roofy

180 Lenox Avenue

Manhattan, NY 10026BBL 1-01718-0001Map

Owner of record: NYC Housing Authority

180 Lenox Avenue is an elevator apartment building built in 1899 in Manhattan, 10026. It has 46 residential units across 7 floors. The owner of record is NYC Housing Authority. HPD has recorded 26 housing violations here, most recently on April 29, 2026. 7 of the 26 most recent violations are still open.

HPD violations
26
DOB violations
21
ECB violations
13
HPD complaints
33

What to know

Concern
3 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Apr 29, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 26

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 29, 2026

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2a, 2nd story, 1st apartment from east at south

    Apr 8, 2026 · Apt 2A

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 2nd story, 1st apartment from east at south

    Apr 8, 2026 · Apt 2A

    Closed — Violation dismissed
  • C

    Trace and repair the source and abate the visible mold condition... greater than 30 sq ft at south and east walls in the 1st room from north at east located at apt 2a, 2nd story, 1st apartment from east at south

    Apr 8, 2026 · Apt 2A

    Open — Notice of issuance sent to tenant
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color west wall in the kitchen located at apt 2a, 2nd story, 1st apartment from east at south

    Apr 8, 2026 · Apt 2A

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color north and west wall in the bathroom located at apt 2a, 2nd story, 1st apartment from east at south

    Apr 8, 2026 · Apt 2A

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2a, 2nd story, 1st apartment from east at south

    Apr 8, 2026 · Apt 2A

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling and all walls in the 1st room from north at east located at apt 2a, 2nd story, 2nd apartment from west at north

    Mar 30, 2026 · Apt 2A

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 square feet at north wall in the 1st room from north at west located at apt 2a, 2nd story, 2nd apartment from west at north

    Mar 30, 2026 · Apt 2A

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling and all walls in the 1st room from north at west located at apt 2a, 2nd story, 2nd apartment from west at north

    Mar 30, 2026 · Apt 2A

    Closed — Violation dismissed
Show 16 more ↓
  • C

    M/d law abate the nuisance consisting of household items obstructing egress to fire escape window in the 1st room from north at west located at apt 2a, 2nd story, 2nd apartment from west at north

    Mar 30, 2026 · Apt 2A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroom located at apt 2a, 2nd story, 2nd apartment from west at north

    Mar 30, 2026 · Apt 2A

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective light fixture at ceiling in the bathroom located at apt 2a, 2nd story, 2nd apartment from west at north

    Mar 30, 2026 · Apt 2A

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective fire retardant material at north wall at public hall, 2nd story

    Mar 30, 2026

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at north wall at public hall, 2nd story

    Mar 30, 2026

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective fire retardant material at north wall at public hall, 1st story

    Mar 30, 2026

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at north wall at public hall, 1st story

    Mar 30, 2026

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2a, 2nd story, 2nd apartment from west at north

    Mar 30, 2026 · Apt 2A

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the kitchen located at apt 2a, 2nd story, 2nd apartment from west at north

    Mar 30, 2026 · Apt 2A

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the foyer located at apt 2a, 2nd story, 2nd apartment from west at north

    Mar 30, 2026 · Apt 2A

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2a, 2nd story, 2nd apartment from west at north

    Mar 30, 2026 · Apt 2A

    Closed — Violation dismissed
  • C

    Trace and repair the source and abate the visible mold condition... over 30 square feet at north and east walls in the 1st room from north at east located at apt 2a, 2nd story, 2nd apartment from west at north

    Mar 30, 2026 · Apt 2A

    Open — Invalid certification
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling and north wall at public hall, 1st story

    Jan 20, 2026

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling and north wall at public hall, 1st story

    Jan 20, 2026

    Closed — Violation dismissed
  • B

    Replace with new the missing door to wall cabinet in the kitchen located at apt 1c, 1st story, 1st apartment from west at north

    Dec 7, 2011 · Apt 1C

    Open — Nov sent out
  • B

    Properly repair the broken or defective upper window sash in the 1st room from east located at apt 1c, 1st story, 1st apartment from west at north

