roofy

2235 Fredrick Douglass Bl

Manhattan, NY 10027BBL 1-01947-7501Map

Owner of record: Kyrous Realty Group INC.

2235 Fredrick Douglass Bl is a condominium built in 2003 in Manhattan, 10027. It has 74 residential units across 8 floors. The owner of record is Kyrous Realty Group INC.. HPD has recorded 49 housing violations here, most recently on November 17, 2025. 35 of the 49 most recent violations are still open.

HPD violations
49
DOB violations
31
ECB violations
13
HPD complaints
94

What to know

Concern
5 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Nov 17, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 49

  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 17, 2025

    Closed — Violation dismissed
  • C

    Properly repair with similar material the broken or defective parquet hardwood floor in the private hallway located at apt 2c, 2nd story, 1st apartment from north at east

    Jun 15, 2024 · Apt 2C

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective parquet hardwood floor in the 2nd room from north located at apt 2c, 2nd story, 1st apartment from north at east

    Jun 15, 2024 · Apt 2C

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective parquet wood floor in the 3rd room from north located at apt 2c, 2nd story, 1st apartment from north at east

    Jun 15, 2024 · Apt 2C

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2c, 2nd story, 1st apartment from north at east

    Jun 15, 2024 · Apt 2C

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2j, 2nd story, 1st apartment from south at west

    Sep 12, 2023 · Apt 2J

    Open — Notice of issuance sent to tenant
  • B

    Properly repair or replace the broken or defective rotted lower wall cabinet at west wall in the kitchen located at apt 2j, 2nd story, 1st apartment from south at west

    Sep 12, 2023 · Apt 2J

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 30, 2023

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective spring balance of lower window sash at west wall in the 1st room from north at west located at apt 7k, 7th story, 2nd apartment from south at west

    Mar 9, 2020 · Apt 7K

    Open — Nov sent out
  • B

    Properly repair the broken or defective spring balance of lower window sash at west wall in the 2nd room from north located at apt 7k, 7th story, 2nd apartment from south at west

    Mar 9, 2020 · Apt 7K

    Open — Nov sent out
Show 39 more ↓
  • B

    Properly repair the broken or defective spring balance of lower window sash at west wall in the 3rd room from north at west located at apt 7k, 7th story, 2nd apartment from south at west

    Mar 9, 2020 · Apt 7K

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 1st room from north at east located at apt 7k, 7th story, 2nd apartment from west at north

    May 21, 2019 · Apt 7K

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... at the wood floor in the 3rd room from north at west located at apt 7k, 7th story, 2nd apartment from south at west original violation 12979445 issued 25-mar-19 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Mar 25, 2019 · Apt 7K

    Open — Defect letter issued
  • B

    Trace and repair the source and abate the visible mold condition... at sink base cabinet in the kitchen located at apt 7k, 7th story, 2nd apartment from south at west original violation 12979450 issued 25-mar-19 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Mar 25, 2019 · Apt 7K

    Open — Defect letter issued
  • B

    Trace and repair the source and abate the visible mold condition... at wood floor in the 2nd room from north at west located at apt 7k, 7th story, 2nd apartment from south at west original violation 12979544 issued 25-mar-19 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Mar 25, 2019 · Apt 7K

    Open — Defect letter issued
  • A

    Properly repair the broken or defective wood floor in the 2nd room from north at west located at apt 7k, 7th story, 2nd apartment from south at west

    Mar 25, 2019 · Apt 7K

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... at wood floor in the 2nd room from north at west located at apt 7k, 7th story, 2nd apartment from south at west

    Mar 25, 2019 · Apt 7K

    Closed — Violation closed
  • A

    Properly repair the broken or defective wood floor in the 3rd room from north at west located at apt 7k, 7th story, 2nd apartment from south at west

    Mar 25, 2019 · Apt 7K

    Open — Nov sent out
  • A

    Properly repair the broken or defective wood at kitchen sink base in the kitchen located at apt 7k, 7th story, 2nd apartment from south at west

    Mar 25, 2019 · Apt 7K

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... at sink base cabinet in the kitchen located at apt 7k, 7th story, 2nd apartment from south at west

    Mar 25, 2019 · Apt 7K

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... at the wood floor in the 3rd room from north at west located at apt 7k, 7th story, 2nd apartment from south at west

    Mar 25, 2019 · Apt 7K

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the east and west walls in the 3rd room from north at west located at apt 7k, 7th story, 2nd apartment from south at west

