6 East 132 Street
Manhattan, NY 10037BBL 1-01756-0067Map
Owner of record: 6 East 132 St. LLC
6 East 132 Street is a walk-up apartment building built in 1936 in Manhattan, 10037. It has 20 residential units across 5 floors. The owner of record is 6 East 132 St. LLC. HPD has recorded 74 housing violations here, most recently on March 15, 2023.
- HPD violations
- 74
- DOB violations
- 19
- ECB violations
- 25
- HPD complaints
- 40
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 74
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 15, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of exposed cable wires at ceiling at first sty public hall
Oct 7, 2016
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and walls at 1st sty public hall
Oct 7, 2016
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant ceiling and walls at 1st sty public hall
Oct 7, 2016
Closed — Violation dismissed - ANon-hazardous
§ 53, 187, 231 m/d law and department rules and regulations. provide a stop at top of guide rods so as to prevent removal of dropladder at the front fire escape
Oct 7, 2016
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 18, 5th story, 3rd apartment from south at west
Mar 30, 2016 · Apt 18
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective brickwork over 4th window from east at north at building front , 5th story
Mar 22, 2016
Closed — Violation closed - CImmediately hazardous
Properly repair the broken or defective lock and assembly at building entrance door at public hall, 1st story
Mar 22, 2016
Closed — Violation closed - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination at ceiling light fixture at public hall, 3rd story
Mar 22, 2016
Closed — Violation closed
Show 40 more ↓
- CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 1; in the entire apartment located at apt 7, 2nd story, 2nd apartment from west at north
Sep 28, 2015 · Apt 7
Closed — Violation closed - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 3, 1st story, 1st apartment from north at east
Sep 28, 2015 · Apt 3
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 3, 1st story, 1st apartment from north at east
Sep 28, 2015 · Apt 3
Closed — Violation dismissed - CImmediately hazardous
Replace with new the broken or defective medicine cabinet door mirror in the bathroom located at apt 13, 4th story, 1st apartment from south at west
Sep 28, 2015 · Apt 13
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors at bulkhead at public hall stairs, 5th story
Sep 28, 2015
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice in the entrance located at apt 6, 2nd story, 1st apartment from west at north
Sep 28, 2015 · Apt 6
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 6, 2nd story, 1st apartment from west at north
Sep 28, 2015 · Apt 6
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors .. in the entrance located at apt 3, 1st story, 1st section from north at east
Sep 28, 2015 · Apt 3
Closed — Violation dismissed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the 2nd bathroom located at apt 7, 2nd story, apartment at north
Sep 28, 2015 · Apt 7
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at shower stall in the 2nd bathroom located at apt 7, 2nd story, apartment at north
Sep 28, 2015 · Apt 7
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 8, 2nd story, 1st apartment from north at east
Sep 28, 2015 · Apt 8
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, east and south walls in the kitchen located at apt 8, 2nd story, 1st apartment from north at east
Sep 28, 2015 · Apt 8
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the kitchen located at apt 11, 3rd story, 2nd apartment from west at north
Sep 28, 2015 · Apt 11
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 11, 3rd story, 2nd apartment from west at north
Sep 28, 2015 · Apt 11
Closed — Violation closed - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 11, 3rd story, 2nd apartment from west at north
Sep 28, 2015 · Apt 11
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors .. in the entrance located at apt 10, 3rd story, 1st apartment from west at north
Sep 28, 2015 · Apt 10
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 10, 3rd story, 1st apartment from west at north
Sep 28, 2015 · Apt 10
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 10, 3rd story, 1st apartment from west at north
Sep 28, 2015 · Apt 10
Closed — Violation closed - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 13, 4th story, 1st apartment from south at west
Sep 28, 2015 · Apt 13
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 13, 4th story, 1st apartment from south at west
Sep 28, 2015 · Apt 13
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 13, 4th story, 1st apartment from south at west
