100 West 119 Street is a condominium built in 1900 in Manhattan, 10026. It has 25 residential units across 7 floors. The owner of record is Normandie Condominium. HPD has recorded 6 housing violations here, most recently on August 16, 2026. 5 of the 6 most recent violations are still open.
- HPD violations
- 6
- DOB violations
- 24
- ECB violations
- 15
- HPD complaints
- 14
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 6
- ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Aug 16, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Aug 16, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story
Aug 16, 2026
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Aug 16, 2026
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Aug 16, 2026
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 9, 2018
Closed — Violation dismissed
DOB building violations · 24
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Plumbing none
The borough commissioner intends to revoke all plumbing approvals and permit issued under job # m00349294 due to inactive of license master plumber # 1632. stop all plumbing work under above mentioned permit immediately
Nov 17, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 21, 2019
Dob violation - resolved - Landmark none
Landmk-landmark none
Nov 4, 2019
Dob violation - active - Landmark none
Landmk-landmark none
Nov 4, 2019
Dob violation - active - Landmark none
Landmk-landmark none
Nov 4, 2019
Dob violation - dismissed - Landmark none
Landmk-landmark none
Nov 4, 2019
Dob violation - active
Show 14 more ↓
- Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 28, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 3, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 22, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 28, 2013
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 19, 2013
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Feb 11, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 6, 2012
Dob violation - resolved - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 4, 2009
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 28, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 10, 2006
Dob violation - resolved - Boiler boiler optional
B-boiler boiler optional
Dec 27, 1988
Dob violation - dismissed
ECB violations · 15
- Class - 2
Failure to file acceptable amended cycle 9c report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #906673. remedy: file acceptable report.
Apr 20, 2026 · Penalty $1,250
Active - Class - 2
Failure to maintain exterior building facade and appurtenances.noted at time of inspection 1) south west corner of parapet corner of exp 1 & exp 4 cracked masonry stucco at parapet 2) roof level cracked masonry
Dec 19, 2023
Resolve - Class - 2
Removal of sidewalk sheds or other protective measures w/o dept's approval. remedy: obtain approval from dob for sidewalk sheds etc removal as per 1rcny 103-04.
Apr 28, 2014
Resolve - Class - 1
No record of daily inspection of suspended scaffold performed by authorized person at site. noted: upon inspection when asked foreman did not have any daily inspection logs to present for inspection.
Sep 13, 2013 · Penalty $2,400
Resolve - Class - 1
*failure to take and provide safety measures (sidewalk shed,etc) whererequired to protect and secure public safety from unsafe facade as per1rcny 103-04. *facade technical report file unsfe by pe/ra on 2/11/201
Mar 28, 2013 · Penalty $2,400
Resolve - Hazardous
Plumbing work w/o a permit. upon physical inspection found gas lines in the base feeding to various locations installed off gas meters. remedy: obtain a permit if feasible or restore to prior legal condition.
Jan 22, 2008
Resolve - Hazardous
Failure to maintain plumbing and/or appurtenaces.upon physical inspection ( )plumbing,pvc piping outside bldg.at front door entrance no pvc piping in commercial bldg rs-16.remedy:maintain plumbing and/or
Jan 22, 2008 · Penalty $800
Active - Non-hazardous
Failure to submit a fifth round techinical report in compliance with code provisions:periodic inspection of exterior walls and department ofbuildings rules and regulations.remedy:file the required report to t
Jul 22, 2005 · Penalty $10,000
Resolve - Non-hazardous
Failure to submit a 5th round technical report in compliance with code provisions:periodic inspection of exterior walls & appurtenances as required by local law 11 of 1998 & the department of buildings rules &
Feb 25, 2005 · Penalty $700
Resolve - Hazardous
Failure to safeguard public/property affected by construction operations noted: 1) at various location on 1st floor openings in slab (floor)with no protective guard rails or protective floor coverings to
Dec 10, 2004 · Penalty $1,000
Resolve
Show 5 more ↓
- Hazardous
Failure to maintain adequate housekeeping noted: constr. work under appl. #103694977-01 1st floor with unprotected openings in floor slab has debri and construction materials throughout floor creating trip
Dec 10, 2004 · Penalty $500
Resolve - Non-hazardous
Failure to submit a fifth round technical report:periodic inspection of exterior walls and appurtenances as required by local law 11 of 1998 and the department of buildings rules and regulations.remedy:file the
Jul 9, 2004 · Penalty $700
Resolve - Hazardous
Failure to submit a third round technical report periodic inspection of exterior walls and appuntenances as required by local laws 10 of 1980 and the department of buildings rules and regulations remedy file th
May 23, 1996 · Penalty $400
Resolve - Non-hazardous
Work without a permit wwork noted mnew partition and ceiling creating two store out of one store location street level violation 0821189cd4tr01 is a stop work order all work is completed order all work is compl
Sep 6, 1995 · Penalty $1,000
Resolve - Unknown
Failure tofile annual boiler report with thisw department for boiler #46175-01 remedy file report or have an inspection performed by this department
Dec 27, 1988 · Penalty $500
Resolve
Complaints
- Safety
Window guard broken/missing
Jul 30, 2026 · Apt BLDG
Close - General
Locks
Jul 16, 2013 · Apt 3B
Close - Paint/plaster
Wall
Jul 24, 2008 · Apt 4N
Close - Plumbing
Water supply
Jul 24, 2008 · Apt 4N
Close - Nonconst
Vermin
Jul 24, 2008 · Apt 4N
Close - Nonconst
Vermin
Jul 24, 2008 · Apt 4N
Close - Nonconst
Vermin
Jul 24, 2008 · Apt 4N
Close - Electric
Wiring
Jul 24, 2008 · Apt 4N
Close - Plumbing
Basin/sink
Jul 24, 2008 · Apt 4N
Close - General
Floor
Jul 24, 2008 · Apt 4N
Close
Show 4 more ↓
- Plumbing
Bathtub/shower
Jul 24, 2008 · Apt 4N
Close - Plumbing
Radiator
Jul 24, 2008 · Apt 4N
Close - Heating
Heat related
Dec 31, 2007 · Apt 2A
Close - Heating
Heat related
Jan 2, 2007 · Apt 2A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RM)
- Year built
- 1900
- Floors
- 7
- Residential units
- 25
- Building area
- 39,080 ft²
- Lot area
- 7,569 ft²
- Zoning
- R7-2
- Community board
- 110
- Council district
- 9
- Block / lot
- 1903 / 7501
- Assessed value
- $3,614,711
- Landmark / historic district
- Mount Morris Park Historic District Extension
HPD registration #126140, last renewed Jul 1, 2026.
Questions about 100 West 119 Street
Who owns 100 West 119 Street?
The owner of record in NYC Department of City Planning PLUTO data is Normandie Condominium.
Does 100 West 119 Street have violations?
Yes. NYC HPD has recorded 6 housing violations at this property.
Is 100 West 119 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 100 West 119 Street built?
City records list 1900 as the year it was built.
How many apartments are in 100 West 119 Street?
It has 25 residential units and 31 units in total.