2089 Lexington Avenue
Manhattan, NY 10035BBL 1-01775-0020Map
Owner of record: Milltwee HDFC
2089 Lexington Avenue is an elevator apartment building built in 1990 in Manhattan, 10035. It has 40 residential units across 6 floors. The owner of record is Milltwee HDFC. HPD has recorded 180 housing violations here, most recently on September 3, 2025. 20 of the 50 most recent violations are still open.
- HPD violations
- 180
- DOB violations
- 38
- ECB violations
- 9
- HPD complaints
- 306
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 180
- ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended celing. at public hall, 1st story
Sep 3, 2025
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 3g, 3rd story, 1st apartment from south at west
Sep 3, 2025 · Apt 3G
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt 3g, 3rd story, 1st apartment from south at west
Sep 3, 2025 · Apt 3G
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 3rd room from north located at apt 3g, 3rd story, 1st apartment from south at west
Sep 3, 2025 · Apt 3G
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north located at apt 3g, 3rd story, 1st apartment from south at west
Sep 3, 2025 · Apt 3G
Open — Nov sent out - CImmediately hazardous
Remove device preventing door from being self-closing a stopper installed at laundry room door at public hall, 1st story
Sep 3, 2025
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt 2c, 2nd story, 1st apartment from east at south original violation 18190573 issued 27-aug-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Aug 27, 2025 · Apt 2C
Open — First no access to re- inspect violation - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2c, 2nd story, 1st apartment from east at south
Aug 27, 2025 · Apt 2C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and north wall in the kitchen located at apt 3g, 3rd story, 1st apartment from south at west
Aug 27, 2025 · Apt 3G
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 3g, 3rd story, 1st apartment from south at west
Aug 27, 2025 · Apt 3G
Closed — Violation closed
Show 40 more ↓
- BHazardous
Remove all obstructions and repair all defects in sink in the kitchen located at apt 2c, 2nd story, 1st apartment from east at south
Aug 27, 2025 · Apt 2C
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2c, 2nd story, 1st apartment from east at south
Aug 27, 2025 · Apt 2C
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2c, 2nd story, 1st apartment from east at south
Aug 27, 2025 · Apt 2C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the bathroom located at apt 2c, 2nd story, 1st apartment from east at south
Aug 27, 2025 · Apt 2C
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt 2c, 2nd story, 1st apartment from east at south
Aug 27, 2025 · Apt 2C
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective bell/buzzer intercom system from building entrance to panel at south wall in the 1st room from north located at apt 3g, 3rd story, 1st apartment from south at west
Aug 27, 2025 · Apt 3G
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the private hallway located at apt 3g, 3rd story, 1st apartment from south at west
Aug 27, 2025 · Apt 3G
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the 4th room from north located at apt 3g, 3rd story, 1st apartment from south at west
Aug 27, 2025 · Apt 3G
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 4th room from north located at apt 3g, 3rd story, 1st apartment from south at west
Aug 27, 2025 · Apt 3G
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 15, 2023
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 4b, 4th story, 3rd apartment from west at north
Jun 8, 2023 · Apt 4B
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 4b, 4th story, 3rd apartment from west at north
Jun 8, 2023 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4b, 4th story, 3rd apartment from west at north
Jun 8, 2023 · Apt 4B
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4b, 4th story, 3rd apartment from west at north
Jun 8, 2023 · Apt 4B
Open — Violation will be reinspected - CImmediately hazardous
Abate the infestation consisting of roaches located at apt 4b, 4th story, 3rd apartment from west at north
Apr 14, 2023 · Apt 4B
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 15, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 1, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 25, 2019
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3f, 3rd story
Sep 9, 2019 · Apt 3F
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system .locked door to boiler at cellar
Sep 9, 2019
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3f, 3rd story, 4th apartment from east at south
Sep 9, 2019 · Apt 3F
Closed — Violation closed - ANon-hazardous
Replace with new the missing cap, cover, safety device or replace with tamper resistant electrical outlet at west wall at public hall, 1st story