    Dec 7, 2011 · Apt 1C

    Open — Nov sent out

DOB building violations · 21

  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9b technical report by 2/21/2023

    Feb 22, 2023

    Dob violation - active
  • Construction other optional

    Potential for exterior wall collapse at exp #4 of property 186 lenox ave, a vacate order is issued for egress path at rear of 95 w 119th st. egress path extends from cellar @ exp #3 to exp #1 egress door @ street elevation. vacate order is to include both fire-escapes @ exp #3 due to their proximity to exterior wall of 186 lenox.

    Nov 16, 2022

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to nycha elevator - fail to correct defects on 2017 cat 1 insp/tst

    Sep 6, 2019

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Aug 16, 2016

    Dob violation - active
  • Facade facade optional

    Cycle 7 unsafe report filed

    Dec 10, 2013

    Dob violation - active
Show 11 more ↓
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7b technical report by 08/21/2012

    Aug 30, 2013

    Dob violation - dismissed
  • Facade facade optional

    Ll1198-local law 11/98 - facade facade optional

    Nov 30, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Facade facade optional

    Ll11/98-local law 11/98 - facade facade optional

    Jan 29, 2004

    Dob violation - dismissed
  • Facade facade required

    L1198-local law 11/98 - facade facade required

    Aug 8, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Electric signs none

    Es-electric signs none

    Apr 29, 1998

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 1, 1994

    Dob violation - dismissed
  • Elevator elevatorrequired

    (51) repair pit light (52) repair door gibs

    Feb 21, 1989

    Dob violation - resolved

ECB violations · 13

  • Class - 2

    At time of inspection of 6 story mixed use building with sidewalk shed in place not maintained per code 1. mudsills rotting/missing causing hazardous conditions.maintain per code specifications.

    Dec 9, 2024 · Penalty $6,000

    Resolve
  • Class - 2

    Burnham boiler model snsl 60 has a slight water leak at rear base of the boiler. correct violating condition & submit a certificate of correction.

    Sep 12, 2024 · Penalty $625

    Resolve
  • Class - 2

    At time of inspection of 6 story mixed use building observed sidewalk shed in place not maintained per code specifications mudsills rotted causing hazardous conditions.maintain

    Jul 26, 2024 · Penalty $2,400

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 9b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#906149.rem:submit acceptable required t

    Apr 11, 2024 · Penalty $1,250

    Active
  • Class - 2

    At time of inspection of 6 story mixed use building observed sidewalk shed in place missing the required extention on lenox ave side of the building as required by 3307.6.3add extention

    Aug 24, 2023 · Penalty $2,400

    Resolve
  • Class - 2

    Pedestrian protection doesn't meet code specs. noted: @ time of inspection sidewalk shed doesn't extend 5 ft past the bldg on the right hand(east) side.rem:conform shed to code specs.

    May 24, 2016

    Resolve
  • Class - 2

    Temporary construction equipment on site expired permit.noted:@ time of inspection permit for sidewalk shed expired on 01/14/12.rem:renew shed permit

    May 24, 2016

    Resolve
  • Class - 1

    Failure to take & provide safety measure/sidewalk shed, netting, etc. where require to protect & secure public safety from- documented unsafe facade as per 1rcny-102-04. note: west elevation exp#2, observed pro

    Feb 22, 2016

    Resolve
  • Class - 2

    Failure to provide approved plans @ job site @ time of inspec.no plan available for alt 2 #120981688 on site @ time of inspec.rem:provide approved plan @ job site.call 718-286-0683 for reinspection.

    Apr 30, 2012

    Resolve
  • Class - 2

    Work w/o a permit. noted: sidewalk shed has been installed at exp 1 & 2 and dob records show no permit for sidewalk shed has been issued. remedy: obtain permit for shed.