Sep 28, 2015 · Apt 13
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors .. in the entrance located at apt 12, 3rd story, 1st apartment from north at east
Sep 28, 2015 · Apt 12
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors .. in the entrance located at apt 13, 4th story, 1st apartment from south at west
Sep 28, 2015 · Apt 13
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 15, 4th story, 2nd apartment from west at north
Sep 28, 2015 · Apt 15
Closed — Violation dismissed - BHazardous
Arrange and make self-closing the doors .. in the entrance located at apt 15, 4th story, 2nd apartment from west at north
Sep 28, 2015 · Apt 15
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 12, 3rd story, 1st apartment from north at east
Sep 28, 2015 · Apt 12
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors .. in the entrance located at apt 18, 5th story, 1st apartment from west at north
Sep 28, 2015 · Apt 18
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 1; in the entire apartment located at apt 18, 5th story, 1st apartment from west at north
Sep 28, 2015 · Apt 18
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors .. in the entrance located at apt 6, 2nd story, 1st apartment from west at north
Sep 28, 2015 · Apt 6
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor at radiator in the room located at b-room 15, 5th story, 2nd b-room from west at north
Apr 7, 2015 · Apt 15
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 2; in the entire apartment located at apt 4, 1st story, 1st apartment from south at west
Apr 7, 2015 · Apt 4
Closed — Violation closed - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 17, 5th story, 1st apartment from south at west
Apr 7, 2015 · Apt 17
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 17, 5th story, 1st apartment from south at west
Apr 7, 2015 · Apt 17
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 2; in the entire apartment located at apt 17, 5th story, 1st apartment from south at west
Apr 7, 2015 · Apt 17
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 1; in the room located at b-room 15, 5th story, 2nd b-room from west at north
Apr 7, 2015 · Apt 15
Closed — Violation dismissed - BHazardous
Properly secure the loose marble saddle in the bathroom located at apt 4, 1st story, 1st apartment from south at west
Apr 7, 2015 · Apt 4
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 12, 3rd story, 1st apartment from north at east
Apr 7, 2015 · Apt 12
Closed — Violation closed - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 13, 4th story, 1st apartment from south at west
Apr 7, 2015 · Apt 13
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from north located at apt 12, 3rd story, 1st apartment from north at east
Apr 7, 2015 · Apt 12
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 1; in the room located at b-room 11, 3rd story, 2nd b-room from west at north
Apr 7, 2015 · Apt 11
Closed — Violation closed
DOB building violations · 19
- Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 17, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 27, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 18, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 18, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 18, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed
Show 9 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 25
- Class - 1
Installed boiler with out proper permit (
Jul 9, 2019
Resolve - Class - 2
Failure to maintain. correct all violating conditions listed (other -improper support on flue pipe
Jul 9, 2019
Resolve - Class - 2
Failure to maintain building in code compliant manner.noted:observed at rear of building chain link fence door that serves as a mean of emergency exit that leads to 132 st does not open due to the door being ce
May 29, 2018 · Penalty $310
Resolve - Class - 2
Failure to maintain building in code compliant manner.illumination forexits,exit discharges,and public corridors per bc 1006.1;27-381.noted:existing emergency light packages on the second floor and fifth floor
May 29, 2018 · Penalty $625
Resolve - Class - 2
Failure to maintain building in code compliant manner.observed in gas meter banks room for apartments in the cellar no ventilations installed as required in the fgc.rem:repair and/or replace.
May 29, 2018 · Penalty $625
Resolve - Class - 1
Failure to proivde ubobstructed passageway at the time of inspection exp #2 chained links fence with a swing gated is chained and padlocked (2)also a vehicle is blocked the swing-gate(photo)rem:remove obstructi
Jan 8, 2018
Resolve - Class - 1
Failure to provide unobstructed exit passageway. @ time of insp, @ exp#21 & chained linked fence w/ a swing gate is chained & padlocked (2). photos. rem: remove obstruction.
