420 East 119 Street
Manhattan, NY 10035BBL 1-01806-0039Map
Owner of record: El Barrio Tenants Eta
420 East 119 Street is a walk-up apartment building built in 1900 in Manhattan, 10035. It has 16 residential units across 6 floors. The owner of record is El Barrio Tenants Eta. HPD has recorded 145 housing violations here, most recently on May 6, 2026. 20 of the 50 most recent violations are still open.
- HPD violations
- 145
- DOB violations
- 8
- ECB violations
- 7
- HPD complaints
- 130
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 145
- ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story
May 6, 2026
Open — Not complied with - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
May 6, 2026
Open — False certification - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling at public hall, 1st story
May 6, 2026
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story
May 6, 2026
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
May 6, 2026
Open — Not complied with - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
May 6, 2026
Open — Not complied with - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
May 6, 2026
Open — Not complied with - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
May 6, 2026
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
May 6, 2026
Open — Not complied with - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
May 6, 2026
Open — Not complied with
Show 40 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ,leading to east yard. at public hall, 1st story
Aug 29, 2025
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 4, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective inoperable hinges at door in the foyer located at apt 14, 6th story, 1st apartment from east at south
Oct 25, 2024 · Apt 14
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from north at east wall, 1st door frame from north at east wall in the 1st room from north at west located at apt 14, 6th story, 1st apartment from east at south
Oct 3, 2024 · Apt 14
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 2nd window frame from south at west wall in the 1st room from north at west located at apt 14, 6th story, 1st apartment from east at south
Oct 3, 2024 · Apt 14
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchenette , the 3rd room from north at east, the 1st room from north at east located at apt 14, 6th story, 1st apartment from east at south
Oct 3, 2024 · Apt 14
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 14, 6th story, 1st apartment from east at south
Sep 30, 2024 · Apt 14
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system locked door at basement at boiler room
Sep 30, 2024
Open — Nov sent out - BHazardous
Refit door in the entrance located at apt 14, 6th story, 1st apartment from east at south
Sep 30, 2024 · Apt 14
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 14, 6th story, 1st apartment from east at south
Sep 30, 2024 · Apt 14
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 14, 6th story, 1st apartment from east at south
Sep 30, 2024 · Apt 14
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 15, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 15, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 6, 2017
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 25, 2016
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 1, 2015
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 4, 2nd story, 1st apartment from north at east
May 7, 2015 · Apt 4
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 4, 2nd story, 1st apartment from north at east
May 7, 2015 · Apt 4
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes house hold items and flower pots at front fire escape balcony, all stories
Sep 9, 2014
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes house hold items and flower pots at rear fire escape balcony, all stories
Sep 9, 2014
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of house hold items and trash bags under stairs at public hall, 1st story
Sep 9, 2014
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the house hold items, construction material and trash bags at basement
Sep 9, 2014
Open — First no access to re- inspect violation - BHazardous
Arrange and make self-closing the doors .. in the entrance located at apt 4, 2nd story, 1st apartment from north at east
Aug 7, 2012 · Apt 4
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from north located at apt 4, 2nd story, 1st apartment from north at east
Aug 7, 2012 · Apt 4
Closed — Violation closed - ANon-hazardous
Refit the doors of the sink base cabinet in the kitchen located at apt 4, 2nd story, 1st apartment from north at east
Aug 7, 2012 · Apt 4
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 4, 2nd story, 14th apartment from north at east
May 21, 2012 · Apt 4
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective the wood floors in the entire apartment located at apt 4, 2nd story, 1st apartment from north at east
May 21, 2012 · Apt 4
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 4, 2nd story, 1st apartment from north at east
May 21, 2012 · Apt 4
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 4, 2nd story, 1st apartment from north at east
May 21, 2012 · Apt 4
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceilings and walls in the entire apartment located at apt 4, 2nd story, 1st apartment from north at east
May 21, 2012 · Apt 4
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and walls in the 1st room from north located at apt 4, 2nd story, 1st apartment from north at east
May 21, 2012 · Apt 4
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the bathroom located at apt 4, 2nd story, 1st apartment from north at east
May 21, 2012 · Apt 4
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets faucet at the wash basin in the bathroom located at apt 4, 2nd story, 1st apartment from north at east
May 21, 2012 · Apt 4
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the kitchen located at apt 4, 2nd story, 1st apartment from north at east
May 21, 2012 · Apt 4
Closed — Violation closed - CImmediately hazardous
Abate the nuisance consisting of rodents rats in the entire apartment located at apt 4, 2nd story, 1st apartment from north at east
May 21, 2012 · Apt 4
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 11, 5th story, 1st apartment from east at south
Jan 14, 2011 · Apt 11
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 11, 5th story, 1st apartment from east at south
Jan 14, 2011 · Apt 11
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of plywood, buckets of ceramic tile mortar and other construction materials at public hall, 1st story
Jan 14, 2011
Closed — Violation closed - ANon-hazardous
Repair the leaky and/or defective faucets cold water shower body in the bathroom located at apt 9, 4th story, 1st apartment from south at west
Dec 3, 2010 · Apt 9
Closed — Violation closed
DOB building violations · 8
- Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 27, 2018
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 7
- Class - 2
Failure to comply w/the comm's order contained in summons/vio#35323144n issued on 04-04-18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. failure to provide unobstructed exit passageway.
