roofy

1864 Adam C Powell Blvd

Manhattan, NY 10026BBL 1-01829-0029Map

Owner of record: Fordham, James

1864 Adam C Powell Blvd is an elevator apartment building built in 1920 in Manhattan, 10026. It has 35 residential units across 7 floors. The owner of record is Fordham, James. HPD has recorded 345 housing violations here, most recently on April 29, 2026. 34 of the 50 most recent violations are still open.

HPD violations
345
DOB violations
25
ECB violations
23
HPD complaints
165

What to know

Concern
9 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Apr 29, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 345

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 29, 2026

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 24, 2nd story, 1st apartment from west at north

    Feb 27, 2026 · Apt 24

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 24, 2nd story, 1st apartment from west at north

    Feb 27, 2026 · Apt 24

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 24, 2nd story, 1st apartment from east at south

    Feb 26, 2026 · Apt 24

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system door locked at basement at boiler room

    Feb 26, 2026

    Open — Nov sent out
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 24, 2nd story, 1st apartment from east at south

    Feb 26, 2026 · Apt 24

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Jan 19, 2026 · Apt 1

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Jan 19, 2026 · Apt 1

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1, 1st story, 1st apartment from west at north

    Jan 19, 2026 · Apt 1

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the bathroom located at apt 1, 1st story, 1st apartment from west at north

    Jan 19, 2026 · Apt 1

    Open — Nov sent out
Show 40 more ↓
  • B

    Properly repair or replace the broken or defective radiator shut off valve handle at east wall in the 1st room from east located at apt 1, 1st story, 1st apartment from west at north

    Jan 19, 2026 · Apt 1

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 35, 3rd story, 1st apartment from east at south

    Dec 24, 2025 · Apt 35

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 23, 2nd story, 2nd apartment from west at north

    Dec 24, 2025 · Apt 23

    Open — Nov sent out
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 35, 3rd story, 1st apartment from east at south

    Dec 24, 2025 · Apt 35

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 35, 3rd story, 1st apartment from east at south

    Dec 24, 2025 · Apt 35

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system door lock at boiler room

    Dec 24, 2025

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 17, 2025

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system ...door locked at boiler room, 1st story

    Oct 18, 2025

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 23, 2nd story, 2nd apartment from west at north , section ''south''

    Oct 18, 2025 · Apt 23

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 23, 2nd story, 1st apartment from west at north

    Dec 16, 2024 · Apt 23

    Open — Nov sent out
  • B

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 1, 1st story, 1st apartment from west at north , 1st section from west at north

    Nov 21, 2023 · Apt 1

    Open — Nov sent out
  • B

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 63, 6th story, 1st apartment from west at north , 1st section from east at south

    Nov 21, 2023 · Apt 63

    Open — Nov sent out
  • B

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 54, 5th story, 1st apartment from east at south , 1st section from east at south

    Nov 21, 2023 · Apt 54

    Open — Nov sent out
  • B

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 53, 5th story, 1st apartment from west at north , 1st section from east at south

    Nov 21, 2023 · Apt 53

    Open — Nov sent out
  • B

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 52, 5th story, 1st apartment from south at west , 1st section from east at south

    Nov 21, 2023 · Apt 52

    Open — Nov sent out
  • B

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 43, 4th story, 1st apartment from west at north , 1st section from east at south

    Nov 21, 2023 · Apt 43

    Open — Nov sent out
  • B

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 5, 1st story, 2nd apartment from east at south , 1st section from east at south

    Nov 21, 2023 · Apt 5

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective fire retardant materials at ceiling at public hall, 1st story

    Oct 30, 2023

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the bathroom located at apt 33, 3rd story, 1st apartment from west at north , section ''south''

    Oct 30, 2023 · Apt 33

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story

    Oct 30, 2023

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling and east wall in the bathroom located at apt 33, 3rd story, 1st apartment from west at north , section ''south''

    Oct 30, 2023 · Apt 33

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story

    Oct 30, 2023

    Open — Nov sent out
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 33, 3rd story, 1st apartment from west at north , section ''south''

    Oct 30, 2023 · Apt 33

    Closed — Violation dismissed
  • C

    Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.

    Sep 14, 2023

    Open — Nov sent out
  • C

    Correct failure to notify occupants and/or to investigate lead-based paint hazards.

