roofy

100 West 125 Street

Manhattan, NY 10027BBL 1-01909-0033Map

Owner of record: 125th & Lenox Owner LLC

100 West 125 Street is a store building built in 2013 in Manhattan, 10027. The owner of record is 125th & Lenox Owner LLC. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
66
ECB violations
40
HPD complaints
3

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 66

  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 1, 2022

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 18, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 18, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 18, 2019

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
Show 40 more ↓
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 31, 2018

    Dob violation - resolved
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2016 inspection/test

    Sep 15, 2017

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2015 inspection/test

    Dec 1, 2016

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2015 inspection/test

    Dec 1, 2016

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2015 inspection/test

    Dec 1, 2016

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2015 inspection/test

    Dec 1, 2016

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2015 inspection/test

    Dec 1, 2016

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2015 inspection/test

    Dec 1, 2016

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2015 inspection/test

    Dec 1, 2016

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2015 inspection/test

    Dec 1, 2016

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2015 inspection/test

    Dec 1, 2016

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2015 inspection/test

    Dec 1, 2016

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2015 inspection/test

    Dec 1, 2016

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2015 inspection/test

    Dec 1, 2016

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2015 inspection/test

    Dec 1, 2016

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2015 inspection/test

    Dec 1, 2016

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2015 inspection/test

    Dec 1, 2016

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2015 inspection/test

    Dec 1, 2016

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2015 inspection/test

    Dec 1, 2016

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2015 inspection/test

    Dec 1, 2016

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2015 inspection/test

    Dec 1, 2016

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2015 inspection/test

    Dec 1, 2016

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2015 inspection/test

    Dec 1, 2016

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2015 inspection/test

    Dec 1, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 7, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 7, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 7, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 27, 2016

    Dob violation - dismissed

ECB violations · 40

  • Class - 1

    Bc3301.1.3-failure to use equipment as per manufacturer specifications. at the time of my inspection construction work in progress. i observed workers using a jlg scissors lift approx 12 ft high with a ladder

    Jun 17, 2016 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to adequately supervise workers at a construction site,so as to maintain a safe construction site & ensure compliance w/approved construction documents & chapter 33(safeguard during construction. at the

    Jun 17, 2016 · Penalty $1,600

    Resolve
  • Class - 1

    Bc3301.2- failure to safeguard all persons and property affected by construction operations at the time of my insp.i was responding to complaint #1426469.as per job site superintendent a section of the job site

    Jun 17, 2016 · Penalty $8,000

    Resolve
  • Class - 1

    3307.7.5fail to provide design of fence.@ time of my inspection const work in progress. i observed job site fence tie to a man lift and pieces of steel to hold in place creating a hazardous condition to the pub

    Jun 17, 2016 · Penalty $1,600

    Resolve
  • Class - 2

    Failure to maintain bldg in code complaint manner. note job site fence a section approx 50'x0" linear feet fell side leaving the jobsite open & unguarded. remedy: repair &/or replace.

    May 15, 2016 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by construction operation. note: at the time of my inspection of a 6 sty bldg at bulkhead level,construction work in progress. i observed a worker approx 12

    May 4, 2016 · Penalty $1,000

    Resolve
  • Class - 1

    Sec. 3314.4.5.2 use of scaffold w/o certification card. note: at the time of my inspection of a 6 sty bldg at bulkhead level,construction work in progress. i observed workers using scaffold approx 12 feet in ht

    May 4, 2016 · Penalty $800

    Resolve
  • Class - 1

    Sec. 3301.6 design,sizes & capacity of materials,structures,temporary construction & equipment. note: at the time of my inspection of a 6 sty bldg at bulkhead level,construction work in progress. i observed mak

    May 4, 2016 · Penalty $1,600

    Resolve
  • Class - 1

    Sec. 48 failure to adequately supervide work at a construction site,soas to maintain a safe construction site & ensure compliance w/approvedconstruction documents & chapter 33(safeguard during construction & de

    May 4, 2016 · Penalty $1,600

    Resolve
  • Class - 1

    Fail to maintain safety measure - safety/safeguard.note:toe boards around perimeter.obs flrs 4,5 w/metal framing around bldg perimeter.tracking being used as a toeboard inadequate 1 1/2".potential falling objec

    Dec 9, 2015 · Penalty $1,000

    Resolve
Show 30 more ↓
  • Class - 2

    Sidewalk shed parapet sign is not provided. noted: at time of inspection sidewalk shed parapet sign all to 3301.9 is not provided. remedy: provide sidewalk shed parapet sign all to 3301.9.

