roofy

1967 Adam C Powell Blvd

Manhattan, NY 10026BBL 1-01903-7503Map

Owner of record: Unavailable Owner

1967 Adam C Powell Blvd is a condominium built in 1900 in Manhattan, 10026. It has 35 residential units across 5 floors. The owner of record is Unavailable Owner. HPD has recorded 80 housing violations here, most recently on May 25, 2023. 45 of the 50 most recent violations are still open.

HPD violations
80
DOB violations
9
ECB violations
18
HPD complaints
66

What to know

Concern
5 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation May 25, 2023

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 80

  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 7, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 4a, 4th story, 1st apartment from south at west

    May 25, 2023 · Apt 4A

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city health code section 24 rcny chapter 12.

    May 25, 2023

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... at ceiling ( approx 20 sqft) and at east wall ( approx 5 sqft) at public hall, 4th story original violation 14886949 issued 25-feb-22 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Feb 25, 2022

    Open — Defect letter issued
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling, east wall and west wall at public hall, 4th story

    Feb 25, 2022

    Open — Nov sent out
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling at public hall, 4th story

    Feb 25, 2022

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... at ceiling ( approx 20 sqft) and at east wall ( approx 5 sqft) at public hall, 4th story

    Feb 25, 2022

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... at ceiling ( approx 15 sqft) in the bathroom located at apt 4d, 4th story, 1st apartment from north at east

    Feb 25, 2022 · Apt 4D

    Open — First no access to re- inspect violation
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling in the foyer located at apt 4d, 4th story, 1st apartment from north at east

    Feb 25, 2022 · Apt 4D

    Open — Nov sent out
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 4d, 4th story, 1st apartment from north at east

    Feb 25, 2022 · Apt 4D

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 4d, 4th story, 1st apartment from north at east

    Feb 25, 2022 · Apt 4D

    Open — Nov sent out
Show 40 more ↓
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 4d, 4th story, 1st apartment from north at east

    Feb 25, 2022 · Apt 4D

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 4d, 4th story, 1st apartment from north at east

    Feb 25, 2022 · Apt 4D

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 24, 2016

    Closed — Violation dismissed
  • B

    Provide security in the event of a power outage by means of an acceptable mechanical haevy duty latch and lockset at the building entrance door from street at public hall, 1st story

    Feb 24, 2012

    Open — Nov sent out
  • C

    Remove the illegal fastening consisting of an electromagnetic locking device installed at the building entrance door from street at public hall, 1st story

    Feb 24, 2012

    Open — Nov sent out
  • B

    Section 300, 301, 302, m/d law file plans and obtain a certificate of occupancy to legalize the following alteration or restore premises to prior legal condition increase of apartments from five (5) to thirty (35) apartments contrary to certificate of occupancy

    Feb 24, 2012

    Open — Nov sent out
  • B

    Provide adequate light of not less than 60 watts incandescent or equivalent illumination no light fixture at public hall

    Aug 18, 2005

    Open — Nov sent out
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 5, 2nd story, 1st apartment from west at north

    Aug 18, 2005 · Apt 5

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceilings in the kitchen located at apt 5, 2nd story, 1st apartment from west at north

    Aug 18, 2005 · Apt 5

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 5, 2nd story, 1st apartment from west at north

    Aug 18, 2005 · Apt 5

    Open — Nov sent out
  • B

    M/d law abate the nuisance consisting of no electricity all storys at public hall

    Aug 18, 2005

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceilings and walls in the entire apartment located at apt 5, 4th story, 1st apartment from west at north

    Aug 17, 2005 · Apt 5

    Open — Nov sent out
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 5, 4th story, 1st apartment from west at north

    Aug 17, 2005 · Apt 5

    Open — Nov sent out
  • B

    Properly repair the broken or defective door in the entrance located at apt 5, 4th story, 1st apartment from west at north

    Aug 17, 2005 · Apt 5

    Open — Nov sent out
  • C

    M/d law abate the nuisance consisting of no electricity to all stys at at public hall

    Aug 17, 2005

    Open — Nov sent out
  • C

    M/d law abate the nuisance consisting of no lights all sty.throughout building at public hall

    Aug 13, 2005

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color north wall in the 3rd room from east located at apt 7, 5th story, 1st apartment from west at north

    Aug 13, 2005 · Apt 7

    Open — Nov sent out
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate .. in the 1st room from north at west located at apt 7, 5th story, 1st apartment from west at north

    Aug 13, 2005 · Apt 7

    Open — Nov sent out
  • B

    M/d law abate the nuisance consisting of evedence of water leak at ceiling in the 2nd room from east located at apt 7, 5th story, 1st apartment from west at north