    Sep 14, 2023

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 7th room from north located at apt 22, 2nd story, 1st apartment from south at west

    Jun 9, 2023 · Apt 22

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation at 1st door from north at east wall in the foyer located at apt 22, 2nd story, 1st apartment from south at west

    Jun 9, 2023 · Apt 22

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at baseboard at west wall in the 7th room from north located at apt 22, 2nd story, 1st apartment from south at west

    Jun 9, 2023 · Apt 22

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 7th room from north located at apt 22, 2nd story, 1st apartment from south at west

    Jun 9, 2023 · Apt 22

    Open — Nov sent out
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate ... in the 3rd room from north located at apt 22, 2nd story, 1st apartment from south at west

    Jun 9, 2023 · Apt 22

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 22, 2nd story, 1st apartment from south at west

    Jun 9, 2023 · Apt 22

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall in the 8th room from north located at apt 22, 2nd story, 1st apartment from south at west

    Jun 9, 2023 · Apt 22

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the 7th room from north located at apt 22, 2nd story, 1st apartment from south at west

    Jun 9, 2023 · Apt 22

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall, 1st door frame from east at south wall, 1st door frame from north at east wall in the 6th room from north located at apt 22, 2nd story, 1st apartment from south at west

    Jun 9, 2023 · Apt 22

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, north wall in the 4th room from north located at apt 22, 2nd story, 1st apartment from south at west

    Jun 9, 2023 · Apt 22

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, baseboard at west wall, 1st door frame from north at east wall in the foyer located at apt 22, 2nd story, 1st apartment from south at west

    Jun 9, 2023 · Apt 22

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the private hallway located at apt 22, 2nd story, 1st apartment from south at west

    Jun 9, 2023 · Apt 22

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st wall cabinet from west at north wall in the kitchen located at apt 22, 2nd story, 1st apartment from south at west

    Jun 9, 2023 · Apt 22

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the bathroom located at apt 22, 2nd story, 1st apartment from south at west

    Jun 9, 2023 · Apt 22

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 22, 2nd story, 1st apartment from south at west

    Jun 9, 2023 · Apt 22

    Closed — Violation dismissed

DOB building violations · 25

  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 21, 2021

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 8a technical report by 02/21/2017

    May 31, 2018

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 13, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 18, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 24, 2013

    Dob violation - resolved
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7a technical report by 02/21/2012

    Jan 31, 2013

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 24, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 12, 2011

    Dob violation - resolved
Show 15 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 6, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 17, 2008

    Dob violation - resolved
  • Facade facade required

    L1198-local law 11/98 - facade facade required

    Jun 25, 2007

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 11, 2007

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 18, 2005

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - active
  • Facade facade required

    L1198-local law 11/98 - facade facade required

    Aug 8, 2002

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Elevator elevatorrequired

    1p9352

    Jan 10, 2000

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - active
  • Elevator elevatoroptional

    1

    Jun 29, 1990

    Dob violation - active
  • Elevator elevatorrequired

    (03)capacity plate.(74)data plate top car.(03)install proper skin (57)water

    May 23, 1990

    Dob violation - resolved

ECB violations · 23

  • Class - 2

    Terminal 5 fuse overamped. replace with correct amp fuse. cat 1 tag missing. perform and file test. maintenance log insufficient. ( no dates and year) phone in cab inoperative. repair. cab door gibs worn. repla

    Oct 4, 2021 · Penalty $625

    Active
  • Class - 2

    Failure to maintain building in code compliant manner.noted:permises 6 story masonry frame building at time of inspection observed apt #53 in state of disrepair conditions with cracks on ceiling and wall in bed

    Aug 31, 2021 · Penalty $312

    Resolve
  • Class - 1

    28-201.1 inadequate tenant protection plan.note:at time of inspection observed work being performed under the aforementioned job number. the submitted tpp lacks specific means and methods of protecting tenants

    Apr 22, 2021

    Resolve
  • Class - 1

    Failure to maintain building in code compliant manner.no file stopping per bc712.3. 27-345.note:at time of inspection observed work being performed under the aforementioned job number.as a result,several areas

    Apr 22, 2021

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner. defect noted: approx hair line to 1/4" wide cracks open ups in ceiling plaster throughout in apt# 53. rem: repair all defects & maintain the bldg.

