1864 Adam C Powell Blvd
Manhattan, NY 10026BBL 1-01829-0029Map
Owner of record: Fordham, James
1864 Adam C Powell Blvd is an elevator apartment building built in 1920 in Manhattan, 10026. It has 35 residential units across 7 floors. The owner of record is Fordham, James. HPD has recorded 345 housing violations here, most recently on April 29, 2026. 34 of the 50 most recent violations are still open.
- HPD violations
- 345
- DOB violations
- 25
- ECB violations
- 23
- HPD complaints
- 165
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 345
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 24, 2nd story, 1st apartment from west at north
Feb 27, 2026 · Apt 24
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 24, 2nd story, 1st apartment from west at north
Feb 27, 2026 · Apt 24
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 24, 2nd story, 1st apartment from east at south
Feb 26, 2026 · Apt 24
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
Feb 26, 2026
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 24, 2nd story, 1st apartment from east at south
Feb 26, 2026 · Apt 24
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Jan 19, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Jan 19, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1, 1st story, 1st apartment from west at north
Jan 19, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the bathroom located at apt 1, 1st story, 1st apartment from west at north
Jan 19, 2026 · Apt 1
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly repair or replace the broken or defective radiator shut off valve handle at east wall in the 1st room from east located at apt 1, 1st story, 1st apartment from west at north
Jan 19, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 35, 3rd story, 1st apartment from east at south
Dec 24, 2025 · Apt 35
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 23, 2nd story, 2nd apartment from west at north
Dec 24, 2025 · Apt 23
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 35, 3rd story, 1st apartment from east at south
Dec 24, 2025 · Apt 35
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 35, 3rd story, 1st apartment from east at south
Dec 24, 2025 · Apt 35
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door lock at boiler room
Dec 24, 2025
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system ...door locked at boiler room, 1st story
Oct 18, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 23, 2nd story, 2nd apartment from west at north , section ''south''
Oct 18, 2025 · Apt 23
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 23, 2nd story, 1st apartment from west at north
Dec 16, 2024 · Apt 23
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 1, 1st story, 1st apartment from west at north , 1st section from west at north
Nov 21, 2023 · Apt 1
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 63, 6th story, 1st apartment from west at north , 1st section from east at south
Nov 21, 2023 · Apt 63
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 54, 5th story, 1st apartment from east at south , 1st section from east at south
Nov 21, 2023 · Apt 54
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 53, 5th story, 1st apartment from west at north , 1st section from east at south
Nov 21, 2023 · Apt 53
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 52, 5th story, 1st apartment from south at west , 1st section from east at south
Nov 21, 2023 · Apt 52
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 43, 4th story, 1st apartment from west at north , 1st section from east at south
Nov 21, 2023 · Apt 43
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 5, 1st story, 2nd apartment from east at south , 1st section from east at south
Nov 21, 2023 · Apt 5
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant materials at ceiling at public hall, 1st story
Oct 30, 2023
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the bathroom located at apt 33, 3rd story, 1st apartment from west at north , section ''south''
Oct 30, 2023 · Apt 33
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story
Oct 30, 2023
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and east wall in the bathroom located at apt 33, 3rd story, 1st apartment from west at north , section ''south''
Oct 30, 2023 · Apt 33
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story
Oct 30, 2023
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 33, 3rd story, 1st apartment from west at north , section ''south''
Oct 30, 2023 · Apt 33
Closed — Violation dismissed - CImmediately hazardous
Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.
Sep 14, 2023
Open — Nov sent out - CImmediately hazardous
Correct failure to notify occupants and/or to investigate lead-based paint hazards.