    Aug 13, 2005 · Apt 7

    Open — Nov sent out
  • B

    M/d law abate the nuisance consisting of evedience of water leak at ceiling in the bathroom located at apt 7, 5th story, 1st apartment from west at north

    Aug 13, 2005 · Apt 7

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Aug 13, 2005

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the 2nd room from east located at apt 7, 5th story, 1st apartment from west at north

    Aug 13, 2005 · Apt 7

    Open — Nov sent out
  • A

    Refit door in the entrance located at apt 7, 5th story, 1st apartment from west at north

    Aug 13, 2005 · Apt 7

    Open — Nov sent out
  • C

    M/d law abate the nuisance consisting of no lights at all sty's at public hall

    Aug 12, 2005

    Open — Nov sent out
  • C

    M/d law abate the nuisance consisting of no electrical supply to light fixtures all stories at public hall

    Aug 11, 2005

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation the 1st door frame from west at north wall, 1st door from west at north wall in the foyer located at apt 8, 5th story, 1st apartment from east at south

    Dec 19, 2004 · Apt 8

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation the 1st radiator from west at north wall in the 3rd private hallway from east located at apt 8, 5th story, 1st apartment from east at south

    Dec 19, 2004 · Apt 8

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the foyer located at apt 8, 5th story, 1st apartment from east at south

    Dec 19, 2004 · Apt 8

    Open — Nov sent out
  • B

    Properly repair the broken or defective lock at entrance door in the foyer located at apt 8, 5th story, 1st apartment from east at south

    Dec 19, 2004 · Apt 8

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the west wall, 1st door frame from west at north wall, 1st door frame from west at north wall, ceiling in the 3rd private hallway from east located at apt 8, 5th story, 1st apartment from east at south

    Dec 19, 2004 · Apt 8

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the chair rails at south wall, chair rails at north wall, 1st dumb waiter from east at south wall, 1st door frame from east at south wall, 1st door from east at south wall in the foyer located at apt 8, 5th story, 1st apartment from east at south

    Dec 19, 2004 · Apt 8

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from west at north wall in the 2nd room from east located at apt 8, 5th story, 1st apartment from east at south

    Dec 19, 2004 · Apt 8

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from east located at apt 8, 5th story, 1st apartment from east at south

    Dec 19, 2004 · Apt 8

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from west at north wall, 1st door from west at north wall, 1st door frame from west at north wall in the 3rd room from east located at apt 8, 5th story, 1st apartment from east at south

    Dec 19, 2004 · Apt 8

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the 2nd room from east located at apt 8, 5th story, 1st apartment from east at south

    Dec 19, 2004 · Apt 8

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall, east wall, south wall, north wall in the 2nd private hallway from east located at apt 8, 5th story, 1st apartment from east at south

    Dec 19, 2004 · Apt 8

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st window frame from south at west wall, 1st window frame from south at west wall, 1st window frame from south at west wall, east wall, 1st door frame from north at east wall, 1st door from north at east wall, 1st closet from north at east wall door frame, 1st closet from north at east wall door in the 1st room from east at north located at apt 8, 5th story, 1st apartment from east at south

    Dec 19, 2004 · Apt 8

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the 1st closet from west at north wall wall in the 1st private hallway from east located at apt 8, 5th story, 1st apartment from east at south

    Dec 19, 2004 · Apt 8

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from west at north wall in the 6th bathroom from east located at apt 8, 5th story, 1st apartment from east at south

    Dec 19, 2004 · Apt 8

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, south wall, north wall, ceiling in the 7th room from east located at apt 8, 5th story, 1st apartment from east at south

    Dec 19, 2004 · Apt 8

    Open — Nov sent out

DOB building violations · 9

  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 21, 2019

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 13, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 7, 2015

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection rpt

    Dec 13, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection rpt

    Dec 13, 2011

    Dob violation - dismissed

ECB violations · 18

  • Class - 2

    Failure to comply w/ the commissioners order to file a certificate of correction w/ the dob.noted:respondent failed to comply w/ the commissioners order to correct the violating condition & file a cert of corre

    Jul 23, 2010 · Penalty $800

    Resolve
  • Class - 1

    Work w/o a permit.work noted:@ ground flr 2 corridor passageways enclosed by sheetrock.remedy:stop all work.obtain permit or restore to prior legal conditions.

    Jul 6, 2010 · Penalty $1,600

    Resolve
  • Class - 1

    Sec. 1014.1 failure to comply with the required 2 exit access doorwaysfrom any space from a r-1 occupancy group building. note: from 2nd flr through 5th flr & penthouses exits primary transient occupancy arrang

    Apr 21, 2010 · Penalty $8,000

    Resolve
  • Class - 1

    Sec. 1008.4.3 illegally using double hung windows as exits & exit dischange in that approx 32 double hung windows are marked as exit with a photo luminescent "exit signs". remedy: remove exit signs from window

    Apr 21, 2010 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to provide unobstructed exit passageway note: at 1st flr entrance level exist furniture partially obstructing the exit door & fa system. remedy: remove furniture forthwith.

