roofy

41 Convent Avenue

Manhattan, NY 10027BBL 1-01969-0025Map

Owner of record: St Agnes HDFC

41 Convent Avenue is an elevator apartment building built in 1926 in Manhattan, 10027. It has 79 residential units across 7 floors. The owner of record is St Agnes HDFC. HPD has recorded 319 housing violations here, most recently on September 4, 2026. 48 of the 50 most recent violations are still open.

HPD violations
319
DOB violations
31
ECB violations
24
HPD complaints
134

What to know

Concern
10 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 4, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 319

  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 1st private hallway from east located at apt 6a, 7th story, 1st apartment from north at east

    Sep 4, 2026 · Apt 6A

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the kitchen located at apt 6a, 7th story, 1st apartment from north at east

    Sep 4, 2026 · Apt 6A

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall, 1st window frame from north at east wall in the 3rd room from north located at apt 6a, 7th story, 1st apartment from north at east

    Sep 4, 2026 · Apt 6A

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from north, the 2nd private hallway from east, the 1st bathroom from north, the 2nd bathroom from north, the 7th room from north, the 6th room from north located at apt 6a, 7th story, 1st apartment from north at east

    Sep 4, 2026 · Apt 6A

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at west wall, north wall, east wall, 1st window frame from west at north wall, 2nd window frame from west at north wall, 1st window frame from north at east wall in the 1st room from north located at apt 6a, 7th story, 1st apartment from north at east

    Sep 4, 2026 · Apt 6A

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 6th room from north located at apt 6a, 7th story, 1st apartment from north at east

    Sep 4, 2026 · Apt 6A

    Open — Nov sent out
  • A

    Cleanse to the satisfaction of this department the mold on grout and ceramic tiles at the east wall and the north wall in the 2nd bathroom from north located at apt 6a, 7th story, 1st apartment from north at east

    Sep 4, 2026 · Apt 6A

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective pane at upper sash of window in the 2nd bathroom from north located at apt 6a, 7th story, 1st apartment from north at east

    Sep 4, 2026 · Apt 6A

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective marble saddle at entrance in the 2nd bathroom from north located at apt 6a, 7th story, 1st apartment from north at east

    Sep 4, 2026 · Apt 6A

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 3rd room from north located at apt 6a, 7th story, 1st apartment from north at east

    Sep 4, 2026 · Apt 6A

    Open — Nov sent out
Show 40 more ↓
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 6a, 7th story, 1st apartment from north at east

    Sep 4, 2026 · Apt 6A

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 2nd private hallway from east located at apt 6a, 7th story, 1st apartment from north at east

    Sep 4, 2026 · Apt 6A

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 6a, 7th story, 1st apartment from north at east

    Sep 4, 2026 · Apt 6A

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 6a, 7th story, 1st apartment from north at east

    Sep 4, 2026 · Apt 6A

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 6a, 7th story, 1st apartment from north at east

    Sep 4, 2026 · Apt 6A

    Open — Notice of issuance sent to tenant
  • B

    Repair the roof so that it will not leak over the ceiling in the 2nd private hallway from east located at apt 6a, 7th story, 1st apartment from north at east

    Sep 4, 2026 · Apt 6A

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st window frame from north at east wall in the kitchen located at apt 6a, 7th story, 1st apartment from north at east

    Sep 4, 2026 · Apt 6A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, east wall in the kitchen located at apt 6a, 7th story, 1st apartment from north at east

    Sep 4, 2026 · Apt 6A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from north located at apt 6a, 7th story, 1st apartment from north at east

    Sep 4, 2026 · Apt 6A

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak over the ceiling in the 3rd room from north located at apt 6a, 7th story, 1st apartment from north at east

    Sep 4, 2026 · Apt 6A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, south wall, west wall in the 3rd room from north located at apt 6a, 7th story, 1st apartment from north at east

    Sep 4, 2026 · Apt 6A

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from east at south wall in the 3rd room from north located at apt 6a, 7th story, 1st apartment from north at east

    Sep 4, 2026 · Apt 6A

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak over the ceiling in the 2nd room from north located at apt 6a, 7th story, 1st apartment from north at east

    Sep 4, 2026 · Apt 6A

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the west wall in the 1st room from north located at apt 6a, 7th story, 1st apartment from north at east

