2358 8 Avenue
Manhattan, NY 10027BBL 1-01932-0004Map
Owner of record: Second Canaan HDFC
2358 8 Avenue is a walk-up apartment building built in 1910 in Manhattan, 10027. It has 19 residential units across 4 floors. The owner of record is Second Canaan HDFC. HPD has recorded 44 housing violations here, most recently on August 22, 2026. 35 of the 44 most recent violations are still open.
- HPD violations
- 44
- DOB violations
- 21
- ECB violations
- 2
- HPD complaints
- 50
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 44
- CImmediately hazardous
Remove device preventing door from being self-closing kickstand permanently installed at fire door at east wall leading to stairs at public hall, 1st story
Aug 22, 2026
Open — First no access to re- inspect violation - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Aug 22, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 25, 2019
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 2c, 2nd story, 1st apartment from east at south
Mar 26, 2018 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at the building entrance at public hall, 1st story
Mar 26, 2018
Open — Nov sent out - BHazardous
Provide security in event of a power outage by means of an acceptable mechanical heavy duty lock and latch set at the building entrance door at public hall, 1st story
Mar 26, 2018
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Mar 26, 2018
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Mar 26, 2018
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Mar 26, 2018
Open — Nov sent out
Show 34 more ↓
- ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Mar 26, 2018
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing at public hall, 1st story
Mar 26, 2018
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and walls in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Dec 3, 2017 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic floor and wall tiles in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Dec 3, 2017 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Abate the nuisance consisting of rodents rat excreta in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Dec 3, 2017 · Apt 1A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 1a, 1st story, 1st apartment from west at north
Dec 3, 2017 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Replace with new the missing lock and assembly in the entrance located at apt 1a, 1st story, 1st apartment from west at north
Dec 3, 2017 · Apt 1A
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 24, 2016
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the walls and ceiling in the bathroom located at apt 2c, 2nd story, 1st apartment from east at south
Jun 24, 2016 · Apt 2C
Open — Nov sent out - BHazardous
Properly repair the broken or defective light fixtures at the south wall in the bathroom located at apt 2c, 2nd story, 1st apartment from east at south
Jun 24, 2016 · Apt 2C
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures .. in the bathroom located at apt 2c, 2nd story, 1st apartment from east at south
Jun 24, 2016 · Apt 2C
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 2c, 2nd story, 1st apartment from east at south
Jun 24, 2016 · Apt 2C
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 1, 2015
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 2, 2015
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north located at apt 2c, 2nd story, 1st apartment from east at south
Oct 8, 2013 · Apt 2C
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling of the bulkhead at roof
Oct 8, 2013
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and north wall in the bathroom located at apt 2c, 2nd story, 1st apartment from east at south
Oct 8, 2013 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the foyer located at apt 1a, 1st story, 1st apartment from west at north
Sep 12, 2012 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the foyer located at apt 1a, 1st story, 1st apartment from west at north
Sep 12, 2012 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at the building entrance door
Nov 1, 2011
Open — Not complied with - BHazardous
Provide security in the event of a power outage by means of an acceptable mechanical lock and latch set at building entrance door
Nov 1, 2011
Open — Not complied with - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper.
Nov 1, 2011
Open — Not complied with - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.
Nov 1, 2011
Open — Not complied with - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing
Nov 1, 2011
Open — Not complied with - CImmediately hazardous
Properly repair with similar material the broken or defective with fire retardant materials unkeyed ceiling plaster at bulkhead public hall stairs 4th story
Nov 1, 2011
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling public hall stairs at bulkhead 4th story
Nov 1, 2011
Open — Not complied with - CImmediately hazardous
Properly repair with similar material the broken or defective with fire retardant materials unkeyed ceiling plaster at public hall stairs 3rd story
Nov 1, 2011
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling public hall stairs 3rd story
Nov 1, 2011
Open — Not complied with - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at cellar
Nov 9, 2010
Open — Not complied with - BHazardous
Properly repair the broken or defective wood floor in the kitchen located at apt 2c, 2nd story, 2nd apartment from east at south
Mar 13, 2008 · Apt 2C
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceilings and walls in the entire apartment located at apt 2c, 2nd story, 2nd apartment from east at south
Mar 13, 2008 · Apt 2C
Open — First no access to re- inspect violation - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor , at lobby, 1st story
Nov 20, 2002
Open — Not complied with - ANon-hazardous
File with this department a registration statement for building.
May 2, 2001
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of vermin roaches 4 sty southwest apt 4d kitchenette. , section '' ''
Jul 21, 1998 · Apt 4D
Open — Not complied with
DOB building violations · 21
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed
Show 11 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 2
- Hazardous
Work without a permit hazardous where as sidewalk shed installed without 1st obtaining permits form this department remedy obtain permit & or remove shed stop all work
Mar 1, 1994 · Penalty $800
Resolve - Hazardous
Failing to maintain exterior building wall. to wit: a section of brick parapet wall (approx. 4'*1) at the forward south side has fallen to roof of 2 story funeral home at south sections of south wall are bulged
Feb 6, 1994
Resolve
Complaints
- Door/window
Door
Aug 12, 2026 · Apt 4A
Close - Plumbing
Basin/sink
May 20, 2019 · Apt 2C
Close - Paint/plaster
Ceiling
Mar 15, 2018 · Apt 2C
Close - Unsanitary condition
Pests
Nov 9, 2017 · Apt 1A
Close - Paint/plaster
Wall
Nov 9, 2017 · Apt 1A
Close - Plumbing
Bathtub/shower
Nov 9, 2017 · Apt 1A
Close - Flooring/stairs
Floor
Nov 9, 2017 · Apt 1A
Close - Paint/plaster
Ceiling
Nov 9, 2017 · Apt 1A
Close - Electric
Lighting
Jun 15, 2016 · Apt 2C
Close - Paint/plaster
Ceiling
Jun 15, 2016 · Apt 2C
Close
Show 40 more ↓
- Paint/plaster
Wall
Jun 15, 2016 · Apt 2C
Close - Water leak
Heavy flow
Jun 15, 2016 · Apt 2C
Close - Paint/plaster
Wall
Sep 13, 2013 · Apt 2C
Close - Paint/plaster
Ceiling
Sep 13, 2013 · Apt 2C
Close - Plumbing
Water-leaks
Sep 13, 2013 · Apt 2C
Close - Plumbing
Water-leaks
Sep 13, 2013 · Apt 2C
Close - Heating
Heat related
Oct 29, 2011 · Apt 4B
Close - Heating
Heat related
Jan 22, 2011 · Apt 1A
Close - Heating
Heat related
Jan 18, 2011 · Apt 1A
Close - Plumbing
Water supply
Jan 13, 2011 · Apt 2C
Close - Heating
Heat related
Nov 19, 2010 · Apt BLDG
Close - Heating
Heat related
Nov 12, 2010 · Apt BLDG
Close - Heating
Heat related
Nov 12, 2010 · Apt 4D
Close - Heating
Heat related
Nov 11, 2010 · Apt BLDG
Close - Heating
Heat related
Nov 11, 2010 · Apt 1A
Close - Heating
Heat related
Nov 3, 2010 · Apt 1A
Close - General
Windows
Mar 7, 2008 · Apt 2C
Close - General
Floor
Mar 7, 2008 · Apt 2C
Close - General
Mold
Mar 7, 2008 · Apt 2C
Close - Plumbing
Water-leaks
Mar 7, 2008 · Apt 2C
Close - Nonconst
Vermin
Jul 12, 2007 · Apt 1A
Close - Nonconst
Vermin
Jul 12, 2007 · Apt 1A
Close - Heating
Heat related
Dec 30, 2006 · Apt 1A
Close - Paint/plaster
Wall
Jul 31, 2006 · Apt 2D
Close - Plumbing
Water-leaks
Jul 31, 2006 · Apt 2D
Close - Heating
Heat related
Jan 21, 2005 · Apt 1A
Close - Heating
Heat related
Jan 19, 2005 · Apt 1A
Close - Heating
Heat related
Jan 18, 2005 · Apt 2B
Close - Heating
Heat related
Jan 18, 2005 · Apt 1A
Close - Heating
Heat related
Jan 12, 2005 · Apt 2B
Close - Heating
Heat related
Jan 5, 2005 · Apt 2B
Close - Heating
Heat related
Dec 20, 2004 · Apt 2B
Close - General
Floor
Nov 23, 2004 · Apt 2B
Close - Nonconst
Odor
Nov 15, 2004 · Apt 1A
Close - Nonconst
Rubbish
Nov 15, 2004 · Apt 1A
Close - Nonconst
Odor
Nov 15, 2004 · Apt 2B
Close - Nonconst
Rubbish
Nov 15, 2004 · Apt 2B
Close - Heating
Heat related
Jan 30, 2004 · Apt 1 A
Close - Heating
Heat related
Jan 27, 2004 · Apt 2B
Close - Heating
Heat related
Jan 11, 2004 · Apt 1 A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C6)
- Year built
- 1910
- Floors
- 4
- Residential units
- 19
- Building area
- 20,660 ft²
- Lot area
- 7,500 ft²
- Zoning
- R7-2
- Community board
- 110
- Council district
- 9
- Block / lot
- 1932 / 4
- Assessed value
- $972,000
- Landmark / historic district
- No
HPD registration #126516, last renewed Jul 18, 2025.
Questions about 2358 8 Avenue
Who owns 2358 8 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Second Canaan HDFC.
Does 2358 8 Avenue have violations?
Yes. NYC HPD has recorded 44 housing violations at this property.
Is 2358 8 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2358 8 Avenue built?
City records list 1910 as the year it was built.
How many apartments are in 2358 8 Avenue?
It has 19 residential units and 23 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.