    Apr 21, 2010 · Penalty $1,200

    Resolve
  • Class - 1

    Occupancy contrary to that allowed by dept of bldg records. illegal occupancy noted: application # 104354994 (alt type 1) indicates a legal res. from 2nd - 6th flrs (ph) now illegally occupied as a primary tran

    Apr 21, 2010 · Penalty $12,000

    Resolve
  • Class - 2

    Work w/o permits. work noted at roof level 3 separate & independent penthouse duplexes each in conjunction with fifth flr dwelling units via internal staircase. (each) remedy: obtain permits.

    Apr 21, 2010 · Penalty $800

    Resolve
  • Class - 1

    Sec. bc 1014.1 failure to comply with the required 2 exit access doorways from any space from a r-1 occupancy group building. note: from 2nd- 5th flrs & penthouses exist primary transient occupancy arranged for

    Apr 21, 2010 · Penalty $8,000

    Resolve
  • Class - 1

    Sec. bc 508.3 failure to comply with the required separations of occupancies in a mixed use building. note: at 1st flr level exist an opening w/i a wall leading to the exit passageway through a cafe (use group

    Apr 21, 2010 · Penalty $1,600

    Resolve
  • Class - 1

    Sec. bc 1014.1 failure to comply with the required 2 exit access doorways from any space from a r-1 occupancy arranged for over 260 guest with 1 vertical stairway as an exit. remedy: discontinue illegal transie

    Apr 21, 2010 · Penalty $8,000

    Resolve
Show 8 more ↓
  • Class - 1

    1003.2.fail to comply w/means of egress exit access ceiling heights note:@ cellar level along exit access exist a ceiling height of approx 6' in height.remedy:obtain necessary approvals & permits to comply w/ce

    Apr 21, 2010 · Penalty $8,000

    Resolve
  • Class - 1

    1008.1.4.fail to comply w/exit door fl elevation note: @ 1st fl vertical exit passageway (stairway) exist an exit door w/a 2" lip (step up) creating a tripping hazard.remedy: comply w/exit door fl elevation for

    Apr 21, 2010 · Penalty $8,000

    Resolve
  • Class - 1

    Occupancy contrary to that allowed by dept of building record: noted according to h.p.d. records bldg #3403 1961 7th ave aka 159 w 118 st should be occupied as 5 class'a' apts a commercial 1st flr use. the bldg

    Mar 27, 2010 · Penalty $2,400

    Resolve
  • Class - 1

    Fail to comply w.comm order to correct viol 34816696k for work w.o permit thru out new interior renovation partitions plumbing/electrical/& roof deck. (job withdrawn after complete work) no record of correction

    Mar 19, 2010 · Penalty $12,000

    Resolve
  • Class - 1

    Altered/changed building occupied w/o a valid c of o as per 28-118.3.1& 28-118.3.2 noted: the following conditions: completely renovated building w/o construction permits on file. building operating as a hotel

    Oct 26, 2009 · Penalty $1,000

    Resolve
  • Class - 2

    Failure to comply with the commissioners order to file a certificate of correction with the dept of buildings noted: the following conditions: ecb violation #34686188l must comply with the issuance of a certifi

    Oct 26, 2009 · Penalty $400

    Resolve
  • Class - 2

    Work w.o permit. work noted: entire (5) story bldg renovated creating a hotel receptionist desk @ lobby, & a 20 seat cafe; a lounge w/game room(pool table,table tennis,foos ball table)@ cellar level a 20 perso

    Nov 20, 2008 · Penalty $800

    Resolve
  • Hazardous

    Supervision or use of rigging equipment w/o a special riggers license (men working on two point suspended scaffold) remedy: no remedy violation occupied at time of inspection.

