1855 Adam C Powell Blvd
Manhattan, NY 10026BBL 1-01823-0001Map
Owner of record: 1855 7 Avenue HDFC
1855 Adam C Powell Blvd is an elevator apartment building built in 1915 in Manhattan, 10026. It has 24 residential units across 6 floors. The owner of record is 1855 7 Avenue HDFC. HPD has recorded 174 housing violations here, most recently on March 15, 2023. 35 of the 50 most recent violations are still open.
- HPD violations
- 174
- DOB violations
- 28
- ECB violations
- 26
- HPD complaints
- 247
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 174
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 15, 2023
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Jun 18, 2021
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jun 18, 2021
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Jun 18, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jun 18, 2021
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jun 18, 2021
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system ... at public hall, 1st story
Jun 18, 2021
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jun 18, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jan 7, 2021
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jan 7, 2021
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jan 7, 2021
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Jan 7, 2021
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at or near mailbox at public hall, 1st story
Jan 7, 2021
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jan 7, 2021
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Jan 7, 2021
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling at public hall, 2nd story
Dec 31, 2020
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 2nd story
Dec 31, 2020
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective 2nd concrete landing at front entrance stairs of the building
Dec 31, 2020
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 25, 2019
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 5, 2018
Closed — Violation dismissed - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing metal step, 10th up from bottom of north fire escape, south court , 2nd story, section at south
Mar 20, 2018
Closed — Violation closed - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing metal steps 2nd and 4th up from bottom of north fire esc ape at south court , 4th story, section at south
Mar 20, 2018
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 6, 2017
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 24, 2016
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall, 1st door frame from east at south wall, 1st riser from north at east wall in the 1st room from east at north located at apt 2c, 2nd story, 1st apartment from west at north
Feb 21, 2007 · Apt 2C
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from south at west wall, 1st door frame from south at west wall in the 1st room from east at south located at apt 2c, 2nd story, 1st apartment from west at north
Feb 21, 2007 · Apt 2C
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the 1st bathroom from east located at apt 2c, 2nd story, 1st apartment from west at north
Feb 21, 2007 · Apt 2C
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall, 1st door frame from west at north wall in the 2nd bathroom from east located at apt 2c, 2nd story, 1st apartment from west at north
Feb 21, 2007 · Apt 2C
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the 2nd room from east at north located at apt 2c, 2nd story, 1st apartment from west at north
Feb 21, 2007 · Apt 2C
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door, 1st door from east at south wall in the 4th room from east located at apt 2c, 2nd story, 1st apartment from west at north
Feb 21, 2007 · Apt 2C
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from south at west wall, 1st door frame from south at west wall in the 5th room from east located at apt 2c, 2nd story, 1st apartment from west at north
Feb 21, 2007 · Apt 2C
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, 1st door frame from south at west wall, 1st radiator from north at east wall in the 7th room from east located at apt 2c, 2nd story, 1st apartment from west at north
Feb 21, 2007 · Apt 2C
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door in the 2nd private hallway from north located at apt 2c, 2nd story, 1st apartment from west at north
Feb 21, 2007 · Apt 2C
Open — First no access to re- inspect violation - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling, north wall in the 1st bathroom from east located at apt 2c, 2nd story, 1st apartment from west at north
Feb 21, 2007 · Apt 2C
Open — First no access to re- inspect violation - BHazardous
M/d law abate the nuisance consisting of concealed water leak at ceiling in the 1st bathroom from east located at apt 2c, 2nd story, 1st apartment from west at north
Feb 21, 2007 · Apt 2C
Open — First no access to re- inspect violation - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling, east wall, south wall in the 2nd bathroom from east located at apt 2c, 2nd story, 1st apartment from west at north
Feb 21, 2007 · Apt 2C
Open — First no access to re- inspect violation - BHazardous
Properly secure the loose light fixture at ceilng in the 2nd bathroom from east located at apt 2c, 2nd story, 1st apartment from west at north
Feb 21, 2007 · Apt 2C
Open — First no access to re- inspect violation - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall, north wall in the 2nd private hallway from north located at apt 2c, 2nd story, 1st apartment from west at north
