211 East 116 Street
Manhattan, NY 10029BBL 1-01666-0007Map
Owner of record: Alm 215 Realty Corp.
211 East 116 Street is a mixed residential and retail building built in 1910 in Manhattan, 10029. It has 2 residential units across 4 floors. The owner of record is Alm 215 Realty Corp.. HPD has recorded 118 housing violations here, most recently on August 10, 2007. 6 of the 50 most recent violations are still open.
- HPD violations
- 118
- DOB violations
- 7
- ECB violations
- 8
- HPD complaints
- 263
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 118
- BHazardous
Remove all encumbrances consisting of excessive boxes of food and boxes of mazola oil at public hall, 1st story
Aug 10, 2007
Closed — Violation dismissed - BHazardous
Repair or replace smoke detector defective in the entire apartment located at apt 3, 4th story, 1st apartment from north at east
Aug 3, 2007 · Apt 3
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls and ceiling in the entire apartment located at apt 3, 4th story, 1st apartment from north at east
Aug 3, 2007 · Apt 3
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3, 4th story, 1st apartment from north at east
Aug 3, 2007 · Apt 3
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective counter balance lower sash center window in the 4th room from north located at apt 3, 4th story, 1st apartment from north at east
Apr 10, 2007 · Apt 3
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling and walls in the entire apartment located at apt 3, 4th story, 1st apartment from north at east
Apr 10, 2007 · Apt 3
Closed — Violation closed - ANon-hazardous
Properly repair the broken or defective bell system in the entrance located at apt 3, 4th story, 1st apartment from north at east
Apr 10, 2007 · Apt 3
Open — Not complied with - BHazardous
Abate the nuisance consisting of moisture penetrating skylight roof bulkhead at public hall
Apr 10, 2007
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor at public hall, 1st story
Apr 10, 2007
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over ceiling in the entire apartment located at apt 3, 4th story, 1st apartment from north at east
Apr 10, 2007 · Apt 3
Closed — Violation closed
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 2nd room from north located at apt 2, 3rd story, 1st apartment from north at east
Oct 24, 2006 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the kitchen located at apt 2, 3rd story, 1st apartment from north at east
Oct 24, 2006 · Apt 2
Closed — Violation closed - ANon-hazardous
Replace with new the missing bell-buzzer/intercom in the entrance located at apt 2, 3rd story, 1st apartment from north at east
Oct 24, 2006 · Apt 2
Open — Not complied with - BHazardous
Abate the nuisance consisting of vermin mice in the entire apartment located at apt 2, 3rd story, 1st apartment from north at east
Oct 24, 2006 · Apt 2
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and walls in the entire apartment located at apt 2, 3rd story, 1st apartment from north at east
Oct 24, 2006 · Apt 2
Closed — Violation closed - BHazardous
Abate the nuisance consisting of vermin mice located at apt 2, 2nd story, apartment at north
Aug 18, 2006 · Apt 2
Open — First no access to re- inspect violation - BHazardous
Abate the nuisance consisting of vermin roaches located at apt 2, 2nd story, apartment at north
Aug 18, 2006 · Apt 2
Open — First no access to re- inspect violation - BHazardous
Properly secure the loose electric light fixture ceiling bathroom located at apt 2, 2nd story, apartment at north
Aug 18, 2006 · Apt 2
Open — First no access to re- inspect violation - ANon-hazardous
Properly repair the broken or defective mortise lock in the entrance located at apt 2, 2nd story, apartment at north
Aug 18, 2006 · Apt 2
Open — First no access to re- inspect violation - BHazardous
Remove all encumbrances consisting of ladders, bags of garbage, and other construction materials at public hall, 2nd story
Jun 30, 2006
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of mops, pails, joint compound and other house hold materials at public hall, 1st story
Jun 30, 2006
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective lock and assembly at bldg. ent. door at public hall, 1st story
Jun 8, 2006
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective refrigerator door gasket in the kitchen located at apt 3, 3rd story, 1st apartment from north at east
Jun 8, 2006 · Apt 3
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective reglazing at bathtub in the bathroom located at apt 3, 3rd story, 1st apartment from north at east
Jun 8, 2006 · Apt 3
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak water damage at ceiling in the 1st room from north at east located at apt 3, 3rd story, 1st apartment from north at east
Jun 8, 2006 · Apt 3
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 3, 3rd story, 1st apartment from north at east
Jun 8, 2006 · Apt 3
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color all ceilings in the entire apartment located at apt 3, 3rd story, 1st apartment from north at east
Jun 8, 2006 · Apt 3