Sep 8, 2018 · Penalty $3,125
Resolve - Class - 2
Failure to comply w/comm's order contained in summ/vio#35323144n issued on 04/04/18 and to file a cofc pursuant to 28-201.1 and 1rcny 102-01observed on 3rd fl 3 lmce boxes in the hallway blocking egress for the
Jul 19, 2018 · Penalty $3,125
Resolve - Class - 2
Failure to comply w/ the commissioner's order contained in summons/violation# 35323144n issued on 4/4/18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. note: no document file for failure to provide uno
May 14, 2018 · Penalty $3,125
Resolve - Class - 1
Failure to provide unobstructed exit passageway at the time of inspection at the above address on the above date i observed on the 3rd fl 3 lmce boxes in the hallway blocking egress for the tenants in apt 9+10
Apr 4, 2018 · Penalty $6,250
Active - Class - 2
Erected illuminated sign,approx 9ft wide x 3ft high x 4 in th,w/ inscription "iglesia pentecostal-smirna inc" w/o a permit.rem comply w/ nov
Jul 21, 2017 · Penalty $830
Active - Class - 3
Work without a permit work noted new plmbgelectrical partitions & sheetrock in apt number 6 remedty stop all work except for work to make site safe obtain a permit
Dec 24, 2009 · Penalty $200
Active - Non-hazardous
Work w/o permit:work noted:in apt8,south-1 apt,4th flr.1-demolished existing closet which was part of the original layout of apt inorder to reconfigure the layout of apt.while making foyer bigger for aesthetic
May 29, 2007 · Penalty $250
Resolve
Complaints
- General
Cooking gas
Jan 9, 2026 · Apt BLDG
Close - Plumbing
Water supply
Mar 6, 2025 · Apt 9
Close - Heat/hot water
Apartment only
Sep 29, 2024 · Apt 14
Close - Heat/hot water
Apartment only
Dec 15, 2021 · Apt 4
Close - Heat/hot water
Entire building
Nov 1, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 28, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 26, 2019 · Apt 1
Close - Heat/hot water
Entire building
Mar 19, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 19, 2018 · Apt 1
Close - Unsanitary condition
Garbage/recycling storage
Nov 1, 2016 · Apt BLDG
Close
Show 40 more ↓
- Safety
Smoke detector
Apr 28, 2015 · Apt 4
Close - Safety
Carbon monoxide detector
Apr 28, 2015 · Apt 4
Close - Plumbing
Basin/sink
May 18, 2014 · Apt 9
Close - Plumbing
Water supply
May 18, 2014 · Apt 9
Close - Heat/hot water
Apartment only
Mar 25, 2014 · Apt 9
Close - General
Doors
Apr 13, 2013 · Apt 9
Close - Heating
Heat related
Oct 12, 2012 · Apt 9
Close - General
Window guards
Sep 13, 2012 · Apt 3
Close - General
Window guards
Sep 13, 2012 · Apt 3
Close - General
Floor
Aug 3, 2012 · Apt 4
Close - General
Floor
Jul 25, 2012 · Apt 4
Close - General
Cabinet
Jul 25, 2012 · Apt 4
Close - General
Cabinet
Jul 16, 2012 · Apt 4
Close - General
Floor
Jul 16, 2012 · Apt 4
Close - Paint/plaster
Wall
May 17, 2012 · Apt 4
Close - Paint/plaster
Wall
May 17, 2012 · Apt 4
Close - Paint/plaster
Wall
May 17, 2012 · Apt 4
Close - General
Floor
May 17, 2012 · Apt 4
Close - General
Cabinet
May 17, 2012 · Apt 4
Close - Nonconst
Vermin
May 17, 2012 · Apt 4
Close - Paint/plaster
Wall
May 17, 2012 · Apt 4
Close - Plumbing
Basin/sink
May 17, 2012 · Apt 4
Close - General
Ceramic-tile
May 17, 2012 · Apt 4
Close - Paint/plaster
Ceiling
May 17, 2012 · Apt 4
Close - Electric
Lighting
Dec 14, 2011 · Apt 3
Close - Plumbing
Basin/sink
Dec 14, 2011 · Apt 3
Close - Plumbing
Basin/sink
Dec 14, 2011 · Apt 3
Close - Plumbing
Bathtub/shower
Dec 14, 2011 · Apt 3
Close - Paint/plaster
Wall
Dec 14, 2011 · Apt 3
Close - Paint/plaster
Wall
Dec 14, 2011 · Apt 3
Close - General
Floor
Dec 14, 2011 · Apt 3
Close - General
Floor
Dec 14, 2011 · Apt 3
Close - Plumbing
Water supply
Dec 14, 2011 · Apt 9
Close - Electric
Lighting
Jan 24, 2011 · Apt 9
Close - Plumbing
Water-leaks
Jan 24, 2011 · Apt 9
Close - Paint/plaster
Ceiling
Jan 24, 2011 · Apt 9
Close - Plumbing
Radiator
Jan 24, 2011 · Apt 9
Close - Heating
Heat related
Jan 11, 2011 · Apt BLDG
Close - Heating
Heat related
Jan 11, 2011 · Apt BLDG
Close - Plumbing
Water-leaks
Dec 2, 2010 · Apt 9
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C6)
- Year built
- 1900
- Floors
- 6
- Residential units
- 16
- Building area
- 12,876 ft²
- Lot area
- 3,350 ft²
- Zoning
- R7B
- Community board
- 111
- Council district
- 8
- Block / lot
- 1806 / 39
- Assessed value
- $623,250
- Landmark / historic district
- No
HPD registration #135505, last renewed Jul 28, 2026.
Questions about 420 East 119 Street
Who owns 420 East 119 Street?
The owner of record in NYC Department of City Planning PLUTO data is El Barrio Tenants Eta.
Does 420 East 119 Street have violations?
Yes. NYC HPD has recorded 145 housing violations at this property.
Is 420 East 119 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 420 East 119 Street built?
City records list 1900 as the year it was built.
How many apartments are in 420 East 119 Street?
It has 16 residential units and 17 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.