    Jan 25, 2019 · Apt 7K

    Open — Nov sent out
  • B

    Arrange and make self-closing the doors ... in the entrance located at apt 7k, 7th story, 2nd apartment from south at west

    Jan 25, 2019 · Apt 7K

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective base cabinet at wash basin in the 2nd bathroom from north located at apt 7k, 7th story, 2nd apartment from south at west

    Jan 25, 2019 · Apt 7K

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the private hallway located at apt 7k, 7th story, 2nd apartment from south at west

    Jan 25, 2019 · Apt 7K

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 1st room from north at west located at apt 7k, 7th story, 2nd apartment from south at west

    Jan 25, 2019 · Apt 7K

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall in the 2nd room from north at west located at apt 7k, 7th story, 2nd apartment from south at west

    Jan 25, 2019 · Apt 7K

    Open — Nov sent out
  • B

    Properly repair the broken or defective electrical outlets in the kitchen located at apt 7k, 7th story, 4th apartment from south at west

    Jan 25, 2019 · Apt 7K

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 1st room from north at west located at apt 7k, 7th story, 2nd apartment from south at west

    Jan 25, 2019 · Apt 7K

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the walls in the 2nd bathroom from east located at apt 7k, 7th story, 2nd apartment from south at west

    Dec 24, 2018 · Apt 7K

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and walls in the 1st bathroom from east located at apt 7k, 7th story, 2nd apartment from south at west

    Dec 24, 2018 · Apt 7K

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the walls in the 3rd room from north at west located at apt 7k, 7th story, 2nd apartment from south at west

    Dec 24, 2018 · Apt 7K

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the walls in the private hallway located at apt 7k, 7th story, 2nd apartment from south at west

    Dec 24, 2018 · Apt 7K

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the walls in the 2nd room from north located at apt 7k, 7th story, 2nd apartment from south at west

    Dec 24, 2018 · Apt 7K

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the walls in the 1st room from north at west located at apt 7k, 7th story, 2nd apartment from south at west

    Dec 24, 2018 · Apt 7K

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective wood floor in the 1st room from north at west located at apt 7k, 7th story, 2nd apartment from south at west

    Dec 24, 2018 · Apt 7K

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the walls in the foyer located at apt 7k, 7th story, 2nd apartment from south at west

    Dec 24, 2018 · Apt 7K

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling and walls in the kitchen located at apt 7k, 7th story, 2nd apartment from south at west

    Dec 24, 2018 · Apt 7K

    Open — Nov sent out
  • B

    Properly repair the broken or defective base board heater cover in the 2nd room from north located at apt 7b, 7th story, 5th apartment from south at west

    Aug 21, 2018 · Apt 7B

    Closed — Violation closed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story

    May 14, 2018

    Open — Not complied with
  • A

    Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. at public hall, 1st story

    Oct 11, 2015

    Closed — Violation dismissed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system .. at public hall, 1st story

    Oct 11, 2015

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box .. at public hall, 1st story

    Oct 11, 2015

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Oct 11, 2015

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective spring balance at lower window sash 2nd from north at east in the 1st room from north at east located at apt 4f, 4th story, 4th apartment from north at east

    Sep 16, 2014 · Apt 4F

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 1; in the entire apartment located at apt 4f, 4th story, 4th apartment from north at east

    Sep 16, 2014 · Apt 4F

    Closed — Violation dismissed
  • A

    Refit all windows in the entire apartment located at apt 4f, 4th story, 4th apartment from north at east

    Aug 20, 2014 · Apt 4F

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 1; in the entire apartment located at apt 4f, 4th story, 4th apartment from north at east

    Aug 20, 2014 · Apt 4F

    Closed — Violation dismissed
  • C

    Remove the illegal fastening double cyclinder key operated lock at entrance door from street to vestible

    Nov 2, 2009

    Open — Not complied with

DOB building violations · 31

  • Construction other optional

    (2235 frederick douglas blvd). failure to maintain building exterior walls & appurtanences in a code compliant manner. at time of inspection, observed cracked defected mortar joints multi-locations @ exposures 1 and 4, east, north elevations. remedy: owner to repair and or replace

    May 16, 2026

    Dob violation - active
  • Construction other optional

    (2490 frederic douglas blvd) ftm bldg exter walls& appurt. obsrvd stepcracks, dislodge masonry bricks, open mortar joints, defected mortar joints, damaged metal cornice @ exp 1w elev. obsrvd stepcracks bricks, cracking stone masonry decor multilocatns, damaged masonry bricks wall @ exp 4 s elev. remedy:owner to repair and or replace