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective bell buzzar in the entire apartment located at apt 3, 3rd story, 1st apartment from north at east
Jun 8, 2006 · Apt 3
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 1st room from north at west located at apt 2, 3rd story, 1st apartment from east at south
Jun 7, 2006 · Apt 2
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2, 3rd story, 1st apartment from east at south
Jun 7, 2006 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the bathroom located at apt 2, 3rd story, 1st apartment from east at south
Jun 7, 2006 · Apt 2
Closed — Violation closed - BHazardous
Abate the nuisance consisting of moisture penetration at ceiling in the bathroom located at apt 2, 3rd story, 1st apartment from east at south
Jun 7, 2006 · Apt 2
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from north located at apt 2, 3rd story, 1st apartment from east at south
Jun 7, 2006 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 3rd room from east at north located at apt 2, 3rd story, 1st apartment from east at south
Jun 7, 2006 · Apt 2
Closed — Violation closed - BHazardous
Abate the nuisance consisting of moisture penetration at ceiling in the 1st room from north at east located at apt 2, 3rd story, 1st apartment from east at south
Jun 7, 2006 · Apt 2
Closed — Violation closed - BHazardous
Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 2, 3rd story, 1st apartment from east at south
Jun 7, 2006 · Apt 2
Closed — Violation closed - BHazardous
Abate the nuisance consisting of vermin mice in the entire apartment located at apt 2, 3rd story, 1st apartment from west at north
Jun 7, 2006 · Apt 2
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor at public hall, 1st story
Jun 7, 2006
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1, 2nd story, 1st apartment from north at east
Jun 1, 2006 · Apt 1
Closed — Violation dismissed - BHazardous
Replace with new the missing lower sash window in the 1st room from east at south located at apt 1, 2nd story, 1st apartment from north at east
Jun 1, 2006 · Apt 1
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective entrance door frame at door side located at apt 1, 2nd story, 1st apartment from north at east
Jun 1, 2006 · Apt 1
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and walls in the entire apartment located at apt 1, 2nd story, 1st apartment from north at east
Jun 1, 2006 · Apt 1
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and walls in the entire apartment located at apt 1, 2nd story, 1st apartment from north at east
Jun 1, 2006 · Apt 1
Closed — Violation dismissed - BHazardous
Replace with new the missing lower sash window in the 1st room from east at south located at apt 1, 2nd story, 1st apartment from north at east
Jun 1, 2006 · Apt 1
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective mortise lock in the entrance located at apt 1, 2nd story, 1st apartment from north at east
Jun 1, 2006 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Jun 1, 2006
Closed — Violation closed - BHazardous
Replace with new the broken or defective lower sash glass window at public hall
May 19, 2006
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective exterior cement window frame in the 4th room from north located at apt 4, 4th story, 1st apartment from north at east
May 19, 2006 · Apt 4
Closed — Violation dismissed - BHazardous
Properly secure the loose handrail at public hall stairs, 3rd story
May 19, 2006
Closed — Violation dismissed - BHazardous
Arrange and make self-closing the doors , in the entrance located at apt 4, 4th story, 1st apartment from north at east
May 19, 2006 · Apt 4
Closed — Violation dismissed
DOB building violations · 7
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Electric signs none
Es-electric signs none
Apr 15, 1999
Dob violation - dismissed
ECB violations · 8
- Class - 2
Work does not conform to approved construction documents: const. work in cellar conducted under job 120001309. observed 4 rooms, each with musical equipment & sound proofing material on walls/doors. observed pa
Feb 26, 2020 · Penalty $1,250
Resolve - Class - 2
Failure to conduct or file a final inspection of permitted work with the department of buildings: noted: upon inspection observed construction work under permit #120001309 issued on 07/23/2009 for interior reno
Feb 26, 2020 · Penalty $1,250
Resolve - Class - 2
Work without a permit: noted: upon inspection observed in cellar electrical panel as well as new electrical bx cables, approximately 40 new electrical outlets, approximately 10 new electrical switched and appro
Feb 26, 2020 · Penalty $625
Resolve - Class - 2
Occupancy contrary to that allowed by dob records: permit #120001309 states cellar consist of 2 storage rooms, gas meter/electrical/refuse and boiler rooms. upon inspection observed in 1 storage room 3 closets
Feb 26, 2020 · Penalty $625
Resolve - Class - 2
Failure to safeguard all persons & property affected by construction operations. noted: upon inspection no protection over windows at adjoining 1st flr windows at exp 2. remedy: safeguard public & property.