Sep 14, 2023
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 7th room from north located at apt 22, 2nd story, 1st apartment from south at west
Jun 9, 2023 · Apt 22
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st door from north at east wall in the foyer located at apt 22, 2nd story, 1st apartment from south at west
Jun 9, 2023 · Apt 22
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at baseboard at west wall in the 7th room from north located at apt 22, 2nd story, 1st apartment from south at west
Jun 9, 2023 · Apt 22
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 7th room from north located at apt 22, 2nd story, 1st apartment from south at west
Jun 9, 2023 · Apt 22
Open — Nov sent out - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate ... in the 3rd room from north located at apt 22, 2nd story, 1st apartment from south at west
Jun 9, 2023 · Apt 22
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 22, 2nd story, 1st apartment from south at west
Jun 9, 2023 · Apt 22
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall in the 8th room from north located at apt 22, 2nd story, 1st apartment from south at west
Jun 9, 2023 · Apt 22
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the 7th room from north located at apt 22, 2nd story, 1st apartment from south at west
Jun 9, 2023 · Apt 22
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall, 1st door frame from east at south wall, 1st door frame from north at east wall in the 6th room from north located at apt 22, 2nd story, 1st apartment from south at west
Jun 9, 2023 · Apt 22
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, north wall in the 4th room from north located at apt 22, 2nd story, 1st apartment from south at west
Jun 9, 2023 · Apt 22
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, baseboard at west wall, 1st door frame from north at east wall in the foyer located at apt 22, 2nd story, 1st apartment from south at west
Jun 9, 2023 · Apt 22
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the private hallway located at apt 22, 2nd story, 1st apartment from south at west
Jun 9, 2023 · Apt 22
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st wall cabinet from west at north wall in the kitchen located at apt 22, 2nd story, 1st apartment from south at west
Jun 9, 2023 · Apt 22
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the bathroom located at apt 22, 2nd story, 1st apartment from south at west
Jun 9, 2023 · Apt 22
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 22, 2nd story, 1st apartment from south at west
Jun 9, 2023 · Apt 22
Closed — Violation dismissed
DOB building violations · 25
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 21, 2021
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 8a technical report by 02/21/2017
May 31, 2018
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 13, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 18, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 24, 2013
Dob violation - resolved - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7a technical report by 02/21/2012
Jan 31, 2013
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 24, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 12, 2011
Dob violation - resolved
Show 15 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Oct 6, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 17, 2008
Dob violation - resolved - Facade facade required
L1198-local law 11/98 - facade facade required
Jun 25, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 11, 2007
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 18, 2005
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - active - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Elevator elevatorrequired
1p9352
Jan 10, 2000
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active - Elevator elevatoroptional
1
Jun 29, 1990
Dob violation - active - Elevator elevatorrequired
(03)capacity plate.(74)data plate top car.(03)install proper skin (57)water
May 23, 1990
Dob violation - resolved
ECB violations · 23
- Class - 2
Terminal 5 fuse overamped. replace with correct amp fuse. cat 1 tag missing. perform and file test. maintenance log insufficient. ( no dates and year) phone in cab inoperative. repair. cab door gibs worn. repla
Oct 4, 2021 · Penalty $625
Active - Class - 2
Failure to maintain building in code compliant manner.noted:permises 6 story masonry frame building at time of inspection observed apt #53 in state of disrepair conditions with cracks on ceiling and wall in bed
Aug 31, 2021 · Penalty $312
Resolve - Class - 1
28-201.1 inadequate tenant protection plan.note:at time of inspection observed work being performed under the aforementioned job number. the submitted tpp lacks specific means and methods of protecting tenants
Apr 22, 2021
Resolve - Class - 1
Failure to maintain building in code compliant manner.no file stopping per bc712.3. 27-345.note:at time of inspection observed work being performed under the aforementioned job number.as a result,several areas
Apr 22, 2021
Resolve - Class - 2
Failure to maintain bldg in code compliant manner. defect noted: approx hair line to 1/4" wide cracks open ups in ceiling plaster throughout in apt# 53. rem: repair all defects & maintain the bldg.