    Sep 4, 2026 · Apt 6A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north located at apt 6a, 7th story, 1st apartment from north at east

    Sep 4, 2026 · Apt 6A

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak over the ceiling in the 1st room from north located at apt 6a, 7th story, 1st apartment from north at east

    Sep 4, 2026 · Apt 6A

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door from east at south wall in the 1st room from north located at apt 6a, 7th story, 1st apartment from north at east

    Sep 4, 2026 · Apt 6A

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective spring balances at lower sash of window in the 2nd bathroom from north located at apt 6a, 7th story, 1st apartment from north at east

    Sep 4, 2026 · Apt 6A

    Open — Nov sent out
  • A

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet .... in the 1st bathroom from north located at apt 6a, 7th story, 1st apartment from north at east

    Sep 4, 2026 · Apt 6A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, ceiling, east wall in the 1st private hallway from east located at apt 6a, 7th story, 1st apartment from north at east

    Sep 4, 2026 · Apt 6A

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak over the ceiling in the 1st private hallway from east located at apt 6a, 7th story, 1st apartment from north at east

    Sep 4, 2026 · Apt 6A

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak over the ceiling in the 2nd bathroom from north located at apt 6a, 7th story, 1st apartment from north at east

    Sep 4, 2026 · Apt 6A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the kitchen located at apt 6a, 7th story, 1st apartment from north at east

    Sep 4, 2026 · Apt 6A

    Open — Nov sent out
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet .... in the 1st bathroom from east located at apt 1d, 2nd story, 2nd apartment from south at west

    Jun 3, 2026 · Apt 1D

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 1d, 2nd story, 2nd apartment from south at west

    Jun 3, 2026 · Apt 1D

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1d, 2nd story, 2nd apartment from south at west

    Jun 3, 2026 · Apt 1D

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective counter balance at lower sash at window in the 4th room from east located at apt 1d, 2nd story, 2nd apartment from south at west

    Jun 3, 2026 · Apt 1D

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 2nd bathroom from east located at apt 1d, 2nd story, 2nd apartment from south at west

    Jun 3, 2026 · Apt 1D

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1d, 2nd story, 2nd apartment from south at west

    Jun 3, 2026 · Apt 1D

    Open — Notice of issuance sent to tenant
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 29, 2026

    Open — Nov sent out
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 6a, 6th story, 1st apartment from north at east

    Mar 5, 2026 · Apt 6A

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 6a, 6th story, 1st apartment from north at east

    Mar 5, 2026 · Apt 6A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and west wall in the 1st room from north located at apt 6b, 6th story, 5th apartment from west at north

    Feb 25, 2026 · Apt 6B

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective electrical light fixture at ceiling in the 1st room from north located at apt 6b, 6th story, 5th apartment from west at north

    Feb 25, 2026 · Apt 6B

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 6b, 6th story, 5th apartment from west at north

    Feb 25, 2026 · Apt 6B

    Open — Nov sent out
  • C

    Repair the roof so that it will not leak at ceiling and west wall in the 1st room from north located at apt 6b, 6th story, 5th apartment from west at north

    Feb 25, 2026 · Apt 6B

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 17, 2025

    Open — Info nov sent out
  • B

    Properly repair with similar material the broken or defective fire retardant material at west wall and east. at public hall, 6th story, section ''center''

    Sep 8, 2025

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective fire retardant material at north wall at bulkhead by 'c' stair , section ''center''

    Sep 8, 2025

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak above the ceiling. in the 2nd room from east located at apt 6j, 6th story, 2nd apartment from south at west

    Sep 8, 2025 · Apt 6J

    Open — Nov sent out

DOB building violations · 31

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 4, 2023

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 4, 2023

    Dob violation - active
  • Hazardous condition (facade) facade required

    Cycle 9a unsafe report filed

    May 23, 2023

    Dob violation - active
  • Construction other optional

    Emergency work order due to unsafe fire escape notification -906775 dated 04/06/2023 note:at the time of inspection observed,missing bolt along ladder,rusted/deteriorated fire escape details with qewi filing -906775 date04/06/23 remedy:immediate make area safe,corrct all unsafe conditions submit photo to [email protected]

    Apr 25, 2023

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 11, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 18, 2018