Feb 21, 2007 · Apt 2C
Open — First no access to re- inspect violation - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall in the 7th room from east located at apt 2c, 2nd story, 1st apartment from west at north
Feb 21, 2007 · Apt 2C
Open — First no access to re- inspect violation - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall in the 2nd room from east at north located at apt 2c, 2nd story, 1st apartment from west at north
Feb 21, 2007 · Apt 2C
Open — First no access to re- inspect violation - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall, south wall, north wall in the 1st room from east at south located at apt 2c, 2nd story, 1st apartment from west at north
Feb 21, 2007 · Apt 2C
Open — First no access to re- inspect violation - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from north at east wall in the 1st room from east at north located at apt 2c, 2nd story, 1st apartment from west at north
Feb 21, 2007 · Apt 2C
Open — First no access to re- inspect violation - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall, north wall in the 1st room from east at north located at apt 2c, 2nd story, 1st apartment from west at north
Feb 21, 2007 · Apt 2C
Open — First no access to re- inspect violation - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2c, 2nd story, 1st apartment from west at north
Feb 21, 2007 · Apt 2C
Open — First no access to re- inspect violation - BHazardous
Repair or replace the smoke detector aditional needed, not within 15 ft. of sleeping room in the entire apartment located at apt 2c, 2nd story, 1st apartment from west at north
Feb 21, 2007 · Apt 2C
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 5th room from east located at apt 6c, 6th story, 1st apartment from west at north
Feb 23, 2006 · Apt 6C
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots on 6th sty balcony at west fire escape , 1st story
Feb 8, 2006
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots on 5th sty balcony at west fire escape , 1st story
Feb 8, 2006
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots on 4th sty balcony at west fire escape , 1st story
Feb 8, 2006
Open — Nov sent out
DOB building violations · 28
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2020
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 9, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 22, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 12, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 10, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 26, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 5, 2010
Dob violation - resolved
Show 18 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Apr 6, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 13, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 14, 2003
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Elevator elevatorrequired
1p9360
Jan 3, 2002
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Elevator elevatorrequired
1p9360
Jan 5, 2000
Dob violation - resolved - Elevator elevatorrequired
1p9360
Apr 2, 1999
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 13, 1997
Dob violation - active - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 13, 1997
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 7, 1995
Vp*-violation unserved ecb- dismissed - Elevator elevatoroptional
1
Apr 25, 1991
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 18, 1990
Vp*-violation unserved ecb- dismissed - Elevator elevatoroptional
1
Jun 29, 1990
Dob violation - dismissed - Elevator elevatorrequired
(73)restore to service
May 30, 1990
Dob violation - resolved - Elevator elevatoroptional
1
Oct 12, 1989
Dob violation - dismissed
ECB violations · 26
- Class - 2
Sheave insufficient. regroove. shorten hoist ropes. fuse at terminal 4 over amped. replace with correct amp fuse. top of car light out. repair. pit light out. repair. green field top of car unsecured. secure an
Oct 4, 2021
Resolve - Class - 2
Failure to maintain building in code-compliant manner. at the time of my inspection at the above address on the above date i observed on the 6 floor in front of apt. 6c a water stained crack in the ceiling in t
Oct 29, 2017 · Penalty $500
Resolve - Class - 2
Failure to provide sidewalk shed parapet sign(all) to 3301.9.noted:@time of inspection sidewalk shed missing parapet sign all to 3301.9.rem:provide sidewalk shed parapet sign all to 3301.9.
Aug 26, 2016
Resolve - Non-hazardous
38o02/66o02/28o07/34o07/07l10/39p07/36p07/05l01. 34- cover car junction bar and any wiring that is not covered. 07- door open button
Mar 24, 2006 · Penalty $350
Resolve - Non-hazardous
83l10 (83-l-10) elevator not working restore to service so that properinspection may be performed by d.o.b. inspectors.
Feb 21, 2006 · Penalty $880
Resolve - Non-hazardous
83l10. (83-l-10)elevator not working restore to service so that properinspection may be performed by d.o.b. inspectors.
Feb 14, 2006
Resolve - Non-hazardous
(83-l-10) elev. not working, defective repair.
Jan 12, 2006 · Penalty $880
Resolve - Non-hazardous
83l10 (83-l-10) repair, restore to proper service so that a proper inspection may be performed by d.o.b. elevator inspector.
Dec 16, 2005 · Penalty $350
Resolve - Non-hazardous
83x10. 83-entire device out service restore to service to property inspector by d.o.b.
Dec 8, 2005 · Penalty $350
Resolve - Non-hazardous
83x10/39p16. 83- repair, restore and provide service so a full inspection could be done by this dept.