Jul 10, 2019
Closed — Violation closed - ANon-hazardous
Replace with new the missing cap, cover, safety device or replace with tamper resistant electrical outlet at east wall at public hall, 5th story
Jul 10, 2019
Closed — Violation closed - ANon-hazardous
Replace with new the missing caps or covers at east and west walls at electrical outlets at public hall, 1st story
Jun 3, 2019
Open — Not complied with - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Jun 3, 2019
Open — Not complied with - ANon-hazardous
Replace with new the missing caps or covers at east wall at electrical outlet at public hall, 5th story
Jun 3, 2019
Open — Not complied with - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Jun 3, 2019
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jun 3, 2019
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jun 3, 2019
Open — Not complied with - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Jun 3, 2019
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Jun 3, 2019
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 9, 2018
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in sink at wasteline in the kitchen located at apt 6d, 6th story, 1st apartment from west at north
Jul 29, 2018 · Apt 6D
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood draw at base cabinet at east wall in the kitchen located at apt 6d, 6th story, 2nd apartment from east at south
Jul 20, 2018 · Apt 6D
Closed — Violation closed - BHazardous
Replace or repair the self-closing doors that is missing or defective ... in the entrance located at apt 6d, 6th story, 2nd apartment from east at south
Jul 20, 2018 · Apt 6D
Closed — Violation closed - BHazardous
Properly repair the broken or defective electrical outlet on north wall in the 2nd room from east at south located at apt 6d, 6th story, 2nd apartment from east at south
Jul 20, 2018 · Apt 6D
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in wasteline at wash basin. in the bathroom located at apt 6d, 6th story, 2nd apartment from east at south
Jul 20, 2018 · Apt 6D
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles at bathtub in the bathroom located at apt 6e, 6th story, 2nd apartment from west at north
Jul 11, 2018 · Apt 6E
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 6e, 6th story, 2nd apartment from west at north
Jul 11, 2018 · Apt 6E
Closed — Violation closed
DOB building violations · 38
- Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 26, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 16, 2020
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 3, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 3, 2018
Dob violation - resolved
Show 28 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 21, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 21, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 5, 2017
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 12, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 12, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 7, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 7, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 29, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 29, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 20, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 20, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 13, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 13, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 16, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 28, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 28, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 20, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 20, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 17, 2004
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 17, 2004
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 20, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed - Elevator elevatoroptional
2
Apr 7, 1992
Dob violation - dismissed - Plumbing none
P-plumbing none
Jun 5, 1991
Dob violation - dismissed
ECB violations · 9
- Class - 1
No door lock monitoring installed in controller as mandated in appendix k3 of the 2014 building code. remedy: install dlm , file and perform test with nyc dob
Mar 1, 2021 · Penalty $1,250
Active - Class - 1
Class 1, no installed in controller as mandated by 3. 10.12 of appendix k3 of the 2014 nycbc, remedy; file application, install dlm and perform and file test with nycdob,
Jun 25, 2020 · Penalty $1,280
Active - Class - 1
1l10,2x10,5m7,59bb7,99bb7. 1l10-emergency bell does not ring defective repair; 2x10-outside comm inoperative repair; 5m7-car door restrictor missing provide; 5m7-machine brake tag expired provide; 99bb7-one yr
Jul 18, 2019 · Penalty $1,250
Resolve - Class - 2