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 6, 2016

    Dob violation - active
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Dec 9, 2015

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 5, 2015

    Dob violation - resolved
Show 21 more ↓
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2015

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 1, 2014

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 28, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 20, 2012

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2012

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 26, 2011

    Dob violation - resolved
  • Facade facade optional

    Ll11/98-local law 11/98 - facade facade optional

    Nov 20, 2008

    Dob violation - dismissed
  • Facade facade optional

    Ll1198-local law 11/98 - facade facade optional

    Nov 30, 2007

    Dob violation - active
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Apr 2, 2007

    Dob violation - active
  • Facade facade required

    L1198-local law 11/98 - facade facade required

    Aug 8, 2002

    Dob violation - dismissed
  • Elevator elevatorrequired

    1p9926

    Oct 29, 2001

    Dob violation - resolved
  • Elevator elevatorrequired

    1p9926

    May 25, 2000

    Dob violation - resolved
  • Elevator elevatorrequired

    1p9926

    Aug 18, 1999

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1993

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 25, 1992

    Vp*-violation unserved ecb- dismissed
  • Facade facade optional

    Ll1080-local law 10/80 - facade facade optional

    Jul 1, 1992

    Dob violation - dismissed
  • Elevator elevatoroptional

    1

    Apr 7, 1992

    Dob violation - dismissed
  • Elevator elevatorrequired

    (31)all covers (17)broken glass (60)cwt buffers (74)repair all broken shaft window and renew bsmt shaft window \ secure the bsmt window shaft

    Oct 5, 1990

    Dob violation - resolved
  • Elevator elevatorrequired

    51-provide push plates on all floors 52-repair broken glass over 1st floor hosit door 53-test car saftey service in presance of a inspection 54-clean installation 55-file with bldg dept for new controller

    Jan 21, 1989

    Dob violation - resolved

ECB violations · 24

  • Class - 2

    Failure to file acceptable amended cycle 9a report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #906775. remedy: file acceptable report.

    Jan 16, 2024 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to take and provide safety measures such as sidewalk shed, fence, netting, etc. to secure public safety. as per unsafe notification -906775-9a-001 dated 04/06/2023. note: at the time of inspection obser

    Jun 30, 2023 · Penalty $25,000

    Active
  • Class - 1

    Failure to take and provide safety measures such as sidewalk shed,fence,netting,etc.to secure public safety as per unsafe facade notification#906775 dated 4/6/2023.note at the time of inspection,observed no saf

    Apr 25, 2023 · Penalty $10,000

    Active
  • Class - 2

    Failure to submit an acceptable required cycle 9a report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#906775.rem:submit acceptable required t

    Dec 9, 2022 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to maintain note @time of inspection i observed sidewalk shed in place with potted mudsills.rem: comply with code-maintain

    Dec 19, 2019 · Penalty $10,000

    Active
  • Class - 2

    Expired permit note at tie of inspection i observed sidewlak shed in place without valid permit comply wit code renew pemrit

    Dec 19, 2019 · Penalty $1,280

    Active
  • Class - 2

    Failure to maintain exterior building facade, and appurtenances.*roof level,observed cracked coping stone and spalled masonry below coping stone on another location (both conditions) located on west elevation

    Jan 17, 2019 · Penalty $250

    Resolve
  • Class - 2

    Failure to file acceptable amended report indicating correction of unsafe conditions described in initial local law 11/98 report. remedy: file acceptable amended report.

    Nov 7, 2016 · Penalty $2,000

    Resolve
  • Class - 2

    Failed to provide sidewalk shed parapet sign acc to 3301.9. noted: at time of inspection sidewalk shed missing parapet sign acc to 3301.9 rmdy: provide sidewalk shed parapet sign acc to 3301.9.