    Nov 20, 2015

    Resolve
  • Class - 2

    Pedestrian protection does not meet code specs. noted: at time of inspection temporary walkway on w 124 st side missing lighting. temporary walkway on w 125 st missing blind corner mirrir. remedy: conform shed

    Nov 20, 2015 · Penalty $2,400

    Resolve
  • Class - 1

    Bc3314.4.3.3 failure installed maintain safety equipment measures on supported pipe scaffolding erected on 5th and 6th floor for masonry use w/o proper work platform completed, no toeboard/guardrails and sill

    Nov 7, 2015 · Penalty $1,600

    Resolve
  • Class - 1

    Bc3303.4.1 failure to institute maintain safety equipment measures or temporary construction note @ time of inspection active job site of (all) stories bldg observed (scissors)metal staircase leading from 1st f

    Nov 7, 2015 · Penalty $1,600

    Resolve
  • Class - 1

    3303.12 hoist not in readiness.at time of inspection active job site building complete to 6th fl. 83'-0" no hoist installed as required whenbuilding reaches 75'-0" and work in progress erecting steel at 6th fl.

    Oct 27, 2015 · Penalty $1,600

    Resolve
  • Class - 1

    Fail to perform successful hydrostatic test on standpipe.note:at time inspection active construction site,building complete to 6 stories at 83'-0" standpipe complete to 5th fl. and no hydrostatic test completed

    Oct 27, 2015 · Penalty $2,400

    Resolve
  • Class - 1

    3307.5 failure to provide flag person.at time of inspection.trailer reversing into site at the corner of lenox and 124th street.pedestrian crossing the street and no flag person directing pedestrian/traffic wit

    Oct 27, 2015 · Penalty $400

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment or temporary construction (guardrails).as noted:at time of inspection at active job site observed missing guardrails at 2nd fl.,east elevation inadequate guardrail

    Sep 25, 2015 · Penalty $1,200

    Resolve
  • Class - 2

    Job site fence not constructed pursuant to subsection. at time of inspection of nb #121328134 has construction fence under same appl #121328134-01-eq-fn built to approx 12 feet high at exp 1 & 2 (west 124 st)

    Oct 14, 2014

    Resolve
  • Class - 2

    3304.4.4failure to provide 3'6"guardrail or solid enclosure around open & accessible sides of excavation.at time of insp,observed no fall protection @ the top of excavated area where there is a 45 degree slope

    Sep 25, 2014

    Resolve
  • Class - 2

    Work does not conform to approved const docs.the contractor failed to install the approach box for the underpinning as per the approved plans.rem:conform to approved docs or provide approved amended plans.

    Sep 25, 2014

    Resolve
  • Class - 1

    28-407.1,failure to have welders license for mannual structural welding.noted @ 6 story new bldg under const @(met)foundation level(partial)has unlicensed welder @ exp4 installing structural steel columns for s

    Aug 13, 2014 · Penalty $1,600

    Resolve
  • Class - 1

    3301.7,design drawing required by the provision of chapter 33 of nyc.noted:@ time of insp observed the following:6 story new bldg under const @(partial)mat foundation,installing steel i beam for shoring @.exp 4

    Aug 13, 2014 · Penalty $400

    Resolve
  • Class - 2

    3307.2.2,temporary walkways.noted:@ time of insp observed temporary walkway @ exp 1,2&3 w/ no additional lighting for walkway.w/ walkway into street w/(barwires).const fence taking up sidewalk.rem:provided ligh

    Aug 13, 2014

    Resolve
  • Class - 2

    Failure to provide approval/accepted plans @ job site @ time of insp noted:@ 6 story new bldg under const in process of mat foundation has(missing)pages to foundation approved plan.pages(missing)are 17,89"parti

    Aug 13, 2014

    Resolve
  • Class - 2

    Work does not conform to approved const documents &/or approved amendments.@ time of insp,observed mat foundation being installed @ cellar level has not installed ancher bolts & columns pts.column f,e axis 6 &7

    Aug 13, 2014

    Resolve
  • Class - 2

    Job site fence not const pursuant to subsection.@ time of insp @ nb# 121328134 has const fence under same application 121328134-01-ew-fn built to approx 12'ft high @ exp 1,2 & 3 w/ no design plan.bldg code allo

    Aug 13, 2014

    Resolve
  • Non-hazardous

    Work w/o permit:work noted:complete demolished of a 4 story masonary bldg to grade.remedy:obtain permit

    Jan 3, 2007 · Penalty $500

    Active
  • Hazardous

    Failure to maintain. defects noted: at front of premises west side roll down gate & part of awning collapsed onto sidewalk. vacant ldg has no fl at ground level. remedy: make safe, repair &/ or replace defects.