    May 16, 2026

    Dob violation - active
  • Construction other optional

    Failure to maintain building in code compliant manner.cracked/separate mortar joints on all expo. in multiple locations.also bulging/stone movement.at corner of exp#1&4(east&north elevation at parapet level remedy:fix and/or replace

    Jan 11, 2024

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 4, 2023

    Dob violation - dismissed
  • Construction other optional

    Failure to maintain building in code compliant manner.note:observed cracks and damaged joints at exposure 3 west elevation damaged joint @ exposure 2&4.cracks damaged joint @exposure1 including bulging/stone movement at corner of exposure 1&4.top floor remedy maintain building repair and or replace

    Sep 11, 2023

    Dob violation - active
  • Construction other optional

    Emergency work order due to bulging stone causing movement from wall at top floor corner of expsure 1 east elevation and exposure 4 north elevation immediately remove loose stone to prevent from collapsing remedy:make immed.repairs under superv. of nyc licensed professional

    Sep 11, 2023

    Dob violation - active
  • Construction other optional

    Failure to maintain building in code compliant manner observed at exp# 1,2 and 4.loose/damaged / decorative stone cracked/missing mortar joints on exposure 1,2 and 4.remedy:repair and/or replace

    May 23, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
Show 21 more ↓
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Construction other optional

    Emergency work order due to spalling/cracks cast stone at exp#1e.elev #2so.elev.&#3west ele.remedy:provide safety measures to secure the public safety&install public protection& exp#1,2,&3 make immed repair at facade wall @exp#1e.elev.#2so.elv.#3west elev.&#4north elev. under supervision of licensed professional

    Mar 24, 2023

    Dob violation - active
  • Hazardous condition (facade) facade required

    Cycle 9b unsafe report filed

    Feb 17, 2023

    Dob violation - active
  • Failure to correct swarmp conditions (facade) facade required

    Cycle 9b failure to correct swarmp conditions

    Feb 17, 2023

    Dob violation - active
  • Construction other optional

    Failure to maintain exterior building wall facade and appurtenances multiple cracks and morta joints throughout facade.loose stones at nor north east corner (exposure#1)and damaged stones on exposure#2 and exposure#4 remedy:maintain building facade and appurtenances.provide adequate safety measure.repair/relace damaged facade

    Feb 15, 2023

    Dob violation - active
  • Construction other optional

    Ftm bldh in a code compliant manner. multiple cracks and mortar joints throughout facade. loose stones at north east corner(exp1) and damaged stones at exp2 and exp4. remedy: comply with code

    Jan 11, 2023

    Dob violation - dismissed
  • Construction other optional

    Failure to maintain exterior building wall facade and appurtenances multiple cracks and mortar joints throughout facade.loose stones at north east corner (exposure#1)and damaged stones on exposure#2and exposure#4.remedy:maintain building facade and appurtenances .provide adequate safety measures.repair/replace damage facade

    Jan 11, 2023

    Dob violation - active
  • Construction other optional

    Emergency work order due to large verticle step crack, loose detached bricks and spararation of mortar joints. remedy: make immed repairs under supervision of licensed prof and immed extend public at exp1 and 4

    Nov 5, 2022

    Dob violation - active
  • Construction other optional

    Ftm bldg exterior walls facade and appurtenances. observed multiple cracks and open mortar joints throughout facade. also loose stone at north east corner. remedy: maintain bldg exterior walls facade and appurtenances. provide safety measures, repair facade as per 1rcny 103.04

    Oct 24, 2022

    Dob violation - active
  • Construction other optional

    Ftm bldg exterior walls facade and appurtenances. observed multiple defected conditions: loose stone at north east cornder and also cracks open joints. exp1 and corner south east and west upper corners remedy: maintain bldg exterior walls facade and appurtenances. prov safety measures repair facade as per 1 rcny 103.04

    May 9, 2022

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2019

    Jun 29, 2020

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 21, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 21, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 21, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 25, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 25, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 28, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 28, 2006

    Dob violation - resolved
  • Construction other optional

    C-construction other optional

    Nov 15, 2004

    Dob violation - active

ECB violations · 13

  • Class - 2

    Pedestrian protection does not meet code specifications. at time of inspections. at time of inspection at exposure 1(east elevation) damaged/deteriorated mudsills were observed. remedy: comply to code specifica