    May 18, 2016

    Resolve
  • Class - 1

    Failure to take & provide safety measures/sidewalk shed,netting,etc where require to protect & secure public safety from.documented unsafe facade as per 1rcny 102-04.noted facade technical report file unsafe by

    Jan 6, 2016 · Penalty $2,430

    Active
Show 14 more ↓
  • Class - 2

    Failed to notify dept/obtain permit prior to use/inst off outrigger beams in connection w/suspended scaffold. outrigger beams with plateau at exp#4.rmdy: notify the dept.partial stop work order on suspend scaf

    Dec 28, 2012 · Penalty $400

    Resolve
  • Class - 2

    Failure to maintain bldg walls & appurtenances.cracks were observed @ decorative stone in front of 2/f sill near main entrance @ exp#1.step cracks were found @ spandrel between 1 & 2 flrs @ exp#3(south section

    May 2, 2012 · Penalty $500

    Resolve
  • Class - 2

    Failure to provide approved/accepted plans. at job site at time of inspection. noted: sidewalk shed erected under pmt#110394653 and height approx 10'-14' throughout. plans were not available for review at time

    Aug 5, 2009 · Penalty $250

    Resolve
  • Non-hazardous

    Failure to provide 10"x 12" elevator landing signs on all floors.failure to provide 3" stair i.d signs on all floors.remedy:provide signage as per local law 16/84.

    May 11, 2005 · Penalty $400

    Active
  • Hazardous

    Exit passageway or corridor total obstruction obstruction noted approx 12 plastic with demolished gymsum plastor stored directly into stair leading from roof stored directly into stair leading from to the six

    Dec 19, 2003 · Penalty $480

    Resolve
  • Non-hazardous

    83##. 83-work w/out a permit.file for and obtain permit.

    Dec 3, 2003 · Penalty $250

    Resolve
  • Non-hazardous

    Failure to submit a fifth round technical report : periodic inspectionof exterior walls and appurtenances as required by local law 11 of 1998 and the department of buildings rules and regulations. remedy : file

    Mar 28, 2003 · Penalty $700

    Resolve
  • Non-hazardous

    74m7,50b2,48o2,49o2,42o2,33o2,73o2,22o2,3m7,74d6,9h12,9m7,48b15,49b15,40u5. *74m m/r fire extinguisher. *50b clean commutator bars and mica.*22o car top. *73o outside enclosure. *3m capacity plate. *74d facia

    Aug 9, 2000

    Resolve
  • Non-hazardous

    3m,5j,22l,22o,23u,49u,49b,35p,33p. car top.

    Dec 14, 1999 · Penalty $180

    Resolve
  • Non-hazardous

    8v1,22o2,30o2,48b15,50y11,37u16,50u16,54u16,74u5,11i11,11b7. 22-car top. 5,37,50,54-city id.

    Sep 25, 1998

    Resolve
  • Hazardous

    03m-proper ventilaltion. 28m-pit sheild guard. 49l-landed. sheild guard. 52h-cease use until item 49l is complied with before returning to service, call 312-8730 for reinspection.

    Apr 18, 1995

    Resolve
  • Non-hazardous

    17i12, 22d6, 14m12, 73o2, 30i11, 30t7, 73u16, 35y2, 50y14, 58d6, 37q3, 46t13, 49t13, 48i10, 33m7, 33o2, 33x11, 3m2

    Mar 23, 1994

    Resolve
  • Non-hazardous

    74a,03i,74 provide permitt for new work on main machine and overhead.

    Apr 2, 1992

    Resolve
  • Non-hazardous

    17i;21x;22d;14m;31m;73o;60m;30i;30t; 17.glass 60 cwt. 30.window.

