209 West 96 Street
Manhattan, NY 10025BBL 1-01868-0024Map
Owner of record: Mway Management LLC
209 West 96 Street is a store building built in 1900 in Manhattan, 10025. The owner of record is Mway Management LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 51
- ECB violations
- 17
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 51
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Construction other optional
Failure to maintain bldg code compliant. construction on the inter of bldg at exp1. new block work installed. exp#1 damage weathered mortar joints/lintels. exp#2 damage coroded meltal in stair case at 3rd floor seem loose. roof lev missing/not completed parapet wall on roof remedy: repair/replace
May 3, 2024
Dob violation - dismissed - Construction other optional
Failure to maintain building in code compliant manner.damaged/corrode mortar joints in multiple locations on exposure and 2(south and west elevation)rusted window lintels in multiple locations on exposure 1 south elevation.also corroded metal at parapet level on exposure 2 west elevation.remedy:fix and or replace
Jan 5, 2024
Dob violation - dismissed - Construction other optional
Failure to maintain building in code compliant manner.observed on expo exposure#1 south elevation dmaged mortar joints at several location corroded damaged metal window lintels at multiple location.exposure#2 west elevation:corroded metal at parapet.remedy:maintain building in code compliant manner repair and or replace damage facade
Sep 14, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed
Show 40 more ↓
- Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Construction other optional
Failure to maintainexterior building facade and appurtenances.spalled brickwork in multiple locations,step crack,broken/damaged window sill, and deteriorated mortar joints.remedy:exterior building facade and ap appurtenances repair/replace damaged facade provide adequate safety measures
Feb 14, 2023
Dob violation - dismissed - Construction other optional
Emergency work order due to broken window pane, spalled/missing concrete window sills. remedy: immed take and provide safety measures to secure and protect the public by installing public protection at exp1 make immed repairs under supervision of lic prof. also remove/ secure any loose materials
Nov 21, 2022
Dob violation - dismissed - Construction other optional
Ftm bldg in code compliant manner. observed broken window pane to second floor window, spalled brickwork in multiple locations, broken/ missing/damaged window sill at second and third floors and rotten/ dmaged wooden door frame and heaser on the 1fl. all defects mentioned are at exp1 south elev. remedy: repair and replace
Nov 21, 2022
Dob violation - dismissed - Construction other optional
Failure to maintain building in code compliant manner. at time of inspection observed damaged metal cornice in 4fl lelvel at exp1 also observed damaged mortar joint at multiple locations. remedy: repair and/or replace
Jun 2, 2022
Dob violation - dismissed - Construction other optional
Ftm building facade and appurtenances. at south elevation, exp 1 observed damaged facade cornice and spalled coping at parapet wall remedy: maintain building facade. provide safety measures, repair damaged facade, make facade safe
Jun 9, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 26, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 29, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 8, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 13, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 1, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 13, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 14, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 27, 2009
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 19, 2007
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 28, 2006
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 11, 2005
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 8, 2004
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 8, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Elevator elevatorrequired
1p36907
May 23, 2000
Dob violation - resolved - Elevator elevatorrequired
1p33812
May 23, 2000
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed - Construction other optional
C-construction other optional
Feb 20, 1990
Vp-violation unserved ecb-active - Construction other optional
C-construction other optional
Feb 20, 1990
Vp-violation unserved ecb-active - Construction other optional
C-construction other optional
Feb 20, 1990
Dob violation - dismissed
ECB violations · 17
- Class - 2
Failure to file required annual boiler inspection reports for low-pressure boiler 10000099005n0001 in accordance with the rules of the department. 1rcny 103-01(d)(1) requires that an annual inspection report fo
Jul 1, 2025 · Penalty $3,125
Active - Class - 2
Failure to file required annual boiler inspection reports for low-pressure boiler 10000829376n0002 in accordance with the rules of the department. 1rcny 103-01(d)(1) requires that an annual inspection report fo
Jul 1, 2025 · Penalty $3,125
Active - Class - 1
Unlawful acts. failure to comply with commissioner's order. violation #35664573r dated 11/29/2022 states: failure to comply with commissioner's order failure to comply with emergency work order(112122sr0702ap)
Jan 5, 2024 · Penalty $6,250
Resolve - Class - 2
Temporary construction equipment installation onsite expired permit.observed no valid sidewalk shed permit.previous permit#140461140-01-eq-sh expired on 06/06/2023.as of today 01/05/2024 no valid permit posted.
