 square feet at all walls and ceiling in the bathroom located at apt 1b, 1st story, 1st apartment from north at east
Jan 14, 2026 · Apt 1B
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroom located at apt 1b, 1st story, 1st apartment from north at east
Jan 14, 2026 · Apt 1B
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at celing in the private hallway located at apt 1b, 1st story, 1st apartment from north at east
Jan 14, 2026 · Apt 1B
Open — First no access to re- inspect violation - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 1b, 1st story, 1st apartment from north at east
Jan 14, 2026 · Apt 1B
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 7th room from east located at apt 1b, 1st story, 1st apartment from north at east
Jan 14, 2026 · Apt 1B
Open — First no access to re- inspect violation - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 7th room from east located at apt 1b, 1st story, 1st apartment from north at east
Jan 14, 2026 · Apt 1B
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective porcelain enamel by method of reglazing at bathtub in the bathroom located at apt 1b, 1st story, 1st apartment from north at east
Jan 14, 2026 · Apt 1B
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east located at apt 1b, 1st story, 1st apartment from north at east
Jan 14, 2026 · Apt 1B
Open — First no access to re- inspect violation - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east
Jan 14, 2026 · Apt 1B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceing and north wall in the kitchen located at apt 2b, 2nd story, 1st apartment from north at east
Aug 26, 2025 · Apt 2B
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 2b, 2nd story, 1st apartment from north at east
Aug 26, 2025 · Apt 2B
Open — First no access to re- inspect violation - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling north wall and east wall in the 2nd bathroom from north located at apt 2b, 2nd story, 1st apartment from north at east
Aug 26, 2025 · Apt 2B
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling north wall and west wall in the 2nd bathroom from north located at apt 2b, 2nd story, 1st apartment from north at east
Aug 26, 2025 · Apt 2B
Open — First no access to re- inspect violation - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at all walls in the 1st room from north located at apt 2b, 2nd story, 1st apartment from north at east
Aug 26, 2025 · Apt 2B
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective wood parquet ffoor tiles in the 1st room from north located at apt 2b, 2nd story, 1st apartment from north at east
Aug 26, 2025 · Apt 2B
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st bathroom from north located at apt 2b, 2nd story, 1st apartment from north at east
Aug 26, 2025 · Apt 2B
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 1st bathroom from north located at apt 2b, 2nd story, 1st apartment from north at east
Aug 26, 2025 · Apt 2B
Open — First no access to re- inspect violation - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the 1st bathroom from north located at apt 2b, 2nd story, 1st apartment from north at east original violation 18188351 issued 26-aug-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Aug 26, 2025 · Apt 2B
Open — Second no access to re-inspect violation - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2b, 2nd story, 1st apartment from north at east
Aug 26, 2025 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2b, 2nd story, 1st apartment from north at east
Aug 26, 2025 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance door at public hall, 1st story
Aug 26, 2025
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch and assembly at building entrance door at public hall, 1st story
Aug 26, 2025
Open — Not complied with - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the 1st bathroom from north located at apt 2b, 2nd story, 1st apartment from north at east
Aug 26, 2025 · Apt 2B
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 4, 2025
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3c, 3rd story, 1st apartment from east at south
Dec 28, 2024 · Apt 3C
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3c, 3rd story, 1st apartment from east at south
Dec 28, 2024 · Apt 3C
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of rodents rats at public hall stairs, 1st story
Dec 28, 2024
Open — Defect letter issued - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at building front entrance door at public hall, 1st story
Dec 28, 2024
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water temperature exceeding 130 fahrenheits at all hot water fixtures in the entire apartment located at apt 3c, 3rd story, 1st apartment from east at south
Dec 28, 2024 · Apt 3C
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule door at public hall, 1st story
Dec 28, 2024
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east located at apt 5c, 5th story, 1st apartment from east at south
Feb 1, 2010 · Apt 5C
Closed — Violation closed
DOB building violations · 10
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 8
- Class - 2
Mis vio-3314.4.1.no records/dob notifications were found on file for the removal of suspended scaffold.walked the whole entire perimeter of the building on the roof &lower level &observed that the scaffold had
Apr 4, 2026 · Penalty $2,000
Resolve - Class - 1
Atoi on an active job site, i observed large amounts of debris. first floor scattered throughout. roof also, rear yard exposure 3. materials, debris,tools laying on the floor.blocking egress. to &from stairs, c
Apr 4, 2026 · Penalty $6,250
Resolve - Class - 1
Mis vio. bc 3301.5 at time of inspection, observed large amount of debris and materials stored between two buildings in an unsafe and unsecured manner. condition presents hazard to public and adjoining property
Apr 4, 2026 · Penalty $5,000
Resolve - Class - 1
Mis vio. bc 3307.4.7 atoi yodocks barriers &fence installed along roadway not continuous@ all locations.gaps&inconsistent alignment,failing to provide proper protection between work zone&public access areas.mat
Apr 4, 2026 · Penalty $5,000
Resolve - Class - 2
Mis vio3309.11 atoi on an active jobsite of a 5-story building, observed facade operations in progress. obs that tree@125 w 144 street of property jobsite under construction was exposed tree pit area with uneve
Apr 4, 2026 · Penalty $5,000
Resolve - Class - 2
Found weil mclain( model# 796) gas fired boiler in basement missing spill switch, inadequate fresh air louver not fully open, door does not open to egress
Apr 7, 2022 · Penalty $625
Resolve - Class - 2
Unable to access boiler room, bsmt flooded due to sewer back up in bsmt, clear back up and clean bsmt of all raw sewage.