Nov 22, 2017
Resolve - Class - 1
Failure to provide unobstructed exit passageway. noted: at rear of bldg exit opening in chain link fence located at exp#2,single swing gate is chained & padlocked,obstructing emergency exit. remedy: remove obst
Oct 5, 2017
Resolve - Class - 2
Failure to comply w/comm's order contained in summs/viol#35290303n issued on 08/21/17 and to file a cofc pursuant to 28-201.1 and 1rcny 102-01.for a broken flue pipe,@ rear of bldg.rem:comply w/comm's order and
Oct 5, 2017 · Penalty $800
Resolve - Class - 2
Failure to comply w/comm's order contained in summs/viol#35290303n issued on 08/21/17 and to file a cofc pursuant to 28-201.1 and 1rcny 102-01.for fire stopping,at cellar level.rem:comply w/comm's order and/or
Oct 5, 2017 · Penalty $400
Resolve
Show 15 more ↓
- Class - 2
Failure to comply w/comm's order contained in summs/viol#35290304p issued on 08/21/17 and to file a cofc pursuant to 28-201.1 and 1rcny 102-01.for storage in the gas meter room.rem:comply w/comm's order to file
Oct 5, 2017 · Penalty $800
Resolve - Class - 2
Sec. 250.68 ground clamp not accessible observed metal plate covering below grade house trap receptacle for bldg water main fixed in place w/paint & cement. also noted no handles to lift metal plate.
Aug 21, 2017
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. observed excessive storage in gas meter area approx. e section of the fgc refers. photo taken. remedy: repair &/or replace.
Aug 21, 2017 · Penalty $1,000
Resolve - Class - 1
Unapproved/unsafe/unsuitable electrical equipment,material,apparatus devices,appliance or wiring in use. observed mc cables,boxes & conduitshanging unsupported in basement stairwell open boxes & panels w/expose
Aug 21, 2017 · Penalty $1,600
Resolve - Class - 2
Electrical work does not conform to approved submitted documents/amendments. observed 1) 30-1 pole panel in basement app#m379634 calls for 20-1 pole 10-2 pole braker panel. remedy: comply w/code/conform work to
Aug 21, 2017 · Penalty $250
Resolve - Class - 2
Failure to provide(gfci)ground fault circuit interrupter protection asrequired. observed convience receptacle in use for sump pump in boilerroom.(no gfci type receptalce or breaker in use). remedy: comply with
Aug 21, 2017 · Penalty $1,200
Resolve - Class - 1
Failure to maintain bldg in code compliant manner: no fire stopping per bc 712.3;27-345. at cellar at ceiling & walls at various locations there are holes & openings around plumbing eliminating fire stopping.
Aug 21, 2017 · Penalty $250
Resolve - Class - 1
Failure to provide unobstructed exit passageway. noted: at bldg rear,exit opening in chain link fence located at exp#2,single swing gate chained & padlocked obstructed egress for fire escapes. remedy: remove
Aug 21, 2017
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. observed @ back of bldg approx. about 3' below a windor for apt. 3 a broken flue pipe fora boiler & hot water heater. this creates the posibility of a backyard
Aug 21, 2017 · Penalty $1,000
Resolve - Class - 1
Occupancy contrary to that allowed by c of o or dob records.note:hpd i card indicates 4 apts @1st fl now 1st fl converted into 3 apts,1 office w/kitchenette,reception area for guard security & cellar portion ma
Mar 4, 2014
Resolve - Class - 1
Fail to maintain bldg in code-compliant manner.note:1.no security chains @apt entry doors @various locations.2.masonry structural columns in cellar missing mortar joints.3.fpsc door to boiler room in cellar doe
Mar 4, 2014
Resolve - Class - 1
Work w/o permit.note:1st fl altered from 4 apts into 3 apts w/separate enclosed office,recreation/guard area for security & 3-pc bathroom in ( )public.in cellar laundry rm created w/1 dryer & 1/washer.full hgt
Mar 4, 2014
Resolve - Class - 1
Failure to provide a system of automatic sprinklers where required.at the time of inspection i observed that there are no automatic sprinkler system instaleld on the premises. all automatic sprinkler system mus
Jan 16, 2014
Resolve - Non-hazardous
B4a/16/21b/22c/26/39/40/43/48a/50/50a/50b/50c/50d/50e. 50-waste oil and debris in boiler room. 50a-holes in boiler room. 50b-outside base clean out door defective.50c-anti syphon valve not a highest point in oi
Jul 27, 2005
Resolve - Non-hazardous
49. clean out boiler room of all debris.
