roofy

216 East 117 Street

Manhattan, NY 10035BBL 1-01666-0040Map

Owner of record: Yang, Jackson

216 East 117 Street is a mixed residential and retail building built in 1910 in Manhattan, 10035. It has 3 residential units across 4 floors. The owner of record is Yang, Jackson. HPD has recorded 72 housing violations here, most recently on April 1, 2024.

HPD violations
72
DOB violations
5
ECB violations
0
HPD complaints
22

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Apr 1, 2024

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 72

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 1, 2024

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective at vestiblue

    Aug 19, 2022

    Closed — Violation dismissed
  • C

    Properly repair with similar material the broken or defective ... porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 2, 3rd story, 1st apartment from south at west

    Aug 12, 2022 · Apt 2

    Closed — Violation dismissed
  • B

    Replace with new the broken or defective ...marble saddle at the vestibule door , 1st story

    Aug 12, 2022

    Closed — Violation dismissed
  • B

    Replace with new the broken or defective ...broken marble saddle at the building entrance door , 1st story

    Aug 12, 2022

    Closed — Violation dismissed
  • C

    Provide an adequate supply of gas to the fixtures at range in the entire apartment located at apt 2, 3rd story, 1st apartment from south at west

    Apr 30, 2022 · Apt 2

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2, 3rd story, 1st apartment from south at west

    Apr 30, 2022 · Apt 2

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor ... at public hall, 1st story

    Apr 30, 2022

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall, 1st window frame from east at south wall in the kitchen located at apt 2, 3rd story, 1st apartment from south at west

    Mar 22, 2022 · Apt 2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) wainscotting at north wall, 1st window frame from west at north wall in the 1st room from north at east located at apt 2, 3rd story, 1st apartment from south at west

    Mar 22, 2022 · Apt 2

    Closed — Violation closed
Show 40 more ↓
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, west wall, ceiling in the 1st room from north at east located at apt 2, 3rd story, 1st apartment from south at west

    Mar 22, 2022 · Apt 2

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, east wall, ceiling in the 2nd room from north located at apt 2, 3rd story, 1st apartment from south at west

    Mar 22, 2022 · Apt 2

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2, 3rd story, 1st apartment from south at west

    Mar 22, 2022 · Apt 2

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2, 3rd story, 1st apartment from south at west

    Mar 22, 2022 · Apt 2

    Closed — Violation closed
  • B

    Repair or replace the smoke detector inoperative in the entire apartment located at apt 2, 3rd story, 1st apartment from south at west

    Mar 22, 2022 · Apt 2

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). inoperative in the entire apartment located at apt 2, 3rd story, 1st apartment from south at west

    Mar 22, 2022 · Apt 2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) west wall, 1st window frame from south at west wall in the 2nd room from north located at apt 2, 3rd story, 1st apartment from south at west

    Mar 22, 2022 · Apt 2

    Closed — Violation closed
  • C

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 2, 3rd story, 1st apartment from south at west

    Mar 12, 2022 · Apt 2

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). deffective in the entire apartment located at apt 2, 3rd story, 1st apartment from south at west

    Mar 12, 2022 · Apt 2

    Closed — Violation closed
  • B

    Repair or replace the smoke detector deffective in the entire apartment located at apt 2, 3rd story, 1st apartment from south at west

    Mar 12, 2022 · Apt 2

    Closed — Violation closed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Feb 28, 2022

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). inoperable located at apt 2, 3rd story, 1st apartment from south at west

    Feb 28, 2022 · Apt 2

    Closed — Violation closed
  • B

    M/d law abate the nuisance consisting of key operated lock installed at door leading to fire escape window in the 1st room from north at east located at apt 2, 3rd story, 1st apartment from south at west

    Feb 28, 2022 · Apt 2

    Closed — Violation closed
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate ... in the 1st room from north at east located at apt 2, 3rd story, 1st apartment from south at west

    Feb 28, 2022 · Apt 2

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.

    Feb 28, 2022

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Feb 28, 2022

    Closed — Violation closed
  • B

    Repair or replace the smoke detector inoperable located at apt 2, 3rd story, 1st apartment from south at west

    Feb 28, 2022 · Apt 2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the 2nd room from north located at apt 2, 3rd story, 1st apartment from south at west

    Feb 28, 2022 · Apt 2

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2, 3rd story, 1st apartment from south at west

    Feb 28, 2022 · Apt 2

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor ... at public hall, 1st story

    Feb 28, 2022

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Feb 28, 2022

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 15, 2022

    Closed — Violation dismissed
  • C

    Provide an adequate supply of gas to the fixtures at cooking gas range in the kitchen located at apt 2, 3rd story, 1st apartment from south at west

    Feb 1, 2022 · Apt 2

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2, 3rd story, 1st apartment from south at west

    Feb 1, 2022 · Apt 2

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2, 3rd story, 1st apartment from south at west

