2235 Fredrick Douglass Bl
Manhattan, NY 10027BBL 1-01947-7501Map
Owner of record: Kyrous Realty Group INC.
2235 Fredrick Douglass Bl is a condominium built in 2003 in Manhattan, 10027. It has 74 residential units across 8 floors. The owner of record is Kyrous Realty Group INC.. HPD has recorded 49 housing violations here, most recently on November 17, 2025. 35 of the 49 most recent violations are still open.
- HPD violations
- 49
- DOB violations
- 31
- ECB violations
- 13
- HPD complaints
- 94
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 49
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2025
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective parquet hardwood floor in the private hallway located at apt 2c, 2nd story, 1st apartment from north at east
Jun 15, 2024 · Apt 2C
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective parquet hardwood floor in the 2nd room from north located at apt 2c, 2nd story, 1st apartment from north at east
Jun 15, 2024 · Apt 2C
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective parquet wood floor in the 3rd room from north located at apt 2c, 2nd story, 1st apartment from north at east
Jun 15, 2024 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2c, 2nd story, 1st apartment from north at east
Jun 15, 2024 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2j, 2nd story, 1st apartment from south at west
Sep 12, 2023 · Apt 2J
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective rotted lower wall cabinet at west wall in the kitchen located at apt 2j, 2nd story, 1st apartment from south at west
Sep 12, 2023 · Apt 2J
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 30, 2023
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective spring balance of lower window sash at west wall in the 1st room from north at west located at apt 7k, 7th story, 2nd apartment from south at west
Mar 9, 2020 · Apt 7K
Open — Nov sent out - BHazardous
Properly repair the broken or defective spring balance of lower window sash at west wall in the 2nd room from north located at apt 7k, 7th story, 2nd apartment from south at west
Mar 9, 2020 · Apt 7K
Open — Nov sent out
Show 39 more ↓
- BHazardous
Properly repair the broken or defective spring balance of lower window sash at west wall in the 3rd room from north at west located at apt 7k, 7th story, 2nd apartment from south at west
Mar 9, 2020 · Apt 7K
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 1st room from north at east located at apt 7k, 7th story, 2nd apartment from west at north
May 21, 2019 · Apt 7K
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... at the wood floor in the 3rd room from north at west located at apt 7k, 7th story, 2nd apartment from south at west original violation 12979445 issued 25-mar-19 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Mar 25, 2019 · Apt 7K
Open — Defect letter issued - BHazardous
Trace and repair the source and abate the visible mold condition... at sink base cabinet in the kitchen located at apt 7k, 7th story, 2nd apartment from south at west original violation 12979450 issued 25-mar-19 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Mar 25, 2019 · Apt 7K
Open — Defect letter issued - BHazardous
Trace and repair the source and abate the visible mold condition... at wood floor in the 2nd room from north at west located at apt 7k, 7th story, 2nd apartment from south at west original violation 12979544 issued 25-mar-19 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Mar 25, 2019 · Apt 7K
Open — Defect letter issued - ANon-hazardous
Properly repair the broken or defective wood floor in the 2nd room from north at west located at apt 7k, 7th story, 2nd apartment from south at west
Mar 25, 2019 · Apt 7K
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at wood floor in the 2nd room from north at west located at apt 7k, 7th story, 2nd apartment from south at west
Mar 25, 2019 · Apt 7K
Closed — Violation closed - ANon-hazardous
Properly repair the broken or defective wood floor in the 3rd room from north at west located at apt 7k, 7th story, 2nd apartment from south at west
Mar 25, 2019 · Apt 7K
Open — Nov sent out - ANon-hazardous
Properly repair the broken or defective wood at kitchen sink base in the kitchen located at apt 7k, 7th story, 2nd apartment from south at west
Mar 25, 2019 · Apt 7K
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at sink base cabinet in the kitchen located at apt 7k, 7th story, 2nd apartment from south at west
Mar 25, 2019 · Apt 7K
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at the wood floor in the 3rd room from north at west located at apt 7k, 7th story, 2nd apartment from south at west
Mar 25, 2019 · Apt 7K
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east and west walls in the 3rd room from north at west located at apt 7k, 7th story, 2nd apartment from south at west
Jan 25, 2019 · Apt 7K
Open — Nov sent out - BHazardous
Arrange and make self-closing the doors ... in the entrance located at apt 7k, 7th story, 2nd apartment from south at west
Jan 25, 2019 · Apt 7K
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective base cabinet at wash basin in the 2nd bathroom from north located at apt 7k, 7th story, 2nd apartment from south at west
