61 East 129 Street
Manhattan, NY 10035BBL 1-01754-0031Map
Owner of record: Aim Realty And Development LLC
61 East 129 Street is a government building built in 1910 in Manhattan, 10035. It has 9 residential units across 3 floors. The owner of record is Aim Realty And Development LLC. HPD has recorded 11 housing violations here, most recently on August 29, 2025. 2 of the 11 most recent violations are still open.
- HPD violations
- 11
- DOB violations
- 3
- ECB violations
- 0
- HPD complaints
- 14
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 11
- CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall
Aug 29, 2025
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall
Aug 29, 2025
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall
Aug 29, 2025
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall
Aug 29, 2025
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 3a, 3rd story, 1st apartment from east at south
Aug 29, 2025 · Apt 3A
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at ceiling in the bathroom located at apt 3a, 3rd story, 1st apartment from east at south
Aug 29, 2025 · Apt 3A
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall
Aug 29, 2025
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Aug 29, 2025
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall
Aug 29, 2025
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Aug 29, 2025
Closed — Violation dismissed
Show 1 more ↓
- BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following minimum of 100 watts as required(light fixture(s) present). at front areaway
Jun 12, 2018
Open — Nov sent out
DOB building violations · 3
- Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- General
Janitor/super
Jan 25, 2026 · Apt 3A
Close - Unsanitary condition
Garbage/recycling storage
Jan 25, 2026 · Apt 3A
Close - Unsanitary condition
Garbage/recycling storage
Jan 25, 2026 · Apt 3A
Close - General
Janitor/super
Dec 27, 2025 · Apt 3A
Close - Unsanitary condition
Garbage/recycling storage
Jul 21, 2025 · Apt 3A
Close - Door/window
Door
Apr 5, 2025 · Apt 3A
Close - General
Janitor/super
Oct 24, 2024 · Apt 3A
Close - General
Bell/buzzer/intercom
Oct 24, 2024 · Apt 3A
Close - Door/window
Door
Sep 25, 2024 · Apt 3A
Close - Unsanitary condition
Garbage/recycling storage
Sep 17, 2024 · Apt 3A
Close
Show 4 more ↓
- General
Bell/buzzer/intercom
Sep 17, 2024 · Apt 3A
Close - Door/window
Door
Sep 17, 2024 · Apt 3A
Close - Electric
Power outage
Aug 1, 2024 · Apt 2A
Close - Heating
Heat related
Jan 28, 2009 · Apt 5C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Government building (Y4)
- Year built
- 1910
- Floors
- 3
- Residential units
- 9
- Building area
- 2,760 ft²
- Lot area
- 1,998 ft²
- Zoning
- R7B
- Community board
- 111
- Council district
- 9
- Block / lot
- 1754 / 31
- Assessed value
- $60,300
- Landmark / historic district
- No
HPD registration #145338, last renewed Aug 6, 2025.
Questions about 61 East 129 Street
Who owns 61 East 129 Street?
The owner of record in NYC Department of City Planning PLUTO data is Aim Realty And Development LLC.
Does 61 East 129 Street have violations?
Yes. NYC HPD has recorded 11 housing violations at this property.
Is 61 East 129 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 61 East 129 Street built?
City records list 1910 as the year it was built.
How many apartments are in 61 East 129 Street?
It has 9 residential units and 10 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.