Nov 25, 2005 · Penalty $350
Resolve
Show 16 more ↓
- Non-hazardous
Work without permits noted in apt # 5c (north)demolition of plaster walls and ceiling and erection of new sheet rock ceilings partitions electric without obtaining required dob permits remedy:stop all work apt
Mar 29, 2005
Resolve - Non-hazardous
23l10/10m11/21b01/16p16/84x10/66o02/21q03/11p07 23l10 repair up hall call button 10m11 replace missing (one) slow speed car door gib 21b01 adjust second floor lock contact and keeper on door too much play 16b16
Jul 12, 2004 · Penalty $2,500
Resolve - Non-hazardous
23l10/44b14/05d06/10m11/16m11/16b01/03m07/66o02/16d07 23- repair 1st floor hall button station. 44- shorten governor cable. 05- properly adjust cardoor- close gap at bottom of door. 16- replace other gib on
May 5, 2004 · Penalty $10,000
Resolve - Non-hazardous
6l10,12b7,15i10,16m7,21q3,21l10,12x7,23x10,28q3,36p16,39p16,83n16,84m76l10-not full opening 1b7-car 16m7-floor numbers 21q3-b and 4th flr. 21l10-stops car in flight when 2nd flr door is pulled 12x7- car top
Nov 5, 2003 · Penalty $350
Resolve - Non-hazardous
8v1,57o02,73n11,73x11.8-basement saddle(hall).73-provide service to 6fl.73-make repairs and restore to service for a full inspection by this dept.
Apr 2, 2001 · Penalty $350
Resolve - Non-hazardous
11q3, 15m7, 8v1,5j11,5l11,15l11,11x11,25q3,27q3,33p17,37g12,57o2. 15m7-fl numbers, 5j11-too much gap between doors, 5l11-not full opening, 15l11-not self closing @ b &6fls. 11x11-car top, 27q3-bottom, 37g1
Nov 17, 2000 · Penalty $2,500
Resolve - Non-hazardous
Failure to file a report of compliance with local lae 16/84 certifying to the installation of required fire protection systems. remedy: file report
Jun 7, 2000 · Penalty $2,500
Resolve - Non-hazardous
Failure to provide elevator landing signs "in case of fire".use stairsunless otherwise instructed on all floors .failure to provide 3" floor number signs at stairs landing on all floors .remedy: provide signage
Jun 7, 2000
Resolve - Non-hazardous
73x11,36j01,36t07,57o02,15h07,27m07,11q07,28h01,22i06,09h12,15t07,33p07, (36)2nd m/r door (36t)both (15a)door closers(proper)(22)to code(15)floor numbers(73)restore service to elev.for inspection
Apr 3, 2000 · Penalty $2,500
Resolve - Non-hazardous
8v,11q,15m,20l,22o,22i,30i,32q,37g,55x,57o. floor numbers, button, cartop, pit area.
Dec 2, 1999 · Penalty $2,500
Resolve - Non-hazardous
Work without a permit noted: 1-removal of all lath & plaster from 3 rooms & bathroom at rear of apt.#3e at 3rd floor north side of bldg. 2-installing new sheetrock at private hallway(approx 50-60ft) and all
Aug 26, 1998 · Penalty $2,500
Resolve - Non-hazardous
74n17,35t16,35i11,8v1,11q12,74m7,15i12,17i12,14m7. provide access to all floors. seal hole to hoistway. spinout devices on shackle car and counterweight. replace or repair 5th floor door.
Sep 9, 1997 · Penalty $1,000
Resolve - Non-hazardous
05e,05q,07x,08b,09h,11q,14m,15b,17i,18m,25l,31m,35o,50o,55m,57o,74* #05- car door 3 inches gap when closed #15-adjust hoidtway doors when closing #17-vision glass broken on 3 floors #18-missing covers #74-clean
Jun 18, 1997 · Penalty $100
Resolve - Hazardous
15l,17i,28l,29r,15m,22d,57o,73o,50l. 15l door checks. 29 landed. 15 floor #'s. 50l machine limit. cease use untill item. 29 is complied before returning to service, call 312-8730 for reinspection.
Nov 8, 1993
Resolve - Non-hazardous
05m,15l,17i,28l,33m,26#,27#,29r,49l,57o. 05 cut out for vision panel. 15l door checks. 33 walls and door. 26,27 wire it in proper sequence on pit. 29 landed.