Jan 5, 2024 · Penalty $625
Resolve - Class - 2
Tem. construction equipment installation on site has a expired permit . at time of inspection i observed the permit for sidewalk shed were expired. at the place of occurance an active permit for temporary const
Sep 14, 2023 · Penalty $3,125
Resolve - Class - 1
Failure to comply w/commissioner's order.failure to comply w/emergencywork order (112122sr0702ap) due to hazardous conditions including broken windowpane,spalled/missing concrete windowsills,broken stonework.co
Nov 29, 2022 · Penalty $6,250
Resolve - Class - 2
Temp cost equipment onsite-expired permit.atoi observed sidewalkshed in place@exp1 w/expired permit.no record w/dob.renew permit
Jun 2, 2022 · Penalty $3,125
Resolve - Class - 2
Found weil mclain model cga 6 serial # cp7794069 boiler unregistered, flue pipe incorrectly supported correct all violating conditions, register the boiler and submit a certificate of correction.
Jan 15, 2021 · Penalty $3,125
Active - Class - 2
Found weil mclain model cga 7 serial# cp5009187 boiler unregistered, correct all violating conditions, register the boiler and submit a certificate of correction.
Jan 15, 2021 · Penalty $3,125
Active - Class - 2
Failure to maintain building in code complaint manner. noted, at time of inspection i observed disrepair, damaged, sagging and falling a parts of metal cornice in 4th floor level at expo # 01. also observed loo
Nov 25, 2019 · Penalty $625
Resolve
Show 7 more ↓
- Class - 2
Temporary construction equipment on site - expired permit. sidewalk shed. noted, at the time of inspection, i observed a sidewalk shed erected which coving entire front facade with expire permit. permit # 14046
Nov 25, 2019
Resolve - Class - 2
Failure to maintain bldg wall(s) or appurtenances.noted:@roof level(copaice)above 3 fl window @east side of bldg has section broken & open to elements approx 4 linear ft appear also to sag.rem:maintain exterior
Jan 8, 2016 · Penalty $500
Active - Class - 3
Work does not conform to approved construction documents and/or approved amendments.note the front section of rood near elevator shaft is enclosed with rigid plastic sheets and using as a storage which is contr
Oct 5, 2014
Resolve - Class - 2
Altered/changed bldg occupied w/o a valid certificate of occupancy.@ time of insp.entire bldg is occupied prior to sign off application #101269878 or without obtaining certificate of occupancy.rem:obtained vali
Oct 5, 2014 · Penalty $2,500
Active - Class - 2
56y13,40z10,10h11,17h11,19m07,100d06,09k10,70z09,68m07,69m07. 56y- repair & seal glow (packing). 40z- repair roof. 17h- replace hoistway door gibs on all flrs. 19m-provide bottom safety retainer on all hoistway
Sep 7, 2011
Resolve - Non-hazardous
46h,37r,22d,11d,57o, 46-replace hoist cable 37-remove wire jumper from fuse no. 5-22 proper by secure emergency hatch 11-secure loose lamps 57-clean (pit)
Dec 2, 1997 · Penalty $2,500
Resolve - Hazardous
Exit passageway total obstruction door os lock and block location 2 and 3 floor to street level remedy unlock door and remove obstruction
Jan 6, 1997 · Penalty $475
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Store building (K4)
- Year built
- 1900
- Floors
- 3
- Residential units
- —
- Building area
- 8,690 ft²
- Lot area
- 3,213 ft²
- Zoning
- R9
- Community board
- 107
- Council district
- 7
- Block / lot
- 1868 / 24
- Assessed value
- $2,362,050
- Landmark / historic district
- No
Questions about 209 West 96 Street
Who owns 209 West 96 Street?
The owner of record in NYC Department of City Planning PLUTO data is Mway Management LLC.
Does 209 West 96 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 209 West 96 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 209 West 96 Street built?
City records list 1900 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.