    Jul 12, 2016 · Penalty $500

    Active
  • Class - 2

    Failure to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat

    Apr 28, 2014

    Resolve
  • Class - 2

    Fail to file an amended 6th round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report. 36015543m rem: file an amended report following remedial

    May 27, 2011

    Resolve
  • Class - 2

    Failure to file an amended sixth round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report rem: file an amended report following remedial repair

    Dec 17, 2010 · Penalty $8,000

    Resolve
  • Class - 2

    Failure to file an amended 6 round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report.36010516y.rem:file an amended report following remedial r

    Sep 17, 2010 · Penalty $2,000

    Resolve
  • Class - 2

    Failure to file an amended sixth round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report remedy:file an amended report following remedial repa

    Dec 4, 2009 · Penalty $800

    Resolve
Show 13 more ↓
  • Class - 2

    Local law report filed as "unsafe" by architect or engineer; no amended report was files "unsafe condition" required safety provisions for the public as per 27-129 (d) & 1rcny 32-02 (b) (5) (i). no sidewalk she

    Oct 6, 2009 · Penalty $800

    Resolve
  • Class - 2

    Failure to file an amended sixth round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report remedy:file an amended report following remedial repa

    May 22, 2009 · Penalty $800

    Resolve
  • Class - 2

    Local law 6th cycle report filed as "unsafe" by architect/engineer no amended report was filed. "unsafe conditions" require safety provisions for the public as 27-129(d) & 1rcny 32-03(b)(5)(i) no sidewalk shed,

    Mar 6, 2009 · Penalty $800

    Resolve
  • Class - 2

    60q03.52k10.80b14.68m07.70o02.37x10.17h11.32h11.05j01.56o02.60q install lighty guards 52,80 k-b rouge developed lube & shorten or replace 68 provide main. log 70o clean pit 37r light 17h replace where needed

    Jan 9, 2009 · Penalty $500

    Resolve
  • Class - 2

    Failure to file an amended sixth round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report.remedy:file an amended report following remedial repa

    Nov 28, 2008 · Penalty $4,000

    Resolve
  • Non-hazardous

    Failure to file an amended 6th round report acceptable to this department indicating correction of unsafe conditions described in initial local law 11/98 report. remedy: file an amended report following remedia

    Apr 30, 2008 · Penalty $700

    Resolve
  • Hazardous

    27-129(d)(c)(a) local law report was filed as "unsafe"; unsafe conditions exist and no measures taken to secure safety of public as per 27-129 (d) and ircny 32-03 (b)(5)(i). no sidewalk shed, fence, etc.-precau

    Feb 27, 2008 · Penalty $800

    Resolve
  • Hazardous

    Failure to submit a fourth round technical report: periodic inspectionof exterior walls and appurtenances as required by local law 10 of 1980 and the department of buildings rules and regulations. remedy:

    Jun 5, 1998 · Penalty $2,500

    Resolve
  • Non-hazardous

    75u,15e,37l,35o,35m,13b,57o,30o,30e, 75-perform test tag device and file e.l.e.v 3 form, 1st floor and others 37-jumper 35-file extinguisher

    Nov 21, 1997 · Penalty $350

    Resolve
  • Non-hazardous

    3#, 30m, 73o, 62m, 9b, 62#, 3h, 46u, 17#, 42b, 50x, 73u,. 3-rotten walls 30 access holes 62-rotten 3 flooring 17-as per code 42 simits

    Oct 3, 1995

    Resolve
  • Non-hazardous

    08v, 09h,15m, 17m, 28l, 33q, 74#, 75t. 74#-perform all work to comply with items from dob violations 012793esy1366cz and 120291e1430c03

    Nov 22, 1993 · Penalty $200

    Resolve
  • Non-hazardous

    03i,05i,08v,09h,11q,14m,15m,17m,28l,33q,35o,37g,40h,46h,47l,49r,52h,57o,73u,75#, 03cab walls rotten at bottom. 15 floor #'s 17r for wire glass. 28 top set. 33q sky light. 49 handed. 52 lining.

    Jan 27, 1993 · Penalty $200

    Resolve
  • Non-hazardous

    09h,14m,03m,15i,40h,57o. 03 provide capacity plate inside cab. 15 adj.hatch doors where necessary. 40 remove noise from gov.