    Feb 1, 2022 · Apt 2

    Closed — Violation closed
  • B

    Repair or replace the smoke detector inoperaative in the entire apartment located at apt 2, 3rd story, 1st apartment from south at west

    Feb 1, 2022 · Apt 2

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). inoperative in the entire apartment located at apt 2, 3rd story, 1st apartment from south at west

    Feb 1, 2022 · Apt 2

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 2, 3rd story, 1st apartment from south at west

    Feb 1, 2022 · Apt 2

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 3rd story, 1st apartment from south at west

    Feb 1, 2022 · Apt 2

    Closed — Violation closed
  • A

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2, 3rd story, 1st apartment from south at west

    Feb 1, 2022 · Apt 2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the 1st room from north at east located at apt 2, 3rd story, 1st apartment from south at west

    Feb 1, 2022 · Apt 2

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from north at east wall, 1st door from north at east wall in the 1st room from north at west located at apt 2, 3rd story, 1st apartment from south at west

    Feb 1, 2022 · Apt 2

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from south at west wall, 1st door from south at west wall in the 1st room from north at east located at apt 2, 3rd story, 1st apartment from south at west

    Feb 1, 2022 · Apt 2

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 2, 3rd story, 1st apartment from south at west

    Feb 1, 2022 · Apt 2

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, east wall, ceiling in the 1st room from north at west located at apt 2, 3rd story, 1st apartment from south at west

    Feb 1, 2022 · Apt 2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) east wall, 1st window frame from south at west wall in the 2nd room from north located at apt 2, 3rd story, 1st apartment from south at west

    Feb 1, 2022 · Apt 2

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system locked boiler room door at cellar

    Feb 1, 2022

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall, 2nd window frame from west at north wall in the 1st room from north at west located at apt 2, 3rd story, 1st apartment from south at west

    Feb 1, 2022 · Apt 2

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from north at east, the bathroom , the 1st private hallway from north located at apt 2, 3rd story, 1st apartment from south at west

    Feb 1, 2022 · Apt 2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the kitchen located at apt 2, 3rd story, 1st apartment from south at west

    Feb 1, 2022 · Apt 2

    Closed — Violation closed

DOB building violations · 5

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed

ECB violations · 0

No ECB violations on record

Complaints

  • Paint/plaster

    Wall

    Apr 15, 2022 · Apt 2

    Close
  • General

    Cooking gas

    Apr 15, 2022 · Apt 2

    Close
  • Paint/plaster

    Wall

    Feb 3, 2022 · Apt 2

    Close
  • Plumbing

    Basin/sink

    Feb 3, 2022 · Apt 2

    Close
  • Unsanitary condition

    Mold

    Feb 3, 2022 · Apt 2

    Close
  • Unsanitary condition

    Pests

    Feb 3, 2022 · Apt 2

    Close
  • Flooring/stairs

    Floor

    Feb 3, 2022 · Apt 2

    Close
  • Door/window

    Door

    Feb 3, 2022 · Apt 2

    Close
  • General

    Cooking gas

    Feb 3, 2022 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Jan 31, 2022 · Apt 2

    Close
Show 12 more ↓
  • General

    Cooking gas

    Jan 31, 2022 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Jan 20, 2022 · Apt 2

    Close
  • Heat/hot water

    Entire building

    Jan 20, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 18, 2022 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Dec 12, 2021 · Apt 2

    Close
  • Heat/hot water

    Entire building

    Dec 10, 2021 · Apt 2FL

    Close
  • Heat/hot water

    Apartment only

    Dec 10, 2021 · Apt 2

    Close
  • Electric

    Power outage

    Jul 21, 2015 · Apt 2

    Close
  • General

    Doors

    Jul 5, 2005 · Apt 1

    Close
  • Plumbing

    Basin/sink

    Jul 5, 2005 · Apt 1

    Close
  • Paint/plaster

    Wall

    Jul 5, 2005 · Apt 1

    Close
  • General

    Ceramic-tile

    Jul 5, 2005 · Apt 1

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Mixed residential and retail building (S3)
Year built
1910
Floors
4
Residential units
3
Building area
5,000 ft²
Lot area
2,018 ft²
Zoning
R7A
Community board
111
Council district
8
Block / lot
1666 / 40
Assessed value
$484,200
Landmark / historic district
No

HPD registration #117704, last renewed Sep 5, 2025.

Questions about 216 East 117 Street

Who owns 216 East 117 Street?

The owner of record in NYC Department of City Planning PLUTO data is Yang, Jackson.

Does 216 East 117 Street have violations?

Yes. NYC HPD has recorded 72 housing violations at this property.

Is 216 East 117 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 216 East 117 Street built?

City records list 1910 as the year it was built.

How many apartments are in 216 East 117 Street?

It has 3 residential units and 4 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.