Mar 28, 1994 · Penalty $400
Resolve
Complaints
- Heat/hot water
Entire building
Nov 13, 2018 · Apt 12
Close - Heat/hot water
Entire building
Nov 5, 2018 · Apt 3
Close - Heat/hot water
Entire building
Oct 1, 2018 · Apt 18
Close - Heat/hot water
Entire building
Feb 9, 2018 · Apt 12
Close - Heat/hot water
Entire building
Feb 6, 2018 · Apt 7
Close - Heat/hot water
Entire building
Jun 14, 2017 · Apt 20
Close - Heat/hot water
Entire building
Jan 30, 2017 · Apt 12
Close - Heat/hot water
Entire building
Mar 19, 2016 · Apt 12
Close - Heat/hot water
Entire building
Mar 15, 2016 · Apt 9
Close - Heat/hot water
Entire building
Mar 8, 2016 · Apt 3
Close
Show 30 more ↓
- General
Cabinet
Feb 19, 2016 · Apt 17
Close - Plumbing
Radiator
Feb 19, 2016 · Apt 17
Close - Electric
No lighting
Feb 19, 2016 · Apt 17
Close - Paint/plaster
Wall
Feb 19, 2016 · Apt 17
Close - Flooring/stairs
Stairs
Feb 19, 2016 · Apt 17
Close - Flooring/stairs
Floor
Feb 19, 2016 · Apt 17
Close - Door/window
Door
Feb 19, 2016 · Apt 17
Close - Unsanitary condition
Pests
Feb 19, 2016 · Apt 17
Close - Paint/plaster
Wall
Feb 19, 2016 · Apt 17
Close - Heat/hot water
Apartment only
Feb 19, 2016 · Apt 17
Close - Plumbing
Radiator
Feb 19, 2016 · Apt 17
Close - Heat/hot water
Entire building
Nov 3, 2014 · Apt 4
Close - Unsanitary condition
Mold
May 5, 2014 · Apt 3
Close - Heating
Heat related
Mar 14, 2010 · Apt 15
Close - Heating
Heat related
Jan 4, 2010 · Apt 6
Close - Paint/plaster
Wall
Jul 21, 2006 · Apt 12
Close - Plumbing
Water-leaks
Jul 21, 2006 · Apt 12
Close - Appliance
Electric/gas range
Jul 21, 2006 · Apt 12
Close - Nonconst
Vermin
Jul 21, 2006 · Apt 12
Close - Appliance
Electric/gas range
Jul 11, 2006 · Apt 12
Close - Plumbing
Basin/sink
Jul 11, 2006 · Apt 12
Close - Plumbing
Toilet
Jul 11, 2006 · Apt 12
Close - Nonconst
Vermin
Jun 29, 2006 · Apt 12
Close - Plumbing
Basin/sink
Jun 29, 2006 · Apt 12
Close - Plumbing
Water-leaks
Jun 29, 2006 · Apt 12
Close - Plumbing
Water supply
Apr 26, 2005 · Apt 13
Close - General
Doors
Dec 7, 2004 · Apt 15
Close - Heating
Heat related
Dec 7, 2004 · Apt 15
Close - Paint/plaster
Wall
Aug 17, 2004 · Apt 8
Close - Paint/plaster
Wall
Aug 17, 2004 · Apt 10
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C4)
- Year built
- 1936
- Floors
- 5
- Residential units
- 20
- Building area
- 9,350 ft²
- Lot area
- 2,498 ft²
- Zoning
- R7B
- Community board
- 111
- Council district
- 9
- Block / lot
- 1756 / 67
- Assessed value
- $891,000
- Landmark / historic district
- No
HPD registration #117221, last renewed Sep 11, 2025.
Questions about 6 East 132 Street
Who owns 6 East 132 Street?
The owner of record in NYC Department of City Planning PLUTO data is 6 East 132 St. LLC.
Does 6 East 132 Street have violations?
Yes. NYC HPD has recorded 74 housing violations at this property.
Is 6 East 132 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 6 East 132 Street built?
City records list 1936 as the year it was built.
How many apartments are in 6 East 132 Street?
It has 20 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.