180 Lenox Avenue
Manhattan, NY 10026BBL 1-01718-0001Map
Owner of record: NYC Housing Authority
180 Lenox Avenue is an elevator apartment building built in 1899 in Manhattan, 10026. It has 46 residential units across 7 floors. The owner of record is NYC Housing Authority. HPD has recorded 26 housing violations here, most recently on April 29, 2026. 7 of the 26 most recent violations are still open.
- HPD violations
- 26
- DOB violations
- 21
- ECB violations
- 13
- HPD complaints
- 33
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 26
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2a, 2nd story, 1st apartment from east at south
Apr 8, 2026 · Apt 2A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 2nd story, 1st apartment from east at south
Apr 8, 2026 · Apt 2A
Closed — Violation dismissed - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... greater than 30 sq ft at south and east walls in the 1st room from north at east located at apt 2a, 2nd story, 1st apartment from east at south
Apr 8, 2026 · Apt 2A
Open — Notice of issuance sent to tenant - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color west wall in the kitchen located at apt 2a, 2nd story, 1st apartment from east at south
Apr 8, 2026 · Apt 2A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color north and west wall in the bathroom located at apt 2a, 2nd story, 1st apartment from east at south
Apr 8, 2026 · Apt 2A
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2a, 2nd story, 1st apartment from east at south
Apr 8, 2026 · Apt 2A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and all walls in the 1st room from north at east located at apt 2a, 2nd story, 2nd apartment from west at north
Mar 30, 2026 · Apt 2A
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at north wall in the 1st room from north at west located at apt 2a, 2nd story, 2nd apartment from west at north
Mar 30, 2026 · Apt 2A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and all walls in the 1st room from north at west located at apt 2a, 2nd story, 2nd apartment from west at north
Mar 30, 2026 · Apt 2A
Closed — Violation dismissed
Show 16 more ↓
- CImmediately hazardous
M/d law abate the nuisance consisting of household items obstructing egress to fire escape window in the 1st room from north at west located at apt 2a, 2nd story, 2nd apartment from west at north
Mar 30, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroom located at apt 2a, 2nd story, 2nd apartment from west at north
Mar 30, 2026 · Apt 2A
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the bathroom located at apt 2a, 2nd story, 2nd apartment from west at north
Mar 30, 2026 · Apt 2A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at north wall at public hall, 2nd story
Mar 30, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north wall at public hall, 2nd story
Mar 30, 2026
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at north wall at public hall, 1st story
Mar 30, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north wall at public hall, 1st story
Mar 30, 2026
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2a, 2nd story, 2nd apartment from west at north
Mar 30, 2026 · Apt 2A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the kitchen located at apt 2a, 2nd story, 2nd apartment from west at north
Mar 30, 2026 · Apt 2A
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the foyer located at apt 2a, 2nd story, 2nd apartment from west at north
Mar 30, 2026 · Apt 2A
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2a, 2nd story, 2nd apartment from west at north
Mar 30, 2026 · Apt 2A
Closed — Violation dismissed - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... over 30 square feet at north and east walls in the 1st room from north at east located at apt 2a, 2nd story, 2nd apartment from west at north
Mar 30, 2026 · Apt 2A
Open — Invalid certification - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and north wall at public hall, 1st story
Jan 20, 2026
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and north wall at public hall, 1st story
Jan 20, 2026
Closed — Violation dismissed - BHazardous
Replace with new the missing door to wall cabinet in the kitchen located at apt 1c, 1st story, 1st apartment from west at north
Dec 7, 2011 · Apt 1C
Open — Nov sent out - BHazardous
Properly repair the broken or defective upper window sash in the 1st room from east located at apt 1c, 1st story, 1st apartment from west at north
Dec 7, 2011 · Apt 1C
Open — Nov sent out
DOB building violations · 21
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - active - Construction other optional
Potential for exterior wall collapse at exp #4 of property 186 lenox ave, a vacate order is issued for egress path at rear of 95 w 119th st. egress path extends from cellar @ exp #3 to exp #1 egress door @ street elevation. vacate order is to include both fire-escapes @ exp #3 due to their proximity to exterior wall of 186 lenox.
Nov 16, 2022
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2017 cat 1 insp/tst
Sep 6, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Aug 16, 2016
Dob violation - active - Facade facade optional
Cycle 7 unsafe report filed
Dec 10, 2013
Dob violation - active
Show 11 more ↓
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 7b technical report by 08/21/2012
Aug 30, 2013
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Facade facade optional
Ll11/98-local law 11/98 - facade facade optional
Jan 29, 2004
Dob violation - dismissed - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Electric signs none
Es-electric signs none
Apr 29, 1998
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 1, 1994
Dob violation - dismissed - Elevator elevatorrequired
(51) repair pit light (52) repair door gibs
Feb 21, 1989
Dob violation - resolved
ECB violations · 13
- Class - 2
At time of inspection of 6 story mixed use building with sidewalk shed in place not maintained per code 1. mudsills rotting/missing causing hazardous conditions.maintain per code specifications.
Dec 9, 2024 · Penalty $6,000
Resolve - Class - 2
Burnham boiler model snsl 60 has a slight water leak at rear base of the boiler. correct violating condition & submit a certificate of correction.