May 15, 2019
Resolve - Non-hazardous
36 boiler #2 (burkay boiler not registered) 49 boiler installed without permits infraction code (bq9) code section (27-147).
Jul 28, 2000
Active
Complaints
- Unsanitary condition
Pests
Feb 11, 2026 · Apt 1D
Close - Heat/hot water
Apartment only
Jan 26, 2026 · Apt 1B
Close - Water leak
Heavy flow
Jan 8, 2026 · Apt 1B
Close - Water leak
Heavy flow
Jan 7, 2026 · Apt 1B
Close - Plumbing
Basin/sink
Jan 7, 2026 · Apt 1B
Close - Unsanitary condition
Mold
Jan 7, 2026 · Apt 1B
Close - Unsanitary condition
Pests
Jan 7, 2026 · Apt 1B
Close - Water leak
Heavy flow
Jan 6, 2026 · Apt 1B
Close - Paint/plaster
Ceiling
Jan 6, 2026 · Apt 1B
Close - Unsanitary condition
Pests
Jan 6, 2026 · Apt 1B
Close
Show 39 more ↓
- Unsanitary condition
Mold
Jan 6, 2026 · Apt 1B
Close - Paint/plaster
Ceiling
Jun 5, 2025 · Apt 2B
Close - Paint/plaster
Wall
Jun 5, 2025 · Apt 2B
Close - Flooring/stairs
Floor
Jun 5, 2025 · Apt 2B
Close - Unsanitary condition
Pests
Jun 5, 2025 · Apt 2B
Close - Water leak
Slow leak
Jun 5, 2025 · Apt 2B
Close - Heat/hot water
Entire building
Dec 24, 2024 · Apt 1B
Close - Heating
Heat related
Jan 22, 2013 · Apt 1A
Close - Plumbing
Water-leaks
Oct 10, 2012 · Apt 5A
Close - Plumbing
Water supply
Oct 10, 2012 · Apt 5A
Close - Paint/plaster
Wall
Oct 10, 2012 · Apt 5A
Close - Nonconst
Carbon monoxide
Feb 22, 2011 · Apt 3A
Close - Heating
Heat related
Dec 30, 2010 · Apt 5C
Close - Paint/plaster
Wall
Dec 30, 2010 · Apt 5C
Close - Heating
Heat related
Jan 9, 2010 · Apt 5C
Close - Heating
Heat related
Apr 26, 2008 · Apt 3C
Close - Heating
Heat related
Dec 27, 2007 · Apt 3D
Close - Heating
Heat related
Dec 27, 2007 · Apt 3C
Close - Heating
Heat related
Dec 27, 2007 · Apt 5A
Close - Heating
Heat related
Dec 25, 2007 · Apt 2B
Close - Heating
Heat related
Dec 14, 2007 · Apt 2B
Close - Heating
Heat related
Oct 31, 2006 · Apt 3D
Close - Heating
Heat related
Oct 23, 2006 · Apt 3D
Close - Heating
Heat related
Feb 17, 2006 · Apt 3D
Close - Paint/plaster
Wall
Sep 30, 2005 · Apt 4A
Close - Heating
Heat related
Mar 2, 2004 · Apt BLDG
Close - Heating
Heat related
Jan 31, 2004 · Apt 3D
Close - Heating
Heat related
Jan 31, 2004 · Apt 2
Close - Heating
Heat related
Jan 25, 2004 · Apt BLDG
Close - Heating
Heat related
Jan 16, 2004 · Apt 3D
Close - Heating
Heat related
Jan 12, 2004 · Apt 3D
Close - Heating
Heat related
Jan 11, 2004 · Apt 4C
Close - Heating
Heat related
Jan 10, 2004 · Apt 3D
Close - Heating
Heat related
Jan 9, 2004 · Apt 3D
Close - Heating
Heat related
Jan 8, 2004 · Apt 3D
Close - Heating
Heat related
Jan 1, 2004 · Apt 5A
Close - Nonconst
Vermin
Dec 17, 2003 · Apt 4A
Close - Plumbing
Water-leaks
Mar 17, 2003 · Apt 4A
Close - General
Floor
Mar 17, 2003 · Apt 4A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1920
- Floors
- 5
- Residential units
- 20
- Building area
- 18,230 ft²
- Lot area
- 5,297 ft²
- Zoning
- R7-2
- Community board
- 110
- Council district
- 9
- Block / lot
- 2013 / 18
- Assessed value
- $666,450
- Landmark / historic district
- No
HPD registration #145217, last renewed Dec 8, 2025.
Questions about 125 West 144 Street
Who owns 125 West 144 Street?
The owner of record in NYC Department of City Planning PLUTO data is NYC Housing Authority.
Does 125 West 144 Street have violations?
Yes. NYC HPD has recorded 44 housing violations at this property.
Is 125 West 144 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 125 West 144 Street built?
City records list 1920 as the year it was built.
How many apartments are in 125 West 144 Street?
It has 20 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.