225 East 126 Street
Manhattan, NY 10035BBL 1-01791-0001Map
Owner of record: Mm Proton I, LLC
225 East 126 Street is a hospital / health built in 2020 in Manhattan, 10035. The owner of record is Mm Proton I, LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 44
- ECB violations
- 20
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 44
- High pressure boiler boiler required
Violation issued-failure to file 2024 external hgh pressure inspection
Nov 14, 2025
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2024 external hgh pressure inspection
Nov 14, 2025
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2024
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2024
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 22, 2024
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed
Show 34 more ↓
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2021 internal hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2021 internal hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2021 external hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2021 external hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2020 internal hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2020 internal hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2020 external hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2020 external hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2019 internal hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2019 internal hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2019 external hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2019 external hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2018 internal hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2018 internal hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2018 external hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2018 external hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2022 external high pressure inspection
Apr 25, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2022 external high pressure inspection
Apr 25, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2022 internal high pressure inspection
Apr 25, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2022 internal high pressure inspection
Apr 25, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2020
Dob violation - dismissed - Construction other optional
C-construction other optional
May 24, 2017
Vpw*-violation unserved ecb-work without permit-dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2017
Dob violation - dismissed - Plumbing none
P-plumbing none
Sep 7, 1994
Vp*-violation unserved ecb- dismissed
ECB violations · 20
- Class - 2
Pops site is open. water fountain not working. no movable chairs/tables., comply with zr
Aug 25, 2026 · Penalty $5,000
Active - Class - 1
Failure to submit the required parking structure initial observation report for an existing parking structure or a periodic inspection of a parking structure(pips)report documenting the condition of psid#m00021
Oct 1, 2024
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements forconstruction site,during my inspection at the above add on the above date i observed on e. 127st styrofoam littered all over the sidewalk co
Sep 23, 2017
Resolve - Class - 1
Construction superintendent failed to immediately notify the department of conditions as required.note:responding to incident of worker injured at 225 e 126 street a 3 stry new building under construction at 3s
May 24, 2017
Resolve - Class - 1
Note designated construction superintendent on pws.note at time of inspection of a 3 sty new building under construction pouring 3 flr active trades on different areas.no designate construction super on pw2 con
May 24, 2017 · Penalty $400
Resolve - Class - 1
Bc3308.5/failure to maintain vertical netting.note at time of inspection of a 3sty new building at 3 sty level.i observed vertical netting installed on 2nd sty with netting not attached to the zero cables,gaps
May 24, 2017 · Penalty $400
Resolve - Class - 1
Failure to safeguard all persons and property affected by constructionnote at time of inspection of a 5 sty building pouring 319 sty floor.worker white going over a trench approximate 32 inch deep and 2ft wide
May 24, 2017
Resolve - Class - 2
1rcny 3301-02(d)construction superintendent failed to maintain and make logs available.note at time of inspection of a 3 sty new building under construction with several trades on site.concrete pouring on 3rd
May 24, 2017
Resolve - Class - 1
Failure to notify when construction superintendent is absence more than 2 weeks.note at time of inspection of a 3 sty under construction at 3 sty.choking bis on pw2 lists joseph cifelli reg#0025597 but reg#0025
May 24, 2017
Resolve - Class - 1
Failure to immediately notify the dept of an accident at the construction site. observed excessive cracks at various locations throughout the bldg & signs of settlement as a result of construction activity at
Apr 1, 2016
Resolve
Show 10 more ↓
- Class - 2
Sec. 3309.4 failure to preserve & protect adjoining structure affectedby excavation operations. the adjoining bldg at exp#4(230 e 127st)sustained significant damage in the form of settlement which resulted in
Apr 1, 2016
Resolve - Class - 2
Bc3309.4 failure to preserve and protect adjoining structures affected by excavation operations. the adjoining bldg at exp4 (230 e. 127 st)sustained damaged in the form of excessive settlement in cracks in the
Dec 31, 2015
Resolve - Class - 1
Failure to have site safety manager or coordinator present as required. noted: at time of inspection work ongoing at site under ahv permit #121187027 ref #00628195 w/site prep work & caison drilling in process
Dec 16, 2015
Resolve - Class - 2
Failure to provide approved/accepted plans at the jobsite at the time of inspection.plans for the foundation and excavation related activityare inadequate.plans do not contain details fo the adjoining building
Oct 28, 2015
Resolve - Class - 1
Failure to notify the dept of an accident at a construction site. the respondent failed to notify the dob of an incident which occurred at the jobsite on 10-16-15.as per the nyc building code, the dept must by
Oct 28, 2015 · Penalty $2,500
Resolve - Class - 2
Failure to safeguard all persons and property affected by constructionoperations.drill (rig) caused damage to the adjoining building at exposure #2.partial stop work oder issued for all work within ten feet (10
Oct 27, 2015 · Penalty $1,200
Resolve - Class - 2
Failure to comply with the commissioner's order contained in nov# 35117828r issued on 12/13/14 & to file a certificate of correction pursuant to 28-201.1, 28-204.4 & 1rcny 102-01. remedy: comply with commission
Jul 18, 2015
Resolve - Class - 1
Failure to maintain bldg in a code compliant manner. note: roof fully compromised & roof joists, sub-roof sheathing water damaged structural brick column cracked & displaced, floor slab cracked & with signifig
Dec 13, 2014
Resolve - Class - 3
Failure to maintain bldg walls or appurtenances. defects noted: in front of story bldg roll down gate broken and open to entry. remedy: repair and or replace defects.
Nov 20, 2008 · Penalty $500
Resolve - Non-hazardous
Plumbing work without a permit. remedy; obtain a a permit if feasible.
Jul 17, 1997
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Hospital / health (I9)
- Year built
- 2020
- Floors
- 3
- Residential units
- —
- Building area
- 139,333 ft²
- Lot area
- 50,957 ft²
- Zoning
- C6-3
- Community board
- 111
- Council district
- 8
- Block / lot
- 1791 / 1
- Assessed value
- $51,627,000
- Landmark / historic district
- No
Questions about 225 East 126 Street
Who owns 225 East 126 Street?
The owner of record in NYC Department of City Planning PLUTO data is Mm Proton I, LLC.
Does 225 East 126 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 225 East 126 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 225 East 126 Street built?
City records list 2020 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.