Sep 12, 2024 · Penalty $625
Resolve - Class - 2
At time of inspection of 6 story mixed use building observed sidewalk shed in place not maintained per code specifications mudsills rotted causing hazardous conditions.maintain
Jul 26, 2024 · Penalty $2,400
Resolve - Class - 2
Failure to submit an acceptable required cycle 9b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#906149.rem:submit acceptable required t
Apr 11, 2024 · Penalty $1,250
Active - Class - 2
At time of inspection of 6 story mixed use building observed sidewalk shed in place missing the required extention on lenox ave side of the building as required by 3307.6.3add extention
Aug 24, 2023 · Penalty $2,400
Resolve - Class - 2
Pedestrian protection doesn't meet code specs. noted: @ time of inspection sidewalk shed doesn't extend 5 ft past the bldg on the right hand(east) side.rem:conform shed to code specs.
May 24, 2016
Resolve - Class - 2
Temporary construction equipment on site expired permit.noted:@ time of inspection permit for sidewalk shed expired on 01/14/12.rem:renew shed permit
May 24, 2016
Resolve - Class - 1
Failure to take & provide safety measure/sidewalk shed, netting, etc. where require to protect & secure public safety from- documented unsafe facade as per 1rcny-102-04. note: west elevation exp#2, observed pro
Feb 22, 2016
Resolve - Class - 2
Failure to provide approved plans @ job site @ time of inspec.no plan available for alt 2 #120981688 on site @ time of inspec.rem:provide approved plan @ job site.call 718-286-0683 for reinspection.
Apr 30, 2012
Resolve - Class - 2
Work w/o a permit. noted: sidewalk shed has been installed at exp 1 & 2 and dob records show no permit for sidewalk shed has been issued. remedy: obtain permit for shed.
Jun 29, 2010 · Penalty $2,500
Resolve
Show 3 more ↓
- Class - 2
Failure to submit an acceptable 6th round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the department of buildings
Dec 26, 2008
Resolve - Hazardous
Failure to file an amended fifth round report acceptable to this department idicating correction of unsafe conditions described in initial local law 11/98 report.remedy:file an amended report following remedial
May 26, 2004
Resolve - Hazardous
Failure to file an amended fifth round report acceptable to this department indicating correction of unsafe conditions described in initial local law round 5 11/98 report.remedy:fike an amended report following
Mar 26, 2004
Resolve
Complaints
- Water leak
Heavy flow
Jun 16, 2026 · Apt 2A
Close - Unsanitary condition
Pests
Jun 16, 2026 · Apt 2A
Close - Water leak
Heavy flow
Jun 15, 2026 · Apt 2A
Close - Appliance
Refrigerator
Jun 15, 2026 · Apt 2A
Close - Unsanitary condition
Pests
Jun 15, 2026 · Apt 2A
Close - Plumbing
Water supply
Apr 26, 2026 · Apt 5E
Close - Plumbing
Water supply
Apr 26, 2026 · Apt 5E
Close - Plumbing
Water supply
Apr 21, 2026 · Apt 5G
Close - Unsanitary condition
Mold
Apr 6, 2026 · Apt 2A
Close - Unsanitary condition
Pests
Apr 6, 2026 · Apt 2A
Close
Show 23 more ↓
- Unsanitary condition
Mold
Mar 26, 2026 · Apt 2A
Close - Water leak
Slow leak
Mar 26, 2026 · Apt 2A
Close - Paint/plaster
Wall
Mar 26, 2026 · Apt 2A
Close - Appliance
Refrigerator
Mar 26, 2026 · Apt 2A
Close - Water leak
Slow leak
Feb 23, 2026 · Apt 1B
Close - Plumbing
Basin/sink
Feb 17, 2026 · Apt 2A
Close - Unsanitary condition
Mold
Feb 17, 2026 · Apt 2A
Close - Heat/hot water
Entire building
Feb 9, 2026 · Apt 2A
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt 7G
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt 5E
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 7, 2026 · Apt 5E
Close - Heat/hot water
Entire building
Feb 7, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 31, 2026 · Apt 5E
Close - Plumbing
Radiator
Jan 31, 2026 · Apt 5E
Close - Heat/hot water
Apartment only
Jan 27, 2026 · Apt 5E
Close - Heat/hot water
Apartment only
Jan 25, 2026 · Apt 6G
Close - Heat/hot water
Entire building
Jan 25, 2026 · Apt 2A
Close - Heat/hot water
Entire building
Jan 25, 2026 · Apt 5G
Close - Heat/hot water
Entire building
Jan 24, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 24, 2026 · Apt 6G
Close - Plumbing
Water supply
Jan 17, 2026 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 1899
- Floors
- 7
- Residential units
- 46
- Building area
- 38,178 ft²
- Lot area
- 6,432 ft²
- Zoning
- R7-2
- Community board
- 110
- Council district
- 9
- Block / lot
- 1718 / 1
- Assessed value
- $1,657,800
- Landmark / historic district
- Mount Morris Park Historic District
HPD registration #145390, last renewed Jul 31, 2026.
Questions about 180 Lenox Avenue
Who owns 180 Lenox Avenue?
The owner of record in NYC Department of City Planning PLUTO data is NYC Housing Authority.
Does 180 Lenox Avenue have violations?
Yes. NYC HPD has recorded 26 housing violations at this property.
Is 180 Lenox Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 180 Lenox Avenue built?
City records list 1899 as the year it was built.
How many apartments are in 180 Lenox Avenue?
It has 46 residential units and 49 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.