Jul 30, 2009 · Penalty $1,200
Resolve - Class - 2
Failure to safeguard all persons and property affected by constructionoperations noted construction operations as erected foundation walls for horizontal extension at rear appl #110438731 in progress using adja
Jun 10, 2009 · Penalty $1,200
Resolve - Class - 1
Failure to protect adjoining structures during excavation operations. noted: construction operations for horizontal extension at rear - job #110438731 has undermining of adjoining to the east (217 e 116 st)
Apr 15, 2009 · Penalty $12,000
Resolve - Non-hazardous
Failure to maintain bldg- interior. defect noted: west side, exterior wall at stair well 3rd floor window having vertical cracks appr. 1/8" at left side top and bottom window, and sloped stairs from 3rd floor
May 19, 2006 · Penalty $350
Resolve
Complaints
- Heating
Heat related
Dec 6, 2011 · Apt BLDG
Close - Heating
Heat related
Dec 24, 2007 · Apt 3
Close - Heating
Heat related
Nov 9, 2007 · Apt 3
Close - Heating
Heat related
Nov 7, 2007 · Apt 3
Close - Heating
Heat related
Nov 6, 2007 · Apt 3
Close - Paint/plaster
Ceiling
Oct 24, 2007 · Apt 1FL
Close - Paint/plaster
Ceiling
Oct 24, 2007 · Apt 1FL
Close - Paint/plaster
Ceiling
Oct 24, 2007 · Apt 1FL
Close - Paint/plaster
Wall
Oct 24, 2007 · Apt 1FL
Close - Paint/plaster
Ceiling
Oct 21, 2007 · Apt 3
Close
Show 40 more ↓
- Electric
Wiring
Oct 21, 2007 · Apt 3
Close - Electric
Wiring
Sep 15, 2007 · Apt 3
Close - Electric
Lighting
Sep 15, 2007 · Apt 3
Close - General
Floor
Aug 31, 2007 · Apt 1
Close - General
Floor
Aug 31, 2007 · Apt 1
Close - Plumbing
Water-leaks
Aug 31, 2007 · Apt 1
Close - Plumbing
Water-leaks
Aug 31, 2007 · Apt 1
Close - Heating
Heat related
Aug 7, 2007 · Apt 3
Close - General
Cooking gas
Aug 7, 2007 · Apt 3
Close - Plumbing
Water-leaks
Jul 7, 2007 · Apt 3
Close - Heating
Heat related
Apr 15, 2007 · Apt 3
Close - Plumbing
Water-leaks
Apr 9, 2007 · Apt 3
Close - Plumbing
Water-leaks
Apr 9, 2007 · Apt 3
Close - Construction
Roof
Jan 25, 2007 · Apt 3
Close - Electric
Bell-buzzer/intercom
Jan 25, 2007 · Apt 3
Close - General
Stairs
Jan 25, 2007 · Apt 3
Close - Paint/plaster
Ceiling
Jan 25, 2007 · Apt 3
Close - Paint/plaster
Ceiling
Jan 25, 2007 · Apt 3
Close - Paint/plaster
Ceiling
Jan 25, 2007 · Apt 3
Close - Heating
Heat related
Jan 16, 2007 · Apt 3
Close - Heating
Heat related
Jan 8, 2007 · Apt 3
Close - Heating
Heat related
Nov 24, 2006 · Apt 2
Close - Heating
Heat related
Nov 18, 2006 · Apt 3
Close - Paint/plaster
Ceiling
Oct 23, 2006 · Apt 2
Close - Electric
Bell-buzzer/intercom
Oct 23, 2006 · Apt 2
Close - General
Doors
Oct 23, 2006 · Apt 2
Close - Nonconst
Vermin
Oct 23, 2006 · Apt 2
Close - Nonconst
Janitor/super
Oct 23, 2006 · Apt 2
Close - Paint/plaster
Wall
Oct 23, 2006 · Apt 2
Close - Paint/plaster
Wall
Sep 18, 2006 · Apt 2
Close - General
Doors
Sep 18, 2006 · Apt 2
Close - Paint/plaster
Ceiling
Sep 18, 2006 · Apt 2
Close - Appliance
Electric/gas range
Sep 18, 2006 · Apt 2
Close - Nonconst
Vermin
Sep 18, 2006 · Apt 2
Close - Paint/plaster
Wall
Sep 18, 2006 · Apt 2
Close - Appliance
Electric/gas range
Aug 17, 2006 · Apt 2
Close - Nonconst
Vermin
Aug 17, 2006 · Apt 2
Close - General
Doors
Aug 17, 2006 · Apt 2
Close - General
Windows
Aug 17, 2006 · Apt 2
Close - Plumbing
Basin/sink
Aug 17, 2006 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S9)
- Year built
- 1910
- Floors
- 4
- Residential units
- 2
- Building area
- 5,138 ft²
- Lot area
- 2,800 ft²
- Zoning
- R7D
- Community board
- 111
- Council district
- 8
- Block / lot
- 1666 / 7
- Assessed value
- $490,950
- Landmark / historic district
- No
Questions about 211 East 116 Street
Who owns 211 East 116 Street?
The owner of record in NYC Department of City Planning PLUTO data is Alm 215 Realty Corp..
Does 211 East 116 Street have violations?
Yes. NYC HPD has recorded 118 housing violations at this property.
Is 211 East 116 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 211 East 116 Street built?
City records list 1910 as the year it was built.
How many apartments are in 211 East 116 Street?
It has 2 residential units and 4 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.