Jan 25, 2019 · Apt 7K
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the private hallway located at apt 7k, 7th story, 2nd apartment from south at west
Jan 25, 2019 · Apt 7K
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north at west located at apt 7k, 7th story, 2nd apartment from south at west
Jan 25, 2019 · Apt 7K
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall in the 2nd room from north at west located at apt 7k, 7th story, 2nd apartment from south at west
Jan 25, 2019 · Apt 7K
Open — Nov sent out - BHazardous
Properly repair the broken or defective electrical outlets in the kitchen located at apt 7k, 7th story, 4th apartment from south at west
Jan 25, 2019 · Apt 7K
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 1st room from north at west located at apt 7k, 7th story, 2nd apartment from south at west
Jan 25, 2019 · Apt 7K
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the walls in the 2nd bathroom from east located at apt 7k, 7th story, 2nd apartment from south at west
Dec 24, 2018 · Apt 7K
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and walls in the 1st bathroom from east located at apt 7k, 7th story, 2nd apartment from south at west
Dec 24, 2018 · Apt 7K
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the walls in the 3rd room from north at west located at apt 7k, 7th story, 2nd apartment from south at west
Dec 24, 2018 · Apt 7K
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the walls in the private hallway located at apt 7k, 7th story, 2nd apartment from south at west
Dec 24, 2018 · Apt 7K
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the walls in the 2nd room from north located at apt 7k, 7th story, 2nd apartment from south at west
Dec 24, 2018 · Apt 7K
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the walls in the 1st room from north at west located at apt 7k, 7th story, 2nd apartment from south at west
Dec 24, 2018 · Apt 7K
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north at west located at apt 7k, 7th story, 2nd apartment from south at west
Dec 24, 2018 · Apt 7K
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the walls in the foyer located at apt 7k, 7th story, 2nd apartment from south at west
Dec 24, 2018 · Apt 7K
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and walls in the kitchen located at apt 7k, 7th story, 2nd apartment from south at west
Dec 24, 2018 · Apt 7K
Open — Nov sent out - BHazardous
Properly repair the broken or defective base board heater cover in the 2nd room from north located at apt 7b, 7th story, 5th apartment from south at west
Aug 21, 2018 · Apt 7B
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
May 14, 2018
Open — Not complied with - ANon-hazardous
Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. at public hall, 1st story
Oct 11, 2015
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system .. at public hall, 1st story
Oct 11, 2015
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box .. at public hall, 1st story
Oct 11, 2015
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Oct 11, 2015
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective spring balance at lower window sash 2nd from north at east in the 1st room from north at east located at apt 4f, 4th story, 4th apartment from north at east
Sep 16, 2014 · Apt 4F
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 1; in the entire apartment located at apt 4f, 4th story, 4th apartment from north at east
Sep 16, 2014 · Apt 4F
Closed — Violation dismissed - ANon-hazardous
Refit all windows in the entire apartment located at apt 4f, 4th story, 4th apartment from north at east
Aug 20, 2014 · Apt 4F
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 1; in the entire apartment located at apt 4f, 4th story, 4th apartment from north at east
Aug 20, 2014 · Apt 4F
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening double cyclinder key operated lock at entrance door from street to vestible
Nov 2, 2009
Open — Not complied with
DOB building violations · 31
- Construction other optional
(2235 frederick douglas blvd). failure to maintain building exterior walls & appurtanences in a code compliant manner. at time of inspection, observed cracked defected mortar joints multi-locations @ exposures 1 and 4, east, north elevations. remedy: owner to repair and or replace
May 16, 2026
Dob violation - active - Construction other optional
(2490 frederic douglas blvd) ftm bldg exter walls& appurt. obsrvd stepcracks, dislodge masonry bricks, open mortar joints, defected mortar joints, damaged metal cornice @ exp 1w elev. obsrvd stepcracks bricks, cracking stone masonry decor multilocatns, damaged masonry bricks wall @ exp 4 s elev. remedy:owner to repair and or replace
May 16, 2026
Dob violation - active - Construction other optional
Failure to maintain building in code compliant manner.cracked/separate mortar joints on all expo. in multiple locations.also bulging/stone movement.at corner of exp#1&4(east&north elevation at parapet level remedy:fix and/or replace
Jan 11, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - dismissed - Construction other optional