Jan 25, 1993
Resolve - Non-hazardous
08v,50p,33p,57o
Aug 7, 1991 · Penalty $1,000
Resolve
Complaints
- Flooring/stairs
Floor
Oct 21, 2026 · Apt 2C
Open - Unsanitary condition
Mold
Oct 21, 2026 · Apt 2C
Open - Plumbing
Bathtub/shower
Oct 21, 2026 · Apt 2C
Open - Paint/plaster
Ceiling
Oct 21, 2026 · Apt 2C
Open - Heat/hot water
Apartment only
Jan 29, 2026 · Apt 1B
Close - Heat/hot water
Apartment only
Jan 28, 2026 · Apt 1D
Close - Heat/hot water
Apartment only
Jan 22, 2026 · Apt 1B
Close - Unsanitary condition
Pests
Jan 19, 2026 · Apt 1B
Close - Heat/hot water
Apartment only
Jan 19, 2026 · Apt 1B
Close - Heat/hot water
Apartment only
Dec 31, 2025 · Apt 1B
Close
Show 40 more ↓
- Flooring/stairs
Floor
Dec 31, 2025 · Apt 1B
Close - Unsanitary condition
Pests
Dec 31, 2025 · Apt 1B
Close - Heat/hot water
Apartment only
Dec 15, 2025 · Apt 1B
Close - Heat/hot water
Entire building
Dec 11, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 21, 2025 · Apt 1B
Close - Heat/hot water
Apartment only
Feb 20, 2025 · Apt 1B
Close - Heat/hot water
Apartment only
Dec 24, 2022 · Apt 1B
Close - Heat/hot water
Apartment only
Nov 16, 2021 · Apt 6B
Close - Door/window
Door
Oct 18, 2019 · Apt 4C
Close - Door/window
Door
Oct 18, 2019 · Apt 4C
Close - Door/window
Door
Oct 18, 2019 · Apt 4C
Close - Door/window
Door
Oct 18, 2019 · Apt 4C
Close - Plumbing
Water supply
May 29, 2012 · Apt 6B
Close - Heating
Heat related
Feb 20, 2011 · Apt 3A
Close - Nonconst
Vermin
Dec 30, 2009 · Apt 4B
Close - Nonconst
Vermin
Dec 30, 2009 · Apt 4B
Close - General
Mold
Dec 30, 2009 · Apt 4B
Close - General
Mold
Dec 30, 2009 · Apt 4B
Close - Heating
Heat related
Mar 4, 2008 · Apt 1C
Close - Paint/plaster
Wall
Feb 10, 2007 · Apt 2C
Close - Heating
Heat related
May 23, 2006 · Apt 6C
Close - General
Floor
Mar 3, 2006 · Apt 6C
Close - General
Floor
Mar 3, 2006 · Apt 6C
Close - Paint/plaster
Ceiling
Mar 3, 2006 · Apt 6C
Close - Paint/plaster
Ceiling
Mar 3, 2006 · Apt 6C
Close - General
Mold
Mar 3, 2006 · Apt 6C
Close - Paint/plaster
Ceiling
Mar 3, 2006 · Apt 6C
Close - Plumbing
Water-leaks
Mar 3, 2006 · Apt 6C
Close - Heating
Heat related
Feb 19, 2006 · Apt 6C
Close - General
Mold
Feb 9, 2006 · Apt 6C
Close - Heating
Heat related
Feb 7, 2006 · Apt 6C
Close - Heating
Heat related
Jan 27, 2006 · Apt 6C
Close - Heating
Heat related
Jan 27, 2006 · Apt 6C
Close - Heating
Heat related
Jan 27, 2006 · Apt 6C
Close - Heating
Heat related
Jan 23, 2006 · Apt 6C
Close - Heating
Heat related
Jan 20, 2006 · Apt 6C
Close - Heating
Heat-plant
Jan 11, 2006 · Apt 6C
Close - Heating
Heat related
Jan 11, 2006 · Apt 6C
Close - Heating
Heat related
Jan 11, 2006 · Apt 6C
Close - Plumbing
Bathtub/shower
Jan 10, 2006 · Apt 1C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D4)
- Year built
- 1915
- Floors
- 6
- Residential units
- 24
- Building area
- 47,534 ft²
- Lot area
- 10,092 ft²
- Zoning
- R7-2
- Community board
- 110
- Council district
- 9
- Block / lot
- 1823 / 1
- Assessed value
- $2,070,900
- Landmark / historic district
- No
HPD registration #113274, last renewed Aug 26, 2025.
Questions about 1855 Adam C Powell Blvd
Who owns 1855 Adam C Powell Blvd?
The owner of record in NYC Department of City Planning PLUTO data is 1855 7 Avenue HDFC.
Does 1855 Adam C Powell Blvd have violations?
Yes. NYC HPD has recorded 174 housing violations at this property.
Is 1855 Adam C Powell Blvd rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1855 Adam C Powell Blvd built?
City records list 1915 as the year it was built.
How many apartments are in 1855 Adam C Powell Blvd?
It has 24 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.