    Dec 2, 1991 · Penalty $1,000

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Mar 13, 2026 · Apt BLDG

    Close
  • General

    Cooking gas

    Feb 27, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 27, 2026 · Apt BLDG

    Close
  • Electric

    Power outage

    Feb 27, 2026 · Apt BLDG

    Close
  • Electric

    Power outage

    Feb 27, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 27, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 27, 2026 · Apt 72

    Close
  • Heat/hot water

    Entire building

    Feb 26, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Feb 26, 2026 · Apt 1

    Close
  • Electric

    Power outage

    Feb 26, 2026 · Apt BLDG

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Feb 26, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 26, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 25, 2026 · Apt 53

    Close
  • Heat/hot water

    Entire building

    Feb 25, 2026 · Apt APT33

    Close
  • Heat/hot water

    Apartment only

    Feb 25, 2026 · Apt 42

    Close
  • Heat/hot water

    Entire building

    Feb 25, 2026 · Apt 52

    Close
  • Heat/hot water

    Entire building

    Feb 25, 2026 · Apt BLDG

    Close
  • Electric

    Power outage

    Feb 25, 2026 · Apt 53

    Close
  • Heat/hot water

    Entire building

    Feb 25, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 25, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 25, 2026 · Apt 71

    Close
  • Heat/hot water

    Apartment only

    Feb 25, 2026 · Apt BUILDI

    Close
  • Heat/hot water

    Entire building

    Feb 25, 2026 · Apt 41

    Close
  • Heat/hot water

    Entire building

    Feb 24, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Feb 24, 2026 · Apt 45

    Close
  • Heat/hot water

    Entire building

    Feb 24, 2026 · Apt 24

    Close
  • Heat/hot water

    Apartment only

    Feb 14, 2026 · Apt 23

    Close
  • Heat/hot water

    Apartment only

    Jan 17, 2026 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Jan 8, 2026 · Apt 23

    Close
  • Heat/hot water

    Apartment only

    Jan 8, 2026 · Apt 23

    Close
  • Heat/hot water

    Apartment only

    Jan 4, 2026 · Apt 23

    Close
  • Heat/hot water

    Apartment only

    Dec 31, 2025 · Apt 23

    Close
  • Heat/hot water

    Apartment only

    Dec 22, 2025 · Apt 23

    Close
  • Heat/hot water

    Apartment only

    Dec 20, 2025 · Apt 23

    Close
  • Heat/hot water

    Apartment only

    Dec 18, 2025 · Apt 23

    Close
  • Door/window

    Window frame

    Dec 16, 2025 · Apt 32

    Close
  • Door/window

    Window pane

    Dec 16, 2025 · Apt 32

    Close
  • Heat/hot water

    Entire building

    Dec 16, 2025 · Apt 32

    Close
  • Plumbing

    Radiator

    Dec 16, 2025 · Apt 32

    Close
  • Heat/hot water

    Apartment only

    Dec 16, 2025 · Apt 32

    Close
  • Heat/hot water

    Apartment only

    Dec 14, 2025 · Apt 23

    Close
  • Heat/hot water

    Apartment only

    Dec 10, 2025 · Apt 23

    Close
  • Heat/hot water

    Apartment only

    Dec 2, 2025 · Apt 23

    Close
  • Heat/hot water

    Entire building

    Nov 3, 2025 · Apt 23

    Close
  • Heat/hot water

    Apartment only

    Oct 16, 2025 · Apt 23

    Close
  • Heat/hot water

    Apartment only

    May 21, 2025 · Apt 23

    Close
  • Unsanitary condition

    Sewage

    Dec 27, 2024 · Apt 23

    Close
  • Plumbing

    Toilet

    Dec 27, 2024 · Apt 23

    Close
  • Plumbing

    Toilet

    Dec 16, 2024 · Apt 23

    Close
  • Plumbing

    Bathtub/shower

    Dec 12, 2024 · Apt 23

    Close

Sales history

DatePriceTypeUnits
Jan 9, 2026$890,000Coops - elevator apartments—
Oct 27, 2025$995,000Coops - elevator apartments—

Building details

Building type
Elevator apartment building (D4)
Year built
1920
Floors
7
Residential units
35
Building area
55,917 ft²
Lot area
10,092 ft²
Zoning
R7-2
Community board
110
Council district
9
Block / lot
1829 / 29
Assessed value
$2,861,550
Landmark / historic district
No

HPD registration #109347, last renewed Jun 2, 2026.

Questions about 1864 Adam C Powell Blvd

Who owns 1864 Adam C Powell Blvd?

The owner of record in NYC Department of City Planning PLUTO data is Fordham, James.

Does 1864 Adam C Powell Blvd have violations?

Yes. NYC HPD has recorded 345 housing violations at this property.

Is 1864 Adam C Powell Blvd rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1864 Adam C Powell Blvd built?

City records list 1920 as the year it was built.

How many apartments are in 1864 Adam C Powell Blvd?

It has 35 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.