Frederick Douglass Boulevard
Manhattan, NY 10027BBL 1-01937-0065Map
Owner of record: 2460 Fdb LP
Frederick Douglass Boulevard is an elevator apartment building built in 2024 in Manhattan, 10027. It has 94 residential units across 8 floors. The owner of record is 2460 Fdb LP. HPD has recorded 4 housing violations here, most recently on August 20, 2026. 4 of the 4 most recent violations are still open.
- HPD violations
- 4
- DOB violations
- 0
- ECB violations
- 16
- HPD complaints
- 5
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 4
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 401, 4th story, 4th apartment from west at north
Aug 20, 2026 · Apt 401
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 401, 4th story, 4th apartment from west at north
Aug 20, 2026 · Apt 401
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 505, 5th story, 4th apartment from east at south
Jul 25, 2026 · Apt 505
Open — Nov certified late - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 505, 5th story, 4th apartment from east at south
Jul 25, 2026 · Apt 505
Open — Nov certified late
DOB building violations · 0
No DOB violations on record
ECB violations · 16
- Class - 2
Inactive job site with a building footprint approx.. 14,115 sq. ft. i observed no competent watch person as per bc3303.7.7.6. a watch person meeting the requirements of section 3303.3 shall be on duty during al
Aug 23, 2025 · Penalty $2,500
Resolve - Class - 2
At the time of inspection, i observed plastic, pedestrian and vehicular traffic barriers in use, contrary to manufacturer's specifications. missing interlocking devices and some barriers were not compatible whi
Aug 23, 2025 · Penalty $1,250
Resolve - Class - 1
At the time of inspection at an 8-story new building, observed a section of the sidewalk shed removed. at the roof level, the parapet wall cap was incomplete, creating a hazardous condition for workers and pede
Aug 1, 2025 · Penalty $10,000
Resolve - Class - 2
Bc 3314.1 at time of inspection observed supported scaffold not maintained as per code. supported scaffold at exp# 3 loose netting not fully enclosed to facade, exp# 4 loosed plank not tied down and working pl
Aug 1, 2025 · Penalty $2,500
Resolve - Class - 2
During my inspection of an 8-story nb. i observed that no watch person was present on site for the proposed 6197 sq-ft footprint structure. at the superstructure phase, i walked the perimeter, looking through t
Jun 14, 2025 · Penalty $2,500
Resolve - Class - 1
Bc3303.3 watchperson, observed closed site with no active work, upon walk to the entire perimeter of the site, knock on fence and call out for watchperson and wait 10 minutes, did not get any response, no watch
Apr 15, 2025 · Penalty $5,030
Resolve - Class - 1
Bc 3301.12.2: at time of inspection at active jobsite currently at excavation phase upon request to see pre shift safety meeting log the one provided was inadequate with missing hazards and precautions needed
May 7, 2024
Resolve - Class - 1
At time of inspection at new 8 story building currently at excavation phase upon request to see super's daily log book the one provided was inadequately maintained with no record of any safety measures being ch
May 7, 2024
Resolve - Class - 1
Bc 3304.4.4 guardrail system: at time of inspection at new 8 story building currently at excavation phase i observed guardrail system inadequately installed at ramp area and leading edge creating a hazard for w
May 7, 2024 · Penalty $5,000
Resolve - Class - 1
Bc 3301.11.4 orientation content: at time of inspection at active jobsite currently at excavation phase upon request to see orientation for workers to verify they were properly informed and trained regarding ha
May 7, 2024
Resolve
Show 6 more ↓
- Class - 2
Bc 3303.2.4 sanitary facility: at time of inspection at active jobsite currently at excavation phase i observed 1 female worker and approx.13 males workers with only 2 port a johns 1 for females and other for
May 7, 2024
Resolve - Class - 2
At time of inspection observe excavation work taking place. observe excavator machine at the leading edge with improper guard rail system .observe yodoc use for the guard real system instead of wood as it
Apr 3, 2024 · Penalty $625
Resolve - Class - 2
Reviewed app.plans monitoring indicates opticalmonitoring installed adj.property exp2 276west132street site conditions not conform to plans,note:pe notes verify all monitoring sys in place before commencement
Mar 14, 2024
Resolve - Class - 2
At time of inspection of 8 story new building observed construction fence in place missing panels at exposure #4 solid wall as per approved plans.install panels.
Mar 12, 2024
Resolve - Class - 2
At time of inspection of nb 8 story inactive jobsite observed construction fence installed at exp1,4 upon review dob records it was observed that no permit were issued for temporary construction fence installat
Nov 22, 2022
Resolve - Class - 1
I observed active site at excavation phase with 3 workers inside approximately 15f below grade. no 45 degress slope as per plans show below the catch basin which is over 5f deep. hazard of soil collapse exists
Jun 13, 2022
Resolve
Complaints
- Water leak
Slow leak
Jul 28, 2026 · Apt 401
Close - Paint/plaster
Ceiling
Jul 28, 2026 · Apt 401
Close - Paint/plaster
Ceiling
Jul 22, 2026 · Apt 505
Close - Water leak
Heavy flow
Jun 23, 2026 · Apt 401
Close - Water leak
Slow leak
Jun 22, 2026 · Apt 401
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2024
- Floors
- 8
- Residential units
- 94
- Building area
- 58,196 ft²
- Lot area
- 7,765 ft²
- Zoning
- R7-2
- Community board
- 110
- Council district
- 9
- Block / lot
- 1937 / 65
- Assessed value
- $2,001,600
- Landmark / historic district
- No
HPD registration #145370, last renewed Apr 20, 2026.
Questions about Frederick Douglass Boulevard
Who owns Frederick Douglass Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is 2460 Fdb LP.
Does Frederick Douglass Boulevard have violations?
Yes. NYC HPD has recorded 4 housing violations at this property.
Is Frederick Douglass Boulevard rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was Frederick Douglass Boulevard built?
City records list 2024 as the year it was built.
How many apartments are in Frederick Douglass Boulevard?
It has 94 residential units and 96 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.