1080 Amsterdam Avenue
Manhattan, NY 10025BBL 1-01885-0029Map
Owner of record: 1080 Amsterdam LLC
1080 Amsterdam Avenue is an elevator apartment building built in 1932 in Manhattan, 10025. It has 96 residential units across 20 floors. The owner of record is 1080 Amsterdam LLC. HPD has recorded 13 housing violations here, most recently on October 7, 2026. 10 of the 13 most recent violations are still open.
- HPD violations
- 13
- DOB violations
- 70
- ECB violations
- 22
- HPD complaints
- 30
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 13
- BHazardous
Refit the lower sash window at east wall in the kitchen located at apt 1005, 10th story, 1st apartment from east at south
Oct 7, 2026 · Apt 1005
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective exterior glass pane at lower sash window in the 4th room from north located at apt 1005, 10th story, 1st apartment from east at south
Oct 7, 2026 · Apt 1005
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 6, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 305, 3rd story, 1st apartment from east at south
Jul 13, 2026 · Apt 305
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations inoperable in the entire apartment located at apt 305, 3rd story, 1st apartment from east at south
Jul 13, 2026 · Apt 305
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules inoperable in the entire apartment located at apt 305, 3rd story, 1st apartment from east at south
Jul 13, 2026 · Apt 305
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st closet from south at west wall door frame in the 1st room from north at east located at apt 305, 3rd story, 1st apartment from east at south
Jul 13, 2026 · Apt 305
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from west at north wall in the foyer located at apt 305, 3rd story, 1st apartment from east at south
Jul 13, 2026 · Apt 305
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from east at south wall in the bathroom located at apt 305, 3rd story, 1st apartment from east at south
Jul 13, 2026 · Apt 305
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway located at apt 305, 3rd story, 1st apartment from east at south
Jul 13, 2026 · Apt 305
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Open — Nov sent out
Show 3 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at exit fire door ''stairs a'' at public hall, 1st story
Jan 19, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hydraulic arm at hopper chute door at public hall, 2nd story
Jan 19, 2025
Closed — Violation closed - BHazardous
Remove the illegal fastening padlock on gate west fire passageway at street.
Dec 10, 1998
Closed — Violation dismissed
DOB building violations · 70
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Hazardous condition (facade) facade required
Cycle 9a unsafe report filed
Oct 7, 2021
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 17, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 17, 2018
Dob violation - resolved
Show 40 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 10, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 10, 2014
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2013 inspection/test
Oct 31, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2013 inspection/test
Oct 31, 2014
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 3, 2013
Dob violation - dismissed - Facade facade optional
Unsafe report filed
Feb 17, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 1, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 1, 2011
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 3, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 2, 2006
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 13, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 13, 2005
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Construction other optional
C-construction other optional
Nov 10, 2004
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 9, 2004
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Feb 19, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed
ECB violations · 22
- Class - 2
Failure to file acceptable amended cycle 9a report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #906541. remedy: file acceptable report.
Jan 16, 2024 · Penalty $6,250
Active - Class - 2
As per one federal fst-90 boiler in cellar. boiler is not registered; register boiler. correct violating conditions, call for an inspection.
Jun 23, 2021
Resolve - Class - 2
Erect 3 attached wrap around fabric signs as outlined w/out permit: from bottom up. (1)2ft high x (20ft along w 113 st & 16 ft along amsterdam ave: inscription "1080 amsterdam by stonehenge" along w 113 st & 64
Aug 25, 2017 · Penalty $400
Resolve - Class - 1
Bc3307.3 failure to provide overhead protection alleyway as per site safety plan. at time of inspection observed c-hook installed at west elevation balcony walls,and at penthouse level parapet caping and rail
Sep 26, 2014 · Penalty $1,600
Resolve - Class - 1
Failure to have site safety manager present.noticed @ time of insp.facade work in progress no site safety manager on site.job in site safetyprogram.no ccd1 in system for reduced ssm.forman on site stated no ssm
Sep 8, 2014 · Penalty $1,200
Resolve - Class - 2
3310.3,failure to have approved site safety plan on site.noticed @ time of insp facade work in progress.no approved site safety plan on site.rem:stop all facade work & provide ssp as per code.
Sep 8, 2014
Resolve - Class - 2
Failure to maintain adeqauate have keeping.noticed @ time of insp facade work in progress.noticed excessive garbage & debri @ roof level in egress & ingress paths.rem:maintaini adeqauate house keeping as per co
Sep 8, 2014
Resolve - Class - 2
17h11.17d6.39x10.53b14.77q3.17h.d replace securee where needed 41e sdjust door 39x.q light 29q door box 53b shorten 77q lights
Feb 8, 2010 · Penalty $500
Resolve - Class - 2
17h11.17d06.56y13.32h11.34o2.76o2.53b14.52o2.39h11.17h.d. replace secure where needed 56 seal leaks 44h worn traction sheave 68m maint.log 32h worn car shoes 34o clean all build-up 77o build-up 76-0 clean for
Apr 29, 2009 · Penalty $500
Resolve - Class - 2
17h11.17d06.01b10.58h11.34o2.77o2.32h11.53b14.78h11.17h replace secure where needed 01.02b muted bell 58 wear inbearings 56y seal leaks 34.77o clean all build-up 52o clean for proper inspection 32m worn car sho
Apr 29, 2009 · Penalty $250
Resolve
Show 12 more ↓
- Non-hazardous
Failure to submit a fifth round technical report: periodic inspection of exterior walls and appurtenances as required by local law of 11 of 1998 and the department of buildings rules and regulations. remedy: fi
Oct 22, 2003
Resolve - Non-hazardous
Failure to submit a fifth round technical report:periodic inspection of exterior walls and appurtenances as required by local law of 1998 and the department of building rules and regulations.remedy:file the
Apr 18, 2003
Resolve - Non-hazardous
9h12-15l11-16h12-22l6-23u16-58o2-59o2. 15-l-11 not self closing bsmt floor 16-h-12 5,7,8 & 14 floors. 22-l-6 secure to code.
