238 East 106 Street
Manhattan, NY 10029BBL 1-01655-0031Map
Owner of record: Corinthian Parking, LLC
238 East 106 Street is an elevator apartment building built in 2014 in Manhattan, 10029. It has 29 residential units across 8 floors. The owner of record is Corinthian Parking, LLC. HPD has recorded 33 housing violations here, most recently on September 27, 2026. 20 of the 33 most recent violations are still open.
- HPD violations
- 33
- DOB violations
- 40
- ECB violations
- 44
- HPD complaints
- 60
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 33
- BHazardous
Provide security in the event of a power outage by means of an acceptable mechanical heavy duty lock and latch set at the building entrance door , 1st story
Sep 27, 2026
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening consisting of an unacceptable electromagnetic locking device at the building entrance door , 1st story
Sep 27, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 8bb, 8th story, 1st apartment from west at north
Sep 8, 2026 · Apt 8BB
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 8bb, 8th story, 1st apartment from west at north
Jul 26, 2026 · Apt 8BB
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation top rails surrounding the balcony at north, west and east in the terrace located at apt 8bb, 8th story, 1st apartment from west at north
Jul 26, 2026 · Apt 8BB
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor ... at public hall, 1st story
Jul 26, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at the building front entrance door , 1st story
Jul 26, 2026
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening electromagnetic device requiring to push a button in order to exit at the building front entrance door , 1st story
Jul 26, 2026
Open — Nov sent out - CImmediately hazardous
Provide a heavy duty lock and latchset for the building front entrance door , 1st story
Jul 26, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective wood laminate floor boards in the 2nd room from east located at apt 8bb, 8th story, 1st apartment from west at north
Jul 26, 2026 · Apt 8BB
Closed — Violation closed
Show 23 more ↓
- CImmediately hazardous
Properly repair with similar material the broken or defective wood laminate floor boards in the 4th room from east at north located at apt 8bb, 8th story, 1st apartment from west at north
Jul 26, 2026 · Apt 8BB
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective hvac stytem in the 3rd room from east located at apt 8bb, 8th story, 1st apartment from west at north
Jun 22, 2026 · Apt 8BB
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor tiles in the 1st room from north at west located at apt 8bb, 8th story, 1st apartment from west at north
May 1, 2026 · Apt 8BB
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor tiles in the 1st room from north at center located at apt 8bb, 8th story, 1st apartment from west at north
May 1, 2026 · Apt 8BB
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north at west located at apt 8bb, 8th story, 1st apartment from west at north
Apr 6, 2026 · Apt 8BB
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north at center located at apt 8bb, 8th story, 1st apartment from west at north
Apr 6, 2026 · Apt 8BB
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and west wall at compactor closet, 8th story
Apr 6, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and west wall at compactor closet, 8th story
Apr 6, 2026
Open — Nov sent out - BHazardous
Provide security in the event of a power outage by means of an acceptable mechanical heavy duty lock and latch set at the building entrance door , 1st story
Apr 6, 2026
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening remove the illegal fastening consisting of an unacceptable electromagnetic locking device at the building entrance door , 1st story
Apr 6, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 8bb, 8th story, 1st apartment from west at north
Jan 24, 2026 · Apt 8BB
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 4th room from east located at apt 8bb, 8th story, 1st apartment from west at north
Jan 24, 2026 · Apt 8BB
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 3d, 3rd story, 2nd apartment from west at north
Jan 13, 2026 · Apt 3D
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective mortise lock at door leading to balcony in the 1st room from east located at apt 3d, 3rd story, 2nd apartment from west at north
Jan 13, 2026 · Apt 3D
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of cold water for the fixtures at all fixtures in the entire apartment located at apt 8bb, 8th story, 1st apartment from west at north
Nov 15, 2024 · Apt 8BB
Closed — Violation dismissed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures at all fixtures in the entire apartment located at apt 8bb, 8th story, 1st apartment from west at north
Nov 15, 2024 · Apt 8BB
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). unoperative in the entire apartment located at apt 2d, 2nd story, 2nd apartment from west at north
Dec 28, 2022 · Apt 2D
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector unoperative in the entire apartment located at apt 2d, 2nd story, 2nd apartment from west at north
Dec 28, 2022 · Apt 2D
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective undividual heating unit in the 1st room from north at west located at apt 2d, 2nd story, 2nd apartment from west at north
Dec 28, 2022 · Apt 2D
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the kitchen located at apt 4c, 4th story, 1st apartment from north at east
May 1, 2018 · Apt 4C
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures located at apt 8aa, 8th story, 1st apartment from east at south
Mar 2, 2016 · Apt 8AA
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system : door locked at heating plant at cellar
Mar 2, 2016
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system : post notice at lobby, 1st story
Mar 2, 2016
Closed — Violation dismissed
DOB building violations · 40
- Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 29, 2017
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 3, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 3, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 3, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 3, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 27, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 27, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 27, 2014
Dob violation - dismissed
Show 30 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 27, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 27, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 27, 2014
Dob violation - dismissed - Plumbing none
Observed the new installation of sprinkler & standpipe systems throughout building w/o the required permits. also building height is above 75 & no temporary air pressurize system installed as required remedy: obtain permits for required work
Jun 20, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 28, 2013
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 11, 2012
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed - Emergency none
Egncy-emergency none
Jul 20, