roofy

2100 Adam C Powell Blvd

Manhattan, NY 10027BBL 1-01931-0027Map

Owner of record: 209 W. 125th Streetrealty Associates

2100 Adam C Powell Blvd is an office building built in 1900 in Manhattan, 10027. The owner of record is 209 W. 125th Streetrealty Associates. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
39
ECB violations
30
HPD complaints
8

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 39

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 25, 2019

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 13, 2018

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 2, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 28, 2013

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - active
Show 29 more ↓
  • Construction other optional

    C-construction other optional

    Aug 23, 2011

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Mar 21, 2008

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Apr 2, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Oct 1, 2005

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 9, 2004

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 8, 2003

    Dob violation - resolved
  • Elevator elevatorrequired

    1p10547

    Jul 29, 2002

    Dob violation - resolved
  • Elevator elevatorrequired

    1p10547

    May 7, 2001

    Dob violation - resolved
  • Elevator elevatorrequired

    1p10547

    May 18, 2000

    Dob violation - resolved
  • Construction other optional

    C-construction other optional

    Nov 15, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1993

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    May 13, 1992

    Vp-violation unserved ecb-active
  • Construction other optional

    C-construction other optional

    Sep 19, 1991

    Dob violation - dismissed
  • Site safety none

    Cs-site safety none

    May 8, 1991

    Dob violation - dismissed
  • Elevator elevatorrequired

    Device #1p10547

    Mar 19, 1991

    Vp*-violation unserved ecb- dismissed
  • Electric signs none

    Es-electric signs none

    Mar 7, 1991

    Dob violation - dismissed
  • Electric signs none

    Es-electric signs none

    Mar 7, 1991

    Dob violation - dismissed
  • Electric signs none

    Es-electric signs none

    Mar 7, 1991

    Dob violation - dismissed
  • Electric signs none

    Es-electric signs none

    Mar 7, 1991

    Dob violation - dismissed
  • Electric signs none

    Es-electric signs none

    Mar 7, 1991

    Dob violation - dismissed
  • Electric signs none

    Es-electric signs none

    Mar 7, 1991

    Dob violation - dismissed
  • Electric signs none

    Es-electric signs none

    Mar 7, 1991

    Dob violation - dismissed
  • Electric signs none

    Es-electric signs none

    Mar 7, 1991

    Dob violation - dismissed
  • Electric signs none

    Es-electric signs none

    Mar 7, 1991

    Dob violation - dismissed
  • Electric signs none

    Es-electric signs none

    Mar 7, 1991

    Dob violation - dismissed

ECB violations · 30

  • Class - 2

    Reissue on ecb#35693374r failure to maintain building in code-compliant manner.illumination for exits,exit discharges and public corridors per bc 1006.1;27-381.noted:emergency illuminated discharge exit and exi

    Aug 7, 2026 · Penalty $3,125

    Active
  • Class - 2

    Emergency signs at elevator call stations missing,defective or non-compliant with section requirements.noted:emergency elevator call stations map missing on second floor observed upon inspection.rem:install and

    Aug 7, 2026 · Penalty $625

    Active
  • Class - 2

    Failure to maintain building in code-compliant manner.noted:storage inelectrical switch gear room with toilet paper cases,combustibles,batteries,jantorial products,garbage cans and vacuums observed upon inspect

    Aug 7, 2026 · Penalty $1,250

    Active
  • Class - 2

    Failure to maintain building in code-compliant manner.use of prohibited door and/or hardware per bc 1008.1.8;27-371(j).noted:installation ofillegal hardware kick stops on fire rated doors at corridor 131a,corri

    Aug 7, 2026 · Penalty $1,250

    Active
  • Class - 2

    Reissue#35688961p failure to mantain building in code compliant mannerillumination for exits,exit discharges and public corridors per bc 1006.1;27-381.noted:emergency lights not working when tested throughout v

    Sep 3, 2025 · Penalty $1,250

    Active
  • Class - 2

    Failure to maintain building in code-compliant manner: illumination for exits, exit discharges and public corridors per bc 1006.1; 27-381. noted approx. 50% of emergency lights with battery back up power not wo

    Sep 19, 2024 · Penalty $625

    Active
  • Class - 2

    Failure to maintain building in code-compliant manner. illumination for exits, exit discharges and public corridors per bc 1006.1;27-381. at 3r fl school area near room no-116 one emergency exit light, 3rd fl o

    Jun 5, 2023 · Penalty $625

    Resolve
  • Class - 2

    28-302.1 reissued #35558037y failure to provide ventilation to gas meter room per p115.6(1968 code)fac appendix e(e4)(2014 doe) at time of inspection observed at basement level no mechanical ventilation provide

    May 20, 2022

    Resolve
  • Class - 2

    67x10 100b01 67x-communication system not working repair communication system 100b-able to open car door when car is out of door zone unlocking device needs adjustment not to open more than four inches restrict

    Oct 31, 2011

    Resolve
  • Non-hazardous

    39b07,51m07,66y02,14m07,84r09,41m07. (39b) provide natural ventilation(51m) anti spin out for ropes. 66y oil leak from piston (14m) provide code data plate (84r) illegal vestibule roof level.

    Nov 27, 2007 · Penalty $350

    Resolve
Show 20 more ↓
  • Hazardous

    Failure to maintain exterior building wall defect is ornamental sand stone at 3rd floor windows various location erroded mortor joints & bulging remedy:provide protection for the public make all necessary repai

    May 5, 2005

    Resolve
  • Non-hazardous

    Micellaneous violations of the zoning resolution. noted : establishinga nw use in cellar from eating & drinking establishment to a physical cultural estab. w/o a b.s.a. permit ( bureau of standards & appeals pe

    Sep 10, 2004 · Penalty $500

    Resolve
  • Non-hazardous

    Exit door : required width decreased by obstruction. noted : cellar level gym, d.b.a. dolphin fitness, inc. arranged with approx. 70 exercise apparati, has both cellar level doors to secondary means of egress o

    Sep 10, 2004 · Penalty $2,500

    Resolve
  • Non-hazardous

    Exit lighting defective. noted : two cellar level, illuminated exit signs to secondary means of egress for 70 execrise (approx) machine, dolphin fitness, inc. gytm are not operating. stairwell egress to street

    Sep 10, 2004 · Penalty $2,500

    Resolve
  • Non-hazardous

    Occupancy contrary to that allowed by the certificate of occupancy. noted legal occupancy as epr co. # 108948 from - cellar : storage and boiler rm. to - illegal occupacny in cellar, gym contrary to the certifi

    Dec 8, 2003 · Penalty $2,500

    Resolve
  • Non-hazardous

    Occupancy contrary to that allowed by the certificate of occupancy # 117216 noted: at 3 rd floor of premises space is being used ad a gym . dba dolphin fitness w/ weight machines lockers accessory child care

    Jul 17, 2001 · Penalty $800

    Resolve
  • Non-hazardous

    Operation of a p lone of assemby w/out obtaining a valid p.a. permit noted at 3 rd floor level gym in operation intil capacity segn posted to accomadate 166 persons

    Jul 17, 2001 · Penalty $500

    Resolve
  • Non-hazardous

    Failure to maintain exterior building wall. defect is: stucco at west side 2nd sty are broken & defective and crack on west 125 street frontwall (west wall). remedy: make all repairs in a safe & lawful manner.

    Nov 15, 1999

    Resolve
  • Non-hazardous

    Work does not conform to approved plans/application. noted: non-conforming work under dir. 14 type 3 application #101059603 for awning with wording # 1 stop fashions "letering not to exceed 12" & total wording

    Jun 26, 1998

    Resolve
  • Non-hazardous

    73x, 15c, 40m, 73u, 53i, 36w, 36i, 53x. 35--wall. 73(x) restore to service.

    Nov 28, 1994 · Penalty $500

    Resolve
  • Non-hazardous

    Work without a permit. work noted: work being done on front entire celing. installation and removal of ceiling. at 3rd floor remedy: obtain a permit.

    Jun 30, 1994 · Penalty $1,000

    Resolve
  • Non-hazardous

    73x,15c,40m,73m,73u,53x,36w,35i, 73 restore to service so that a proper inspections can be made by this dept. 40 data plate. 35 wall.

    Feb 16, 1994 · Penalty $500

    Resolve
  • Non-hazardous

    Work wtihout permit noted replacement of old wooden frame glass window to new aluminum metal frame glass windows at 2 & 3 floor east & southside of the building total 26 windows remedy obtain permit & approval

    May 17, 1993 · Penalty $1,000

    Resolve
  • Non-hazardous

    Work without permit. noted. work being done on entire ceiling install-ation removal of ceiling at 3rd floor. levle without any permit as perviol. 21988cd4ledi. stop work. remedy:stop work and obtain permit & ap

    Feb 2, 1993 · Penalty $1,000

    Resolve
  • Non-hazardous

    73x, restore to service so that a proper inspection can be made

    Jan 19, 1993

    Resolve
  • Non-hazardous

    73#,36w,53x,73x,40t,50y, 73 perform 5 yr test-tag device-file elv3 form

    Apr 8, 1992 · Penalty $150

    Resolve
  • Hazardous

    Failure to maintain exterior bldg wall: structural crack approx 1" in width of facade, starting at the 2nd flr window and ranging to the top of the 3rd flr window at the corner of 125th street and adam clayton

    Sep 12, 1991 · Penalty $1,000

    Resolve
  • Hazardous

    Failure maintain exterior bldg wall:structural crack approx 1' width of facade. starting at the 2nd flr window and ranging to the top of the 3rd flr window at the corner of 125 st and adam clayton power jr. bl

    Jul 12, 1991

    Resolve
  • Non-hazardous

    Failure to maintain exterior building wall. structural crack approximately 1'inch in width of the facade startubg at the 2nd floor window and range to the top of the 3rd floor window at the corner of 125 st

    Dec 6, 1990 · Penalty $1,000

    Resolve
  • Hazardous

    Work without permit work being done on entire ceiling installation and removal of ceiling at third floor level without a permit stop work remedy stop work and obtain plans and approval from this dept

    Dec 19, 1988 · Penalty $250

    Resolve

Complaints

  • Electric

    Wiring

    Mar 29, 2013 · Apt 1A

    Close
  • Paint/plaster

    Wall

    Mar 29, 2013 · Apt 1A

    Close
  • Paint/plaster

    Wall

    Mar 29, 2013 · Apt 1A

    Close
  • Electric

    Wiring

    Mar 29, 2013 · Apt 1A

    Close
  • Electric

    Wiring

    Mar 29, 2013 · Apt 1A

    Close
  • Plumbing

    Basin/sink

    May 5, 2004 · Apt 4E

    Close
  • Appliance

    Electric/gas range

    May 5, 2004 · Apt 4E

    Close
  • General

    Floor

    May 5, 2004 · Apt 4E

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Office building (O5)
Year built
1900
Floors
3
Residential units
—
Building area
33,740 ft²
Lot area
12,500 ft²
Zoning
C4-7
Community board
110
Council district
9
Block / lot
1931 / 27
Assessed value
$5,737,050
Landmark / historic district
No

Questions about 2100 Adam C Powell Blvd

Who owns 2100 Adam C Powell Blvd?

The owner of record in NYC Department of City Planning PLUTO data is 209 W. 125th Streetrealty Associates.

Does 2100 Adam C Powell Blvd have violations?

NYC HPD has no housing violations on record for this property.

Is 2100 Adam C Powell Blvd rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 2100 Adam C Powell Blvd built?

City records list 1900 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.