222 West 136 Street
Manhattan, NY 10030BBL 1-01941-0144Map
Owner of record: 222west 136 Street Housing Development F Und Corp.
222 West 136 Street is a walk-up apartment building built in 1965 in Manhattan, 10030. It has 7 residential units across 3 floors. The owner of record is 222west 136 Street Housing Development F Und Corp.. HPD has recorded 104 housing violations here, most recently on May 16, 2024. 11 of the 50 most recent violations are still open.
- HPD violations
- 104
- DOB violations
- 7
- ECB violations
- 2
- HPD complaints
- 18
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 104
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 7, 3rd story, 2nd apartment from south at west
May 16, 2024 · Apt 7
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
May 16, 2024
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5, 2nd story, 2nd apartment from south at west
May 14, 2024 · Apt 5
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room at basement
May 14, 2024
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5, 2nd story, 2nd apartment from south at west
May 14, 2024 · Apt 5
Open — Notice of issuance sent to tenant - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 5, 2nd story, 2nd apartment from south at west
May 14, 2024 · Apt 5
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 7, 4th story, 2nd apartment from south at west
May 9, 2024 · Apt 7
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
May 9, 2024
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at west and east walls at public hall, 4th story
May 9, 2024
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department east and west walls at public hall, 4th story
May 9, 2024
Open — Nov sent out
Show 40 more ↓
- BHazardous
Provide a piece of garden hose 10 feet in length with female coupling and a 10 quart pail on premises to test sprinkler system.
May 30, 2023
Closed — Violation dismissed - ANon-hazardous
Paint or post a sign indicating floors at public hall
May 30, 2023
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 16, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 16, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 2, 2021
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ... in the entrance located at apt 1, 1st story, 1st apartment from south at west
Feb 11, 2021 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water 199 degrees found at fixtures in the bathroom located at apt 1, 1st story, 1st apartment from south at west
Feb 11, 2021 · Apt 1
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 25, 2019
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 10, 2018
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 9, 2017
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 27, 2016
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 1, 1st apartment from south at west
Sep 28, 2015 · Apt 1
Closed — Violation closed - CImmediately hazardous
Trace and repair the source and abate the nuisance consisting of mold ... at ceiling, approximately 25 square feet in the bathroom located at apt 1, 1st apartment from south at west
Sep 28, 2015 · Apt 1
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1, 1st apartment from south at west
Sep 28, 2015 · Apt 1
Closed — Violation closed - ANon-hazardous
Post and maintain a street number on the front of the dwelling plainly visible from the sidewalk.
Sep 28, 2015
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective 4th marble tread up from bottom at basement at public hall stairs
Sep 28, 2015
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall
Sep 28, 2015
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall
Sep 28, 2015
Closed — Violation closed - ANon-hazardous
Replace with new the missing safety electrical wall outlet cover at basement at public hall
Sep 28, 2015
Closed — Violation closed - BHazardous
Replace with new the missing electrical outlet cover at north wall in the bathroom located at apt 1, 1st apartment from south at west
Sep 28, 2015 · Apt 1
Closed — Violation closed - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl ... in the bathroom located at apt 1, 1st apartment from south at west
Sep 28, 2015 · Apt 1
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing located at apt 1
Sep 28, 2015 · Apt 1
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... north and west walls, approximately 20 square feet in the bathroom located at apt 1, 1st apartment from south at west
Sep 28, 2015 · Apt 1
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the nuisance consisting of mold ... at chaulking and tile grout at tub, approximatley 15 square feet in the bathroom located at apt 1, 1st apartment from south at west