Jul 24, 2002 · Penalty $180
Resolve - Non-hazardous
5j11-9h12-16h12-58o2-59o2. 5-j-11 too much gap between car door & car post 16-h-12 1,5,6,7 & 10 floors.
Jul 24, 2002 · Penalty $180
Resolve - Non-hazardous
29i,39h,46h,50y,73o. 29i- spring shuckles
Jan 23, 1996 · Penalty $250
Resolve - Non-hazardous
15m,16h,25l,31r,37m,73o,75t. 15m side-guard at lobby. 16h lobby. 31r exposed on car top(romex)and wiring on back of shaftway. 37m tail contact on su relay. 73o car top and rails.
Apr 3, 1995 · Penalty $100
Resolve - Non-hazardous
02l,22d,28l,29i,31m,39h,46n,50y,73o,75t. 02l imourdible. 28l top set. 29i spring(shuckle) 31m covers.
Apr 3, 1995 · Penalty $100
Resolve - Hazardous
Failure to file an amended reprot acceptable tothis department pursuant to rule rcny 32-03b5 indicating correction of hazardus conditions described in initial ll 10/80 report remedy file an amended report
Apr 28, 1994 · Penalty $400
Resolve - Hazardous
Failure to file an amended report acceptable to this department pursuant to rule r.c.n.y. 32-03b(5) indicating correction of hazardous conditions described in initial ll10/80 report. remedy: file an amended rep
Dec 9, 1993 · Penalty $400
Resolve - Hazardous
Failure to file an amended report acceptable to this dpet. pursuant to rule r.c.n.y 32-03b(5) indicating correction of hazardous conditiondescribed in initial ll10/80 report. remedy:file an amended report
Oct 1, 1993 · Penalty $400
Resolve - Hazardous
Failure to file an amended report acceptable to this dept. pursuant torule r.c.n.y 32-03b(5) indicating correction of hazardous conditions described in intialll10/80. remedy:file an amended report following
Oct 30, 1992
Resolve - Non-hazardous
Work without permit: at time of inspection a side walk shed approx 130' on w 113th street, 90' on amsterdam ave was erected in front of 501 west 113th st & on side of said addresss on amsterdam ave. a search of
Sep 18, 1991 · Penalty $1,000
Resolve
Complaints
- Unsanitary condition
Pests
Oct 2, 2026 · Apt 905
Close - Appliance
Electric/gas range
Sep 28, 2026 · Apt 1005
Close - Door/window
Window frame
Sep 28, 2026 · Apt 1005
Close - Door/window
Window frame
Sep 28, 2026 · Apt 1005
Close - Unsanitary condition
Pests
Sep 25, 2026 · Apt 1002
Open - Appliance
Electric/gas range
Sep 22, 2026 · Apt 1080AM
Close - Electric
Outlet/switch
Sep 22, 2026 · Apt 1080AM
Close - Water leak
Slow leak
Sep 18, 2026 · Apt 406
Open - Electric
Outlet/switch
Sep 18, 2026 · Apt 406
Open - Appliance
Refrigerator
Jul 7, 2026 · Apt 305
Close
Show 20 more ↓
- Flooring/stairs
Floor
Jul 7, 2026 · Apt 305
Close - Electric
Wiring
Jul 7, 2026 · Apt 305
Close - Plumbing
Bathtub/shower
Jul 7, 2026 · Apt 305
Close - Unsanitary condition
Pests
Jul 7, 2026 · Apt 305
Close - Unsanitary condition
Pests
Jul 7, 2026 · Apt 305
Close - Appliance
Electric/gas range
Jul 7, 2026 · Apt 305
Close - Appliance
Electric/gas range
Jul 7, 2026 · Apt 305
Close - Door/window
Window frame
Jul 7, 2026 · Apt 305
Close - Unsanitary condition
Mold
Jul 7, 2026 · Apt 305
Close - Heat/hot water
Apartment only
Mar 2, 2026 · Apt 906
Close - Heat/hot water
Apartment only
Feb 27, 2026 · Apt 906
Close - Heat/hot water
Apartment only
Feb 26, 2026 · Apt 906
Close - Heat/hot water
Apartment only
Feb 23, 2026 · Apt 906
Close - Plumbing
Steam pipe/riser
Jan 18, 2025 · Apt 202
Close - Heat/hot water
Entire building
May 5, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 12, 2023 · Apt BLDG
Close - Electric
No lighting
Jul 12, 2023 · Apt 102
Close - Safety
Fire escape
Jul 12, 2023 · Apt 102
Close - Electric
Lighting
Jan 12, 2021 · Apt 6B
Close - Heat/hot water
Apartment only
Nov 12, 2019 · Apt 505
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 1932
- Floors
- 20
- Residential units
- 96
- Building area
- 89,365 ft²
- Lot area
- 5,092 ft²
- Zoning
- R8
- Community board
- 109
- Council district
- 7
- Block / lot
- 1885 / 29
- Assessed value
- $11,481,300
- Landmark / historic district
- No
HPD registration #116378, last renewed Oct 15, 2025.
Questions about 1080 Amsterdam Avenue
Who owns 1080 Amsterdam Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 1080 Amsterdam LLC.
Does 1080 Amsterdam Avenue have violations?
Yes. NYC HPD has recorded 13 housing violations at this property.
Is 1080 Amsterdam Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1080 Amsterdam Avenue built?
City records list 1932 as the year it was built.
How many apartments are in 1080 Amsterdam Avenue?
It has 96 residential units and 98 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.