Jul 12, 2016 · Penalty $500
Active - Class - 2
Failure to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat
Apr 28, 2014
Resolve - Class - 2
Fail to file an amended 6th round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report. 36015543m rem: file an amended report following remedial
May 27, 2011
Resolve - Class - 2
Failure to file an amended sixth round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report rem: file an amended report following remedial repair
Dec 17, 2010 · Penalty $8,000
Resolve - Class - 2
Failure to file an amended 6 round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report.36010516y.rem:file an amended report following remedial r
Sep 17, 2010 · Penalty $2,000
Resolve - Class - 2
Failure to file an amended sixth round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report remedy:file an amended report following remedial repa
Dec 4, 2009 · Penalty $800
Resolve
Show 13 more ↓
- Class - 2
Local law report filed as "unsafe" by architect or engineer; no amended report was files "unsafe condition" required safety provisions for the public as per 27-129 (d) & 1rcny 32-02 (b) (5) (i). no sidewalk she
Oct 6, 2009 · Penalty $800
Resolve - Class - 2
Failure to file an amended sixth round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report remedy:file an amended report following remedial repa
May 22, 2009 · Penalty $800
Resolve - Class - 2
Local law 6th cycle report filed as "unsafe" by architect/engineer no amended report was filed. "unsafe conditions" require safety provisions for the public as 27-129(d) & 1rcny 32-03(b)(5)(i) no sidewalk shed,
Mar 6, 2009 · Penalty $800
Resolve - Class - 2
60q03.52k10.80b14.68m07.70o02.37x10.17h11.32h11.05j01.56o02.60q install lighty guards 52,80 k-b rouge developed lube & shorten or replace 68 provide main. log 70o clean pit 37r light 17h replace where needed
Jan 9, 2009 · Penalty $500
Resolve - Class - 2
Failure to file an amended sixth round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report.remedy:file an amended report following remedial repa
Nov 28, 2008 · Penalty $4,000
Resolve - Non-hazardous
Failure to file an amended 6th round report acceptable to this department indicating correction of unsafe conditions described in initial local law 11/98 report. remedy: file an amended report following remedia
Apr 30, 2008 · Penalty $700
Resolve - Hazardous
27-129(d)(c)(a) local law report was filed as "unsafe"; unsafe conditions exist and no measures taken to secure safety of public as per 27-129 (d) and ircny 32-03 (b)(5)(i). no sidewalk shed, fence, etc.-precau
Feb 27, 2008 · Penalty $800
Resolve - Hazardous
Failure to submit a fourth round technical report: periodic inspectionof exterior walls and appurtenances as required by local law 10 of 1980 and the department of buildings rules and regulations. remedy:
Jun 5, 1998 · Penalty $2,500
Resolve - Non-hazardous
75u,15e,37l,35o,35m,13b,57o,30o,30e, 75-perform test tag device and file e.l.e.v 3 form, 1st floor and others 37-jumper 35-file extinguisher
Nov 21, 1997 · Penalty $350
Resolve - Non-hazardous
3#, 30m, 73o, 62m, 9b, 62#, 3h, 46u, 17#, 42b, 50x, 73u,. 3-rotten walls 30 access holes 62-rotten 3 flooring 17-as per code 42 simits
Oct 3, 1995
Resolve - Non-hazardous
08v, 09h,15m, 17m, 28l, 33q, 74#, 75t. 74#-perform all work to comply with items from dob violations 012793esy1366cz and 120291e1430c03
Nov 22, 1993 · Penalty $200
Resolve - Non-hazardous
03i,05i,08v,09h,11q,14m,15m,17m,28l,33q,35o,37g,40h,46h,47l,49r,52h,57o,73u,75#, 03cab walls rotten at bottom. 15 floor #'s 17r for wire glass. 28 top set. 33q sky light. 49 handed. 52 lining.
Jan 27, 1993 · Penalty $200
Resolve - Non-hazardous
09h,14m,03m,15i,40h,57o. 03 provide capacity plate inside cab. 15 adj.hatch doors where necessary. 40 remove noise from gov.
