9 West 100 Street is a garage / gas station built in 1920 in Manhattan, 10025. The owner of record is West 100th Street Garage LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 27
- ECB violations
- 11
- HPD complaints
- 1
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 27
- Construction other optional
Observed vertical cracks, missing, cracked and damaged bricks in danger of collapse into adjacent property rear yard at exp.4 (right side of building). also observed missing/spalling mortar joints at multiple locations of exp.2.
Mar 26, 2025
Dob violation - dismissed - Immediate emergency anythingoptional
Provide approximately 60 linear feet of sidewalk shed (sws) as follows at exposure 4,erect 60 linear feet of sws to provide overhead protecti on for the rear yard of the adj property located @ 407 central park west, the shed must fully cover the rear yard area of 407 cnterl park west
Mar 26, 2025
Dob violation - active - Construction other optional
Emergency work order due to the unsafe conditions cracked spalled masonry facade and the immed.hazard posed on south elevation expo#1 to pedestrian and vehicular traffic.remedy:owner must immediately install side walk shed on west 100th to secure& protect public safety comply with code
May 9, 2023
Dob violation - active - Construction other optional
Structure rendered non-compliant. at time of inspection observed expo#2 defects on masonry missing cement cladding, multiple cracks. at interior stairwells step multiple vertical cracks, 2nd, 3rd fl. concrete slabs with surface deterioration. cellar slab shows severe signs of wear with rain water retention furthering deterioration.
May 5, 2023
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 6, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 13, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 6, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 24, 2011
Dob violation - resolved
Show 17 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Apr 1, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 28, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 11, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 3, 2004
Dob violation - resolved - Elevator elevatorrequired
1f4750
Dec 3, 2002
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Elevator elevatorrequired
1p28376
Mar 29, 1999
Dob violation - resolved - Elevator elevatorrequired
1f4750
Mar 29, 1999
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 1, 1994
Dob violation - dismissed - Elevator elevatoroptional
1
Jun 29, 1990
Dob violation - dismissed - Elevator elevatoroptional
1
Oct 12, 1989
Dob violation - dismissed
ECB violations · 11
- Class - 1
Failure to maintain building in code-compliant manner: noted: exit doors at 1st floor and 3rd floors are locked/inoperable. 3rd floor door has 2 metal latches and 1st floor door has lock and wires keeping it sh
Aug 13, 2025 · Penalty $2,500
Resolve - Class - 1
At time of inspection observed vertical cracks, missing, cracked and damaged bricks in danger of collapse into adjacent property rear yard at exp.4 (right side of building). also observed missing/spalling morta
Mar 26, 2025 · Penalty $2,530
Resolve - Class - 1
Failure to maintain. at time of inspection exit door's locked, inoperable along with metal exit stair with severe corrosion compromising egress at cellar, 2nd, 3rd fl. defects observed on interior & exterior of
May 5, 2023 · Penalty $1,250
Resolve - Class - 2
Work w/o a permit-at 3rd stroy south elevation (exp1) installed flash ing illuminated accessory business sign "rapid park" with 3 flashing directional arrows at apprx 1 second intervals.sign apprx 8'wide x 5'
Dec 17, 2014 · Penalty $400
Resolve - Non-hazardous
Work w/o a permit. work noted: the demolition of approx. 30 s.f. of brick parapet wall and the construction of approx. 120 s.f of new parapet wall made of bricks and blocks. noted location: at roof level on the
Dec 13, 2005 · Penalty $250
Resolve - Non-hazardous
Use of illegal hardware at exit/stairway with a sliding dead bolt lock located on 3rd floor level. remedy: remove illegal hadware.
Oct 29, 2005
Resolve - Non-hazardous
Failure to maintain exterior building wall in that the west exterior biuilding wall is defective.bricks missing from 2nf floor approx 6'x6' debris at side yard below.remedy:repair brick wall at 2nd floor as ind
Oct 28, 2000 · Penalty $350
Resolve - Non-hazardous
15i,57o,61k,08i,37u,54u,50u,53b,02x,
Nov 25, 1997
Resolve - Non-hazardous
18q, 30#, 20m, 3m, 31r, 37#, 33r. 30- taper lege 3 annunciation 31 going hoistway to moton 37 install new controller without permit: remedy:file for and have test by this dept. 33 wood fon roof and file for rem
Oct 20, 1995
Resolve - Non-hazardous
18l,15l.15-secure hatchway doors close.
Apr 25, 1995
Resolve
Show 1 more ↓
- Non-hazardous
15l,15i. 15 make all doors to function properly.
Sep 21, 1993
Resolve
Complaints
- Heat/hot water
Entire building
Jan 22, 2019 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Garage / gas station (G1)
- Year built
- 1920
- Floors
- 3
- Residential units
- —
- Building area
- 16,488 ft²
- Lot area
- 5,046 ft²
- Zoning
- R8B
- Community board
- 107
- Council district
- 7
- Block / lot
- 1836 / 27
- Assessed value
- $1,053,000
- Landmark / historic district
- No
Questions about 9 West 100 Street
Who owns 9 West 100 Street?
The owner of record in NYC Department of City Planning PLUTO data is West 100th Street Garage LLC.
Does 9 West 100 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 9 West 100 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 9 West 100 Street built?
City records list 1920 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.