Sep 28, 2015 · Apt 1
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 1
Sep 28, 2015 · Apt 1
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 3, 2015
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective frames windows thru out 4 sty apt 7. , section '' ''
Jan 13, 1997 · Apt 7
Closed — Violation closed - BHazardous
Replace with new the broken or defective base cabinet sink kitchen 4 sty apt 7. , section '' ''
Jan 13, 1997 · Apt 7
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and walls thru out 4 sty apt 7 , section '' ''
Jan 13, 1997 · Apt 7
Closed — Violation closed - BHazardous
Replace the broken or defective bowl toilet bathroom 4 sty apt 7. , section '' ''
Jan 13, 1997 · Apt 7
Closed — Violation closed - BHazardous
Replace with new the missing knobs vales tub bathroom 4 sty apt 7. , section '' ''
Jan 13, 1997 · Apt 7
Closed — Violation closed - ANon-hazardous
Refit door entrance east room 4 sty apt 7. , section '' ''
Jan 13, 1997 · Apt 7
Closed — Violation closed - BHazardous
Properly repair the broken or defective mortise lock door entrance 4 sty apt 7. , section '' ''
Jan 13, 1997 · Apt 7
Closed — Violation closed - BHazardous
Replace or repair the self-closing doors that is missing or defective entrance 4 sty apt 7. , section '' ''
Jan 13, 1997 · Apt 7
Open — Nov sent out - BHazardous
Replace with new the broken or defective glass window west room 4 sty apt 7. , section '' ''
Jan 13, 1997 · Apt 7
Closed — Violation closed - BHazardous
Replace with new the missing ceramic floor tiles bathroom 4 sty apt 7. , section '' ''
Jan 13, 1997 · Apt 7
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling west room 4 sty apt 7. , section '' ''
Jan 13, 1997 · Apt 7
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling east room 4 sty apt 7. , section '' ''
Jan 13, 1997 · Apt 7
Closed — Violation closed - CImmediately hazardous
Repair the leaky and/or defective water supply pipe ceiling bathroom basement apt 1 , section '' ''
Dec 27, 1995 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling private hall & north room basement apt 1 , section '' ''
Dec 27, 1995 · Apt 1
Closed — Violation closed
DOB building violations · 7
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 1, 1994
Dob violation - dismissed
ECB violations · 2
- Class - 2
Reissue35490642y exit door not selfclosing noted:ato my insp i observed@3fl smoke door@323 1st smoke door 101&to auditorium left rear exterior door@exit door not working properly violation issued5/21/20 for vio
Jul 8, 2021
Resolve - Class - 3
B354 50a 50a excessive black smoke condition coming from chimney at above address
Nov 8, 2008
Resolve
Complaints
- Heat/hot water
Entire building
Dec 4, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 4, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 3, 2024 · Apt 7
Close - Heat/hot water
Entire building
Dec 2, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 2, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
May 15, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
May 13, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
May 9, 2024 · Apt BLDG
Close - Plumbing
Water supply
Feb 11, 2021 · Apt 1
Close - Door/window
Door
Feb 11, 2021 · Apt 1
Close
Show 8 more ↓
- Door/window
Door
Feb 11, 2021 · Apt 7
Close - Plumbing
Water supply
Feb 11, 2021 · Apt 7
Close - Paint/plaster
Ceiling
Sep 24, 2015 · Apt 1
Close - Unsanitary condition
Mold
Sep 24, 2015 · Apt 1
Close - Unsanitary condition
Sewage
Sep 24, 2015 · Apt 1
Close - Water leak
Heavy flow
Sep 24, 2015 · Apt 1
Close - Heating
Heat related
Dec 12, 2003 · Apt ENT
Close - Heating
Heat related
Nov 28, 2003 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1965
- Floors
- 3
- Residential units
- 7
- Building area
- 2,625 ft²
- Lot area
- 1,749 ft²
- Zoning
- R7-2
- Community board
- 110
- Council district
- 9
- Block / lot
- 1941 / 144
- Assessed value
- $286,200
- Landmark / historic district
- Dorrance Brooks Square Historic District
HPD registration #129207, last renewed Jul 8, 2025.
Questions about 222 West 136 Street
Who owns 222 West 136 Street?
The owner of record in NYC Department of City Planning PLUTO data is 222west 136 Street Housing Development F Und Corp..
Does 222 West 136 Street have violations?
Yes. NYC HPD has recorded 104 housing violations at this property.
Is 222 West 136 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 222 West 136 Street built?
City records list 1965 as the year it was built.
How many apartments are in 222 West 136 Street?
It has 7 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.