    Jun 18, 1991

    Resolve

Complaints

  • Water leak

    Slow leak

    Oct 15, 2026 · Apt 3A

    Open
  • Unsanitary condition

    Mold

    Oct 15, 2026 · Apt 3A

    Open
  • Water leak

    Slow leak

    Aug 21, 2026 · Apt 6A

    Close
  • Paint/plaster

    Ceiling

    Aug 21, 2026 · Apt 6A

    Close
  • Plumbing

    Toilet

    May 29, 2026 · Apt 1D

    Close
  • Safety

    Smoke detector

    May 29, 2026 · Apt 1D

    Close
  • Door/window

    Window frame

    May 29, 2026 · Apt 1D

    Close
  • Unsanitary condition

    Pests

    May 29, 2026 · Apt 1D

    Close
  • Water leak

    Slow leak

    Mar 5, 2026 · Apt 6A

    Close
  • Heat/hot water

    Apartment only

    Mar 5, 2026 · Apt 6A

    Close
Show 40 more ↓
  • Water leak

    Heavy flow

    Feb 20, 2026 · Apt 6B

    Close
  • Paint/plaster

    Wall

    Feb 20, 2026 · Apt 6B

    Close
  • Electric

    Lighting

    Feb 20, 2026 · Apt 6B

    Close
  • Paint/plaster

    Ceiling

    Feb 20, 2026 · Apt 6B

    Close
  • Water leak

    Heavy flow

    Sep 2, 2025 · Apt 6J

    Close
  • Water leak

    Heavy flow

    Aug 20, 2025 · Apt 6J

    Close
  • Water leak

    Heavy flow

    Jul 17, 2025 · Apt 6J

    Close
  • Paint/plaster

    Ceiling

    Jul 17, 2025 · Apt 6J

    Close
  • Safety

    Fire escape

    Jul 17, 2025 · Apt 6J

    Close
  • Door/window

    Window frame

    Jul 17, 2025 · Apt 6J

    Close
  • Water leak

    Heavy flow

    Jul 13, 2025 · Apt 1D

    Close
  • Safety

    Smoke detector

    Jul 13, 2025 · Apt 1D

    Close
  • Unsanitary condition

    Pests

    Jul 13, 2025 · Apt 1D

    Close
  • Plumbing

    Toilet

    Jul 13, 2025 · Apt 1D

    Close
  • Door/window

    Door

    Jul 13, 2025 · Apt 1D

    Close
  • Door/window

    Door

    Jul 13, 2025 · Apt 1D

    Close
  • Flooring/stairs

    Floor

    Jul 13, 2025 · Apt 1D

    Close
  • Door/window

    Door

    Jul 13, 2025 · Apt 1D

    Close
  • General

    Bell/buzzer/intercom

    May 20, 2025 · Apt 1D

    Close
  • Door/window

    Window frame

    May 20, 2025 · Apt 1D

    Close
  • Unsanitary condition

    Pests

    May 20, 2025 · Apt 1D

    Close
  • Heat/hot water

    Entire building

    Jan 10, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 9, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Dec 23, 2024 · Apt 2A

    Close
  • Heat/hot water

    Apartment only

    Dec 23, 2024 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Oct 11, 2024 · Apt 3H

    Close
  • Safety

    Carbon monoxide detector

    Dec 30, 2022 · Apt 2L

    Close
  • General

    Ventilation system

    Dec 30, 2022 · Apt 2L

    Close
  • Door/window

    Window frame

    Jun 21, 2021 · Apt 3A

    Close
  • Paint/plaster

    Ceiling

    Jun 21, 2021 · Apt 3A

    Close
  • Unsanitary condition

    Mold

    Jun 21, 2021 · Apt 3A

    Close
  • Paint/plaster

    Ceiling

    Jun 21, 2021 · Apt 3A

    Close
  • Water leak

    Heavy flow

    Jun 21, 2021 · Apt 3A

    Close
  • Water leak

    Heavy flow

    Jun 21, 2021 · Apt 3A

    Close
  • Door/window

    Door

    Mar 9, 2019 · Apt 2H

    Close
  • Plumbing

    Radiator

    Jun 27, 2018 · Apt 5A

    Close
  • Flooring/stairs

    Floor

    Jun 27, 2018 · Apt 5A

    Close
  • Paint/plaster

    Wall

    Jun 27, 2018 · Apt 5A

    Close
  • Water leak

    Heavy flow

    Jun 27, 2018 · Apt 5A

    Close
  • General

    Cabinet

    Jun 27, 2018 · Apt 5A

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D4)
Year built
1926
Floors
7
Residential units
79
Building area
104,187 ft²
Lot area
22,100 ft²
Zoning
R7A
Community board
109
Council district
9
Block / lot
1969 / 25
Assessed value
$2,924,100
Landmark / historic district
No

HPD registration #113366, last renewed Nov 27, 2024.

Questions about 41 Convent Avenue

Who owns 41 Convent Avenue?

The owner of record in NYC Department of City Planning PLUTO data is St Agnes HDFC.

Does 41 Convent Avenue have violations?

Yes. NYC HPD has recorded 319 housing violations at this property.

Is 41 Convent Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 41 Convent Avenue built?

City records list 1926 as the year it was built.

How many apartments are in 41 Convent Avenue?

It has 79 residential units and 80 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.