Dec 2, 1991 · Penalty $1,000
Resolve
Complaints
- Heat/hot water
Entire building
Mar 13, 2026 · Apt BLDG
Close - General
Cooking gas
Feb 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 27, 2026 · Apt BLDG
Close - Electric
Power outage
Feb 27, 2026 · Apt BLDG
Close - Electric
Power outage
Feb 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 27, 2026 · Apt 72
Close - Heat/hot water
Entire building
Feb 26, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 26, 2026 · Apt 1
Close - Electric
Power outage
Feb 26, 2026 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Feb 26, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 26, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 25, 2026 · Apt 53
Close - Heat/hot water
Entire building
Feb 25, 2026 · Apt APT33
Close - Heat/hot water
Apartment only
Feb 25, 2026 · Apt 42
Close - Heat/hot water
Entire building
Feb 25, 2026 · Apt 52
Close - Heat/hot water
Entire building
Feb 25, 2026 · Apt BLDG
Close - Electric
Power outage
Feb 25, 2026 · Apt 53
Close - Heat/hot water
Entire building
Feb 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 25, 2026 · Apt 71
Close - Heat/hot water
Apartment only
Feb 25, 2026 · Apt BUILDI
Close - Heat/hot water
Entire building
Feb 25, 2026 · Apt 41
Close - Heat/hot water
Entire building
Feb 24, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 24, 2026 · Apt 45
Close - Heat/hot water
Entire building
Feb 24, 2026 · Apt 24
Close - Heat/hot water
Apartment only
Feb 14, 2026 · Apt 23
Close - Heat/hot water
Apartment only
Jan 17, 2026 · Apt 1
Close - Heat/hot water
Apartment only
Jan 8, 2026 · Apt 23
Close - Heat/hot water
Apartment only
Jan 8, 2026 · Apt 23
Close - Heat/hot water
Apartment only
Jan 4, 2026 · Apt 23
Close - Heat/hot water
Apartment only
Dec 31, 2025 · Apt 23
Close - Heat/hot water
Apartment only
Dec 22, 2025 · Apt 23
Close - Heat/hot water
Apartment only
Dec 20, 2025 · Apt 23
Close - Heat/hot water
Apartment only
Dec 18, 2025 · Apt 23
Close - Door/window
Window frame
Dec 16, 2025 · Apt 32
Close - Door/window
Window pane
Dec 16, 2025 · Apt 32
Close - Heat/hot water
Entire building
Dec 16, 2025 · Apt 32
Close - Plumbing
Radiator
Dec 16, 2025 · Apt 32
Close - Heat/hot water
Apartment only
Dec 16, 2025 · Apt 32
Close - Heat/hot water
Apartment only
Dec 14, 2025 · Apt 23
Close - Heat/hot water
Apartment only
Dec 10, 2025 · Apt 23
Close - Heat/hot water
Apartment only
Dec 2, 2025 · Apt 23
Close - Heat/hot water
Entire building
Nov 3, 2025 · Apt 23
Close - Heat/hot water
Apartment only
Oct 16, 2025 · Apt 23
Close - Heat/hot water
Apartment only
May 21, 2025 · Apt 23
Close - Unsanitary condition
Sewage
Dec 27, 2024 · Apt 23
Close - Plumbing
Toilet
Dec 27, 2024 · Apt 23
Close - Plumbing
Toilet
Dec 16, 2024 · Apt 23
Close - Plumbing
Bathtub/shower
Dec 12, 2024 · Apt 23
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Jan 9, 2026 | $890,000 | Coops - elevator apartments | — |
| Oct 27, 2025 | $995,000 | Coops - elevator apartments | — |
Building details
- Building type
- Elevator apartment building (D4)
- Year built
- 1920
- Floors
- 7
- Residential units
- 35
- Building area
- 55,917 ft²
- Lot area
- 10,092 ft²
- Zoning
- R7-2
- Community board
- 110
- Council district
- 9
- Block / lot
- 1829 / 29
- Assessed value
- $2,861,550
- Landmark / historic district
- No
HPD registration #109347, last renewed Jun 2, 2026.
Questions about 1864 Adam C Powell Blvd
Who owns 1864 Adam C Powell Blvd?
The owner of record in NYC Department of City Planning PLUTO data is Fordham, James.
Does 1864 Adam C Powell Blvd have violations?
Yes. NYC HPD has recorded 345 housing violations at this property.
Is 1864 Adam C Powell Blvd rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1864 Adam C Powell Blvd built?
City records list 1920 as the year it was built.
How many apartments are in 1864 Adam C Powell Blvd?
It has 35 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.