    May 12, 2025

    Resolve
  • Class - 1

    Unlawful acts.failure to comply with commissioner's order on "09/11/23" violation #"091123sr1002ns" states emergency work order to immediately remove loose stone & make repairs.as of today"01/11/24" loose stone

    Jan 11, 2024 · Penalty $2,530

    Active
  • Class - 1

    Failure to provide adequate safety measures such as shed netting etc.where required to protect public and property from documented unsafe facade as per 1rcny 103-04.as per unsafe notification#unsafe-913561-9b-0

    Mar 24, 2023 · Penalty $10,000

    Active
  • Class - 2

    Observed at exp1 east elevation loose parapet wall panel at exp4.remedy:conform shed to code specifications.

    Oct 24, 2022 · Penalty $10,000

    Active
  • Class - 2

    Failure to submit acceptable required cycle 8b report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control #813561.agg1:prior nov 37021383j under 28-30

    Oct 19, 2022 · Penalty $10,000

    Active
  • Class - 2

    Bc3307.6&27-1021 observed@exp4 n elevation sws doesnt meet code spec.loose parapet shaking&damaged roof@bldg wall.conform shed to code spec ns

    May 9, 2022 · Penalty $1,250

    Active
  • Class - 2

    Failure to submit an acceptable required cycle 8b report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control #813561.agg1:prior nov37013731r under 28

    Jun 1, 2021 · Penalty $3,125

    Active
  • Class - 2

    Work without a permit: noted: upon inspection observed apartment 7k fully demoed. all partition walls and studs have been removed. electrical and plumbing have not been removed. apartment 7k was 100% fully demo

    Feb 21, 2020

    Resolve
  • Class - 2

    Failure to maintain building in code compliant manner. at time of inspection, observed wall cracks around the living room window in apartment 7k. roughly 1" wide on the left side and roughly 2-3 inches wide on

    Jul 5, 2019 · Penalty $3,125

    Active
  • Class - 2

    Failure to submit a required cycle 8b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control# 813561. remedy: submit required technical report

    Oct 15, 2018 · Penalty $1,250

    Active
Show 3 more ↓
  • Non-hazardous

    84x10.26u15.17j01.74b14.64x10.84x-car communications inoperative.26u-tag top of car w/ current 2 & 5 year tags.17j-gibs riding at insufficent depth 15,3 & 2nd floors.74b-shorten ropes.64x-pit light inoperative.

    Jul 24, 2007

    Resolve
  • Non-hazardous

    84x10.38m07.26u15.64q03.08v01.74b14.17j01.84x-car communications inoperative.38m-car top light missing.26u-tag device w/ current 2 & 5 year tags.64q-install guard.08v-intermittent levelling problem.74b-shorten

    Jul 24, 2007

    Resolve
  • Non-hazardous

    Work w/o permit. work noted:at ground fl north east side store demo of full height partitions & suspending ceiling.erecting new sheetrock walls appl # 104701093 pre-filed.stop all work. remedy:obtain permit or

    Mar 24, 2007 · Penalty $500

    Resolve

Complaints

  • Water leak

    Heavy flow

    Feb 22, 2025 · Apt 2J

    Close
  • Electric

    Lighting

    Feb 22, 2025 · Apt 2J

    Close
  • Heat/hot water

    Apartment only

    Dec 2, 2024 · Apt 2C

    Close
  • Unsanitary condition

    Mold

    Jun 11, 2024 · Apt 2C

    Close
  • Flooring/stairs

    Floor

    Jun 7, 2024 · Apt 2C

    Close
  • Unsanitary condition

    Mold

    Sep 5, 2023 · Apt 2J

    Close
  • Unsanitary condition

    Mold

    Aug 29, 2023 · Apt 2J

    Close
  • Plumbing

    Basin/sink

    Aug 15, 2023 · Apt 2J

    Close
  • Water leak

    Heavy flow

    Aug 10, 2023 · Apt 2J

    Close
  • Heat/hot water

    Entire building

    Oct 3, 2022 · Apt 7B

    Close
Show 40 more ↓
  • Heat/hot water

    Apartment only

    Oct 2, 2022 · Apt 7B

    Close
  • Heat/hot water

    Entire building

    Oct 18, 2021 · Apt 7B

    Close
  • Heat/hot water

    Entire building

    May 30, 2021 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 4, 2020 · Apt 7B