    Jun 29, 2010 · Penalty $2,500

    Resolve
Show 3 more ↓
  • Class - 2

    Failure to submit an acceptable 6th round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the department of buildings

    Dec 26, 2008

    Resolve
  • Hazardous

    Failure to file an amended fifth round report acceptable to this department idicating correction of unsafe conditions described in initial local law 11/98 report.remedy:file an amended report following remedial

    May 26, 2004

    Resolve
  • Hazardous

    Failure to file an amended fifth round report acceptable to this department indicating correction of unsafe conditions described in initial local law round 5 11/98 report.remedy:fike an amended report following

    Mar 26, 2004

    Resolve

Complaints

  • Water leak

    Heavy flow

    Jun 16, 2026 · Apt 2A

    Close
  • Unsanitary condition

    Pests

    Jun 16, 2026 · Apt 2A

    Close
  • Water leak

    Heavy flow

    Jun 15, 2026 · Apt 2A

    Close
  • Appliance

    Refrigerator

    Jun 15, 2026 · Apt 2A

    Close
  • Unsanitary condition

    Pests

    Jun 15, 2026 · Apt 2A

    Close
  • Plumbing

    Water supply

    Apr 26, 2026 · Apt 5E

    Close
  • Plumbing

    Water supply

    Apr 26, 2026 · Apt 5E

    Close
  • Plumbing

    Water supply

    Apr 21, 2026 · Apt 5G

    Close
  • Unsanitary condition

    Mold

    Apr 6, 2026 · Apt 2A

    Close
  • Unsanitary condition

    Pests

    Apr 6, 2026 · Apt 2A

    Close
Show 23 more ↓
  • Unsanitary condition

    Mold

    Mar 26, 2026 · Apt 2A

    Close
  • Water leak

    Slow leak

    Mar 26, 2026 · Apt 2A

    Close
  • Paint/plaster

    Wall

    Mar 26, 2026 · Apt 2A

    Close
  • Appliance

    Refrigerator

    Mar 26, 2026 · Apt 2A

    Close
  • Water leak

    Slow leak

    Feb 23, 2026 · Apt 1B

    Close
  • Plumbing

    Basin/sink

    Feb 17, 2026 · Apt 2A

    Close
  • Unsanitary condition

    Mold

    Feb 17, 2026 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Feb 9, 2026 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Feb 8, 2026 · Apt 7G

    Close
  • Heat/hot water

    Entire building

    Feb 8, 2026 · Apt 5E

    Close
  • Heat/hot water

    Entire building

    Feb 8, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 8, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 7, 2026 · Apt 5E

    Close
  • Heat/hot water

    Entire building

    Feb 7, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 31, 2026 · Apt 5E

    Close
  • Plumbing

    Radiator

    Jan 31, 2026 · Apt 5E

    Close
  • Heat/hot water

    Apartment only

    Jan 27, 2026 · Apt 5E

    Close
  • Heat/hot water

    Apartment only

    Jan 25, 2026 · Apt 6G

    Close
  • Heat/hot water

    Entire building

    Jan 25, 2026 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Jan 25, 2026 · Apt 5G

    Close
  • Heat/hot water

    Entire building

    Jan 24, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 24, 2026 · Apt 6G

    Close
  • Plumbing

    Water supply

    Jan 17, 2026 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D7)
Year built
1899
Floors
7
Residential units
46
Building area
38,178 ft²
Lot area
6,432 ft²
Zoning
R7-2
Community board
110
Council district
9
Block / lot
1718 / 1
Assessed value
$1,657,800
Landmark / historic district
Mount Morris Park Historic District

HPD registration #145390, last renewed Jul 31, 2026.

Questions about 180 Lenox Avenue

Who owns 180 Lenox Avenue?

The owner of record in NYC Department of City Planning PLUTO data is NYC Housing Authority.

Does 180 Lenox Avenue have violations?

Yes. NYC HPD has recorded 26 housing violations at this property.

Is 180 Lenox Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 180 Lenox Avenue built?

City records list 1899 as the year it was built.

How many apartments are in 180 Lenox Avenue?

It has 46 residential units and 49 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.