    Aug 9, 2005 · Penalty $500

    Resolve

Complaints

  • Heat/hot water

    Apartment only

    Jan 24, 2026 · Apt 3B

    Close
  • Safety

    Window guard broken/missing

    May 24, 2023 · Apt 4A

    Close
  • Water leak

    Slow leak

    Feb 22, 2022 · Apt 4D

    Close
  • Paint/plaster

    Ceiling

    Feb 22, 2022 · Apt 4D

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jun 15, 2019 · Apt BLDG

    Close
  • Heating

    Heat related

    Dec 28, 2005 · Apt 8

    Close
  • Heating

    Heat related

    Dec 28, 2005 · Apt 5

    Close
  • Paint/plaster

    Wall

    Nov 12, 2005 · Apt 4

    Close
  • Electric

    Electric-supply

    Sep 1, 2005 · Apt 8

    Close
  • Electric

    Electric-supply

    Aug 18, 2005 · Apt 8

    Close
Show 40 more ↓
  • General

    Doors

    Aug 16, 2005 · Apt 5

    Close
  • Paint/plaster

    Wall

    Aug 16, 2005 · Apt 5

    Close
  • General

    Floor

    Aug 16, 2005 · Apt 5

    Close
  • General

    Windows

    Aug 16, 2005 · Apt 5

    Close
  • Electric

    Electric-supply

    Aug 16, 2005 · Apt 5

    Close
  • Electric

    Electric-supply

    Aug 12, 2005 · Apt 5

    Close
  • Paint/plaster

    Wall

    Aug 12, 2005 · Apt 7

    Close
  • Paint/plaster

    Wall

    Aug 12, 2005 · Apt 7

    Close
  • Electric

    Electric-supply

    Aug 12, 2005 · Apt 8

    Close
  • Electric

    Lighting

    Aug 12, 2005 · Apt 7

    Close
  • Electric

    Electric-supply

    Aug 11, 2005 · Apt 2

    Close
  • Electric

    Lighting

    Aug 11, 2005 · Apt 5

    Close
  • Electric

    Lighting

    Aug 10, 2005 · Apt 4

    Close
  • Paint/plaster

    Wall

    Apr 5, 2005 · Apt 5

    Close
  • Paint/plaster

    Wall

    Apr 5, 2005 · Apt 5

    Close
  • Paint/plaster

    Ceiling

    Apr 5, 2005 · Apt 5

    Close
  • Paint/plaster

    Ceiling

    Apr 5, 2005 · Apt 5

    Close
  • Paint/plaster

    Wall

    Apr 5, 2005 · Apt 5

    Close
  • Paint/plaster

    Ceiling

    Apr 5, 2005 · Apt 5

    Close
  • General

    Windows

    Apr 5, 2005 · Apt 5

    Close
  • General

    Windows

    Apr 5, 2005 · Apt 5

    Close
  • General

    Windows

    Apr 5, 2005 · Apt 5

    Close
  • General

    Floor

    Apr 5, 2005 · Apt 5

    Close
  • General

    Floor

    Apr 5, 2005 · Apt 5

    Close
  • Paint/plaster

    Ceiling

    Mar 20, 2005 · Apt 5

    Close
  • Paint/plaster

    Ceiling

    Mar 20, 2005 · Apt 5

    Close
  • Paint/plaster

    Wall

    Mar 20, 2005 · Apt 5

    Close
  • Paint/plaster

    Wall

    Mar 20, 2005 · Apt 5

    Close
  • General

    Windows

    Mar 20, 2005 · Apt 5

    Close
  • Paint/plaster

    Wall

    Mar 20, 2005 · Apt 5

    Close
  • General

    Floor

    Mar 20, 2005 · Apt 5

    Close
  • Paint/plaster

    Ceiling

    Mar 3, 2005 · Apt 5

    Close
  • Paint/plaster

    Wall

    Mar 3, 2005 · Apt 5

    Close
  • General

    Windows

    Mar 3, 2005 · Apt 5

    Close
  • Paint/plaster

    Wall

    Mar 3, 2005 · Apt 5

    Close
  • Paint/plaster

    Ceiling

    Dec 9, 2004 · Apt 8

    Close
  • Paint/plaster

    Ceiling

    Dec 9, 2004 · Apt 8

    Close
  • Paint/plaster

    Wall

    Dec 9, 2004 · Apt 8

    Close
  • Paint/plaster

    Wall

    Dec 9, 2004 · Apt 8

    Close
  • General

    Windows

    Dec 9, 2004 · Apt 8

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Condominium (RM)
Year built
1900
Floors
5
Residential units
35
Building area
43,399 ft²
Lot area
10,092 ft²
Zoning
R7-2
Community board
110
Council district
9
Block / lot
1903 / 7503
Assessed value
$3,927,155
Landmark / historic district
No

HPD registration #127646, last renewed Sep 23, 2025.

Questions about 1967 Adam C Powell Blvd

Who owns 1967 Adam C Powell Blvd?

The owner of record in NYC Department of City Planning PLUTO data is Unavailable Owner.

Does 1967 Adam C Powell Blvd have violations?

Yes. NYC HPD has recorded 80 housing violations at this property.

Is 1967 Adam C Powell Blvd rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1967 Adam C Powell Blvd built?

City records list 1900 as the year it was built.

How many apartments are in 1967 Adam C Powell Blvd?

It has 35 residential units and 41 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.