97x10,99bb7. 97x10-restore to service for proper inspection by dob. 99bb7-one year tag expired provide.
Jan 29, 2018 · Penalty $250
Resolve - Class - 1
Sec: 28-207.5. 97##. unlawful act, failure to comply w/ a cease use order of the commissioner. device 1p36513 was returned to service w/out a re-insp by this dept to determine that the cease use condition have
Dec 28, 2017 · Penalty $1,600
Resolve - Class - 1
5a10,41m7,61t7,59u15,64m7,71x10,80m7,39m7,39x10,2x10,5m7,52m7,53m7,56y13,56d7. (5a)door zone restrictor has been altered & rendered inoperative. this is a safety device, repair restrictor & contact nyc dob @ ei
Dec 26, 2017 · Penalty $1,000
Resolve - Class - 2
3307.6.5 sidewalk shed erected under job#140381673 along exp1 & 2 has inoperable bulbs rendering affected area visibly dark & shadowy creating a potential risk to public safety.rem comply to code
Jan 1, 2016 · Penalty $4,000
Resolve - Class - 2
15d10,72b1,71q07,67l10,100m11. 15d- unsecured certificate frame in car72b- pit stop switch too high should be approx 18" above bottom sill. 71q- pit lights unguarded no car communications 100m- replace missing
Oct 12, 2010
Resolve - Class - 2
69m07,67l10,5d10,71q07. 69m- code date plate missing date 67l- communication in car not working. 15d- unsecured certificate frame pit lightsunguarded
Oct 12, 2010
Resolve
Complaints
- Heat/hot water
Entire building
Feb 19, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 19, 2026 · Apt 2D
Close - Heat/hot water
Apartment only
Feb 9, 2026 · Apt 3G
Close - Heat/hot water
Apartment only
Jan 30, 2026 · Apt 2E
Close - Heat/hot water
Apartment only
Jan 30, 2026 · Apt 4G
Close - Heat/hot water
Entire building
Jan 29, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 27, 2026 · Apt 3F
Close - Door/window
Window frame
Jan 27, 2026 · Apt 3F
Close - Heat/hot water
Entire building
Jan 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 25, 2026 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Jan 25, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 4, 2026 · Apt 3F
Close - Paint/plaster
Wall
Jan 4, 2026 · Apt 3F
Close - Heat/hot water
Entire building
Dec 12, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 13, 2025 · Apt 2D
Close - Paint/plaster
Wall
Sep 1, 2025 · Apt 4G
Close - General
Cabinet
Sep 1, 2025 · Apt 4G
Close - Plumbing
Steam pipe/riser
Aug 27, 2025 · Apt 3G
Close - Water leak
Heavy flow
Aug 27, 2025 · Apt 3G
Close - Unsanitary condition
Mold
Aug 27, 2025 · Apt 3G
Close - Water leak
Heavy flow
Aug 26, 2025 · Apt 3G
Close - Water leak
Heavy flow
Aug 22, 2025 · Apt 3G
Close - Paint/plaster
Ceiling
Aug 14, 2025 · Apt 4G
Close - Paint/plaster
Wall
Aug 14, 2025 · Apt 4G
Close - Paint/plaster
Ceiling
May 29, 2025 · Apt 2C
Close - Unsanitary condition
Sewage
May 29, 2025 · Apt 2C
Close - Flooring/stairs
Floor
May 29, 2025 · Apt 2C
Close - Paint/plaster
Wall
May 29, 2025 · Apt 2C
Close - Water leak
Heavy flow
May 7, 2025 · Apt 3G
Close - Paint/plaster
Wall
May 7, 2025 · Apt 3G
Close - Paint/plaster
Wall
May 7, 2025 · Apt 3G
Close - Paint/plaster
Ceiling
May 7, 2025 · Apt 3G
Close - Electric
No lighting
May 7, 2025 · Apt 3G
Close - Paint/plaster
Ceiling
May 7, 2025 · Apt 3G
Close - General
Bell/buzzer/intercom
May 7, 2025 · Apt 3G
Close - Plumbing
Basin/sink
Apr 25, 2025 · Apt 4B
Close - Paint/plaster
Wall
Jan 22, 2025 · Apt 3F
Close - Heat/hot water
Entire building
Nov 14, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 2, 2023 · Apt BLDG
Close - Appliance
Electric/gas range
May 28, 2023 · Apt 2E
Close - Plumbing
Basin/sink
Dec 26, 2022 · Apt 6E
Close - Heat/hot water
Apartment only
Dec 26, 2022 · Apt 6E
Close - Plumbing
Basin/sink
Dec 26, 2022 · Apt 6E
Close - Electric
No lighting
Oct 17, 2022 · Apt 4B
Close - Electric
No lighting
Oct 6, 2022 · Apt 4B
Close - Heat/hot water
Entire building
Jun 29, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 29, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 30, 2022 · Apt 3G
Close - Heat/hot water
Apartment only
Jan 28, 2022 · Apt 4G
Close - Heat/hot water
Apartment only
Jan 22, 2022 · Apt 3G
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1990
- Floors
- 6
- Residential units
- 40
- Building area
- 36,000 ft²
- Lot area
- 18,500 ft²
- Zoning
- R7-2
- Community board
- 111
- Council district
- 8
- Block / lot
- 1775 / 20
- Assessed value
- $2,842,650
- Landmark / historic district
- No
HPD registration #141021, last renewed Sep 26, 2025.
Questions about 2089 Lexington Avenue
Who owns 2089 Lexington Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Milltwee HDFC.
Does 2089 Lexington Avenue have violations?
Yes. NYC HPD has recorded 180 housing violations at this property.
Is 2089 Lexington Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2089 Lexington Avenue built?
City records list 1990 as the year it was built.
How many apartments are in 2089 Lexington Avenue?
It has 40 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.