    Close
  • Door/window

    Window frame

    Feb 12, 2020 · Apt 7K

    Close
  • Door/window

    Door frame

    Feb 12, 2020 · Apt 7K

    Close
  • Door/window

    Window frame

    Feb 7, 2020 · Apt 7K

    Close
  • Heat/hot water

    Entire building

    Oct 18, 2019 · Apt 7B

    Close
  • Heat/hot water

    Entire building

    Oct 17, 2019 · Apt 7B

    Close
  • Heat/hot water

    Entire building

    Oct 15, 2019 · Apt 7B

    Close
  • Heat/hot water

    Entire building

    Oct 13, 2019 · Apt 7B

    Close
  • Heat/hot water

    Entire building

    Oct 10, 2019 · Apt 7B

    Close
  • Heat/hot water

    Apartment only

    Oct 5, 2019 · Apt 7B

    Close
  • Paint/plaster

    Wall

    May 14, 2019 · Apt 7K

    Close
  • Heat/hot water

    Entire building

    May 12, 2019 · Apt 7B

    Close
  • Heat/hot water

    Entire building

    May 12, 2019 · Apt 7B

    Close
  • Heat/hot water

    Entire building

    Apr 26, 2019 · Apt 7B

    Close
  • Unsanitary condition

    Mold

    Mar 6, 2019 · Apt 7K

    Close
  • Unsanitary condition

    Mold

    Mar 6, 2019 · Apt 7K

    Close
  • Flooring/stairs

    Floor

    Jan 17, 2019 · Apt 7K

    Close
  • Paint/plaster

    Wall

    Jan 17, 2019 · Apt 7K

    Close
  • Electric

    Power outage

    Jan 17, 2019 · Apt 7K

    Close
  • Water leak

    Heavy flow

    Jan 17, 2019 · Apt 7K

    Close
  • Unsanitary condition

    Mold

    Jan 17, 2019 · Apt 7K

    Close
  • Unsanitary condition

    Mold

    Dec 17, 2018 · Apt 7K

    Close
  • Unsanitary condition

    Mold

    Nov 14, 2018 · Apt 7K

    Close
  • Heat/hot water

    Entire building

    Oct 14, 2018 · Apt 7B

    Close
  • Heat/hot water

    Entire building

    Oct 14, 2018 · Apt 7B

    Close
  • Paint/plaster

    Wall

    Aug 24, 2018 · Apt 7B

    Close
  • Paint/plaster

    Wall

    Aug 13, 2018 · Apt 7B

    Close
  • Heat/hot water

    Entire building

    May 19, 2018 · Apt 7B

    Close
  • Heat/hot water

    Entire building

    May 13, 2018 · Apt 7B

    Close
  • Heat/hot water

    Entire building

    Oct 13, 2017 · Apt 7B

    Close
  • Heat/hot water

    Entire building

    May 16, 2016 · Apt 5J

    Close
  • Heat/hot water

    Entire building

    Oct 16, 2015 · Apt 7B

    Close
  • Heat/hot water

    Entire building

    Oct 14, 2015 · Apt 7B

    Close
  • Heat/hot water

    Entire building

    Oct 12, 2015 · Apt 7B

    Close
  • Heat/hot water

    Entire building

    Oct 10, 2015 · Apt 7B

    Close
  • Heat/hot water

    Entire building

    Oct 9, 2015 · Apt 7B

    Close
  • Heat/hot water

    Entire building

    Oct 1, 2015 · Apt 7B

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Condominium (RM)
Year built
2003
Floors
8
Residential units
74
Building area
100,359 ft²
Lot area
20,570 ft²
Zoning
R8A
Community board
110
Council district
9
Block / lot
1947 / 7501
Assessed value
$6,457,500
Landmark / historic district
No

HPD registration #142132, last renewed Dec 1, 2025.

Questions about 2235 Fredrick Douglass Bl

Who owns 2235 Fredrick Douglass Bl?

The owner of record in NYC Department of City Planning PLUTO data is Kyrous Realty Group INC..

Does 2235 Fredrick Douglass Bl have violations?

Yes. NYC HPD has recorded 49 housing violations at this property.

Is 2235 Fredrick Douglass Bl rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 2235 Fredrick Douglass Bl built?

City records list 2003 as the year it was built.

How many apartments are in 2235 Fredrick Douglass Bl?

It has 74 residential units and 76 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.