Failure to maintain building in code compliant manner.note:observed cracks and damaged joints at exposure 3 west elevation damaged joint @ exposure 2&4.cracks damaged joint @exposure1 including bulging/stone movement at corner of exposure 1&4.top floor remedy maintain building repair and or replace
Sep 11, 2023
Dob violation - active - Construction other optional
Emergency work order due to bulging stone causing movement from wall at top floor corner of expsure 1 east elevation and exposure 4 north elevation immediately remove loose stone to prevent from collapsing remedy:make immed.repairs under superv. of nyc licensed professional
Sep 11, 2023
Dob violation - active - Construction other optional
Failure to maintain building in code compliant manner observed at exp# 1,2 and 4.loose/damaged / decorative stone cracked/missing mortar joints on exposure 1,2 and 4.remedy:repair and/or replace
May 23, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed
Show 21 more ↓
- Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Construction other optional
Emergency work order due to spalling/cracks cast stone at exp#1e.elev #2so.elev.west ele.remedy:provide safety measures to secure the public safety&install public protection& exp#1,2,&3 make immed repair at facade wall @exp#1e.elev.#2so.elv.#3west elev.north elev. under supervision of licensed professional
Mar 24, 2023
Dob violation - active - Hazardous condition (facade) facade required
Cycle 9b unsafe report filed
Feb 17, 2023
Dob violation - active - Failure to correct swarmp conditions (facade) facade required
Cycle 9b failure to correct swarmp conditions
Feb 17, 2023
Dob violation - active - Construction other optional
Failure to maintain exterior building wall facade and appurtenances multiple cracks and morta joints throughout facade.loose stones at nor north east corner (exposure#1)and damaged stones on exposure#2 and exposure#4 remedy:maintain building facade and appurtenances.provide adequate safety measure.repair/relace damaged facade
Feb 15, 2023
Dob violation - active - Construction other optional
Ftm bldh in a code compliant manner. multiple cracks and mortar joints throughout facade. loose stones at north east corner(exp1) and damaged stones at exp2 and exp4. remedy: comply with code
Jan 11, 2023
Dob violation - dismissed - Construction other optional
Failure to maintain exterior building wall facade and appurtenances multiple cracks and mortar joints throughout facade.loose stones at north east corner (exposure#1)and damaged stones on exposure#2and exposure#4.remedy:maintain building facade and appurtenances .provide adequate safety measures.repair/replace damage facade
Jan 11, 2023
Dob violation - active - Construction other optional
Emergency work order due to large verticle step crack, loose detached bricks and spararation of mortar joints. remedy: make immed repairs under supervision of licensed prof and immed extend public at exp1 and 4
Nov 5, 2022
Dob violation - active - Construction other optional
Ftm bldg exterior walls facade and appurtenances. observed multiple cracks and open mortar joints throughout facade. also loose stone at north east corner. remedy: maintain bldg exterior walls facade and appurtenances. provide safety measures, repair facade as per 1rcny 103.04
Oct 24, 2022
Dob violation - active - Construction other optional
Ftm bldg exterior walls facade and appurtenances. observed multiple defected conditions: loose stone at north east cornder and also cracks open joints. exp1 and corner south east and west upper corners remedy: maintain bldg exterior walls facade and appurtenances. prov safety measures repair facade as per 1 rcny 103.04
May 9, 2022
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2019
Jun 29, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 21, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 21, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 21, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 25, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 25, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 28, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 28, 2006
Dob violation - resolved - Construction other optional
C-construction other optional
Nov 15, 2004
Dob violation - active
ECB violations · 13
- Class - 2
Pedestrian protection does not meet code specifications. at time of inspections. at time of inspection at exposure 1(east elevation) damaged/deteriorated mudsills were observed. remedy: comply to code specifica
May 12, 2025
Resolve - Class - 1
Unlawful acts.failure to comply with commissioner's order on "09/11/23" violation #"091123sr1002ns" states emergency work order to immediately remove loose stone & make repairs.as of today"01/11/24" loose stone
Jan 11, 2024 · Penalty $2,530
Active - Class - 1
Failure to provide adequate safety measures such as shed netting etc.where required to protect public and property from documented unsafe facade as per 1rcny 103-04.as per unsafe notification#unsafe-913561-9b-0
Mar 24, 2023 · Penalty $10,000
Active - Class - 2
Observed at exp1 east elevation loose parapet wall panel at exp4.remedy:conform shed to code specifications.