    Oct 20, 2006 · Penalty $2,500

    Resolve
  • Hazardous

    Failure to maintain exterior bldg wall noted in rear of premises there are loose brick motor in various locations throughout exterior wall remedy maintain exterior bldg wall

    Jun 28, 2003 · Penalty $800

    Resolve
  • Non-hazardous

    Failure to maintian building 1-tank room has exposed & open celing & can see fl joists of upper fl.2-electric room has larage area of ceiling missing & open 3-bulkhead stair area defective and 4-skyligh missing

    Mar 7, 1997 · Penalty $1,000

    Resolve
  • Hazardous

    Hazardous failure to provide at least two means of egress from room or space where required noted no secondary means of egress from apt#7 at n/e side of building at 4fl level no fire escape remedy provide requi

    Mar 7, 1997 · Penalty $475

    Resolve
  • Hazardous

    Failure to maintain exterior bldg wall: at time of inspection the front facade of the bldg has a stepping vertical structural cark approx 1/2 inch wide and 4ft high, at the pacapet and is approx 15 feet to 20 f

    Jun 17, 1992 · Penalty $2,000

    Resolve
  • Hazardous

    Failure to maintain exterior bldg wall: brick parapet at north front of bldg has structural crack 1/2" wide approx 4 feet in height its approx 20' from east corner of bldg. remedy: repair or replace brick parap

    Nov 20, 1991 · Penalty $1,000

    Resolve
  • Hazardous

    Failure to maintain exterior bldg wall:brick parapet at north fromt of bldg, has structural crack 1/2' wide approx. 4 feet in height, its approx. 20'from e corner of bldg.remedy:repair or replace brick parape

    Sep 12, 1991 · Penalty $1,800

    Resolve
  • Hazardous

    Failure to maintain exterior bldg wall:brick parapet at north front ofbuilding,has structural crack 1/2",wide approx 4 feet in height,its aprox 20' from east corner of bldg. remedy:repair or replace brick parap

    Jul 12, 1991 · Penalty $1,000

    Resolve
  • Hazardous

    Failure to maintain exterior bldg.wall facade at south elevation has am apprx.3/4 diagonal structural crack appx.4ft.in height approx.20ft.from east corner of bldg.(upper portion)remedy:make necessary repairs

    May 8, 1991 · Penalty $1,000

    Resolve
  • Non-hazardous

    Failure to maintain exterior. noted: approximately 20'0" of decorative corvice on lenox ave (south east )side has separated from parapet/bldg. at 4 fl. roof level and hanging in a dangerous postion, creating

    Mar 8, 1991 · Penalty $720

    Resolve
  • Non-hazardous

    Failure to maintain exterior building wall brick parapet at north front of building brick parapet has structural crack aprox.4 feet in height by 20 feet in width. remedy: repair or replace brick parapet as to

    Dec 6, 1990

    Resolve
  • Hazardous

    Boilers

    Oct 11, 1988 · Penalty $1,000

    Resolve

Complaints

  • Unsanitary condition

    Garbage/recycling storage

    Jun 16, 2016 · Apt BLDG

    Close
  • Heating

    Heat related

    Jan 14, 2004 · Apt 22

    Close
  • Heating

    Heat related

    Feb 20, 2003 · Apt 22

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Store building (K6)
Year built
2013
Floors
5.5
Residential units
—
Building area
160,501 ft²
Lot area
32,800 ft²
Zoning
C4-4D
Community board
110
Council district
9
Block / lot
1909 / 33
Assessed value
$26,054,550
Landmark / historic district
No

Questions about 100 West 125 Street

Who owns 100 West 125 Street?

The owner of record in NYC Department of City Planning PLUTO data is 125th & Lenox Owner LLC.

Does 100 West 125 Street have violations?

NYC HPD has no housing violations on record for this property.

Is 100 West 125 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 100 West 125 Street built?

City records list 2013 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.