Oct 24, 2022 · Penalty $10,000
Active - Class - 2
Failure to submit acceptable required cycle 8b report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control #813561.agg1:prior nov 37021383j under 28-30
Oct 19, 2022 · Penalty $10,000
Active - Class - 2
Bc3307.6&27-1021 observed@exp4 n elevation sws doesnt meet code spec.loose parapet shaking&damaged roof@bldg wall.conform shed to code spec ns
May 9, 2022 · Penalty $1,250
Active - Class - 2
Failure to submit an acceptable required cycle 8b report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control #813561.agg1:prior nov37013731r under 28
Jun 1, 2021 · Penalty $3,125
Active - Class - 2
Work without a permit: noted: upon inspection observed apartment 7k fully demoed. all partition walls and studs have been removed. electrical and plumbing have not been removed. apartment 7k was 100% fully demo
Feb 21, 2020
Resolve - Class - 2
Failure to maintain building in code compliant manner. at time of inspection, observed wall cracks around the living room window in apartment 7k. roughly 1" wide on the left side and roughly 2-3 inches wide on
Jul 5, 2019 · Penalty $3,125
Active - Class - 2
Failure to submit a required cycle 8b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control# 813561. remedy: submit required technical report
Oct 15, 2018 · Penalty $1,250
Active
Show 3 more ↓
- Non-hazardous
84x10.26u15.17j01.74b14.64x10.84x-car communications inoperative.26u-tag top of car w/ current 2 & 5 year tags.17j-gibs riding at insufficent depth 15,3 & 2nd floors.74b-shorten ropes.64x-pit light inoperative.
Jul 24, 2007
Resolve - Non-hazardous
84x10.38m07.26u15.64q03.08v01.74b14.17j01.84x-car communications inoperative.38m-car top light missing.26u-tag device w/ current 2 & 5 year tags.64q-install guard.08v-intermittent levelling problem.74b-shorten
Jul 24, 2007
Resolve - Non-hazardous
Work w/o permit. work noted:at ground fl north east side store demo of full height partitions & suspending ceiling.erecting new sheetrock walls appl # 104701093 pre-filed.stop all work. remedy:obtain permit or
Mar 24, 2007 · Penalty $500
Resolve
Complaints
- Water leak
Heavy flow
Feb 22, 2025 · Apt 2J
Close - Electric
Lighting
Feb 22, 2025 · Apt 2J
Close - Heat/hot water
Apartment only
Dec 2, 2024 · Apt 2C
Close - Unsanitary condition
Mold
Jun 11, 2024 · Apt 2C
Close - Flooring/stairs
Floor
Jun 7, 2024 · Apt 2C
Close - Unsanitary condition
Mold
Sep 5, 2023 · Apt 2J
Close - Unsanitary condition
Mold
Aug 29, 2023 · Apt 2J
Close - Plumbing
Basin/sink
Aug 15, 2023 · Apt 2J
Close - Water leak
Heavy flow
Aug 10, 2023 · Apt 2J
Close - Heat/hot water
Entire building
Oct 3, 2022 · Apt 7B
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Oct 2, 2022 · Apt 7B
Close - Heat/hot water
Entire building
Oct 18, 2021 · Apt 7B
Close - Heat/hot water
Entire building
May 30, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 4, 2020 · Apt 7B
Close - Door/window
Window frame
Feb 12, 2020 · Apt 7K
Close - Door/window
Door frame
Feb 12, 2020 · Apt 7K
Close - Door/window
Window frame
Feb 7, 2020 · Apt 7K
Close - Heat/hot water
Entire building
Oct 18, 2019 · Apt 7B
Close - Heat/hot water
Entire building
Oct 17, 2019 · Apt 7B
Close - Heat/hot water
Entire building
Oct 15, 2019 · Apt 7B
Close - Heat/hot water
Entire building
Oct 13, 2019 · Apt 7B
Close - Heat/hot water
Entire building
Oct 10, 2019 · Apt 7B
Close - Heat/hot water
Apartment only
Oct 5, 2019 · Apt 7B
Close - Paint/plaster
Wall
May 14, 2019 · Apt 7K
Close - Heat/hot water
Entire building
May 12, 2019 · Apt 7B
Close - Heat/hot water
Entire building
May 12, 2019 · Apt 7B
Close - Heat/hot water
Entire building
Apr 26, 2019 · Apt 7B
Close - Unsanitary condition
Mold
Mar 6, 2019 · Apt 7K
Close - Unsanitary condition
Mold
Mar 6, 2019 · Apt 7K
Close - Flooring/stairs
Floor
Jan 17, 2019 · Apt 7K
Close - Paint/plaster
Wall
Jan 17, 2019 · Apt 7K
Close - Electric
Power outage
Jan 17, 2019 · Apt 7K
Close - Water leak
Heavy flow
Jan 17, 2019 · Apt 7K
Close - Unsanitary condition
Mold
Jan 17, 2019 · Apt 7K
Close - Unsanitary condition
Mold
Dec 17, 2018 · Apt 7K
Close - Unsanitary condition
Mold
Nov 14, 2018 · Apt 7K
Close - Heat/hot water
Entire building
Oct 14, 2018 · Apt 7B
Close - Heat/hot water
Entire building
Oct 14, 2018 · Apt 7B
Close - Paint/plaster
Wall
Aug 24, 2018 · Apt 7B
Close - Paint/plaster
Wall
Aug 13, 2018 · Apt 7B
Close - Heat/hot water
Entire building
May 19, 2018 · Apt 7B
Close - Heat/hot water
Entire building
May 13, 2018 · Apt 7B
Close - Heat/hot water
Entire building
Oct 13, 2017 · Apt 7B
Close - Heat/hot water
Entire building
May 16, 2016 · Apt 5J
Close - Heat/hot water
Entire building
Oct 16, 2015 · Apt 7B
Close - Heat/hot water
Entire building
Oct 14, 2015 · Apt 7B
Close - Heat/hot water
Entire building
Oct 12, 2015 · Apt 7B
Close - Heat/hot water
Entire building
Oct 10, 2015 · Apt 7B
Close - Heat/hot water
Entire building
Oct 9, 2015 · Apt 7B
Close - Heat/hot water
Entire building
Oct 1, 2015 · Apt 7B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RM)
- Year built
- 2003
- Floors
- 8
- Residential units
- 74
- Building area
- 100,359 ft²
- Lot area
- 20,570 ft²
- Zoning
- R8A
- Community board
- 110
- Council district
- 9
- Block / lot
- 1947 / 7501
- Assessed value
- $6,457,500
- Landmark / historic district
- No
HPD registration #142132, last renewed Dec 1, 2025.
Questions about 2235 Fredrick Douglass Bl
Who owns 2235 Fredrick Douglass Bl?
The owner of record in NYC Department of City Planning PLUTO data is Kyrous Realty Group INC..
Does 2235 Fredrick Douglass Bl have violations?
Yes. NYC HPD has recorded 49 housing violations at this property.
Is 2235 Fredrick Douglass Bl rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2235 Fredrick Douglass Bl built?
City records list 2003 as the year it was built.
How many apartments are in 2235 Fredrick Douglass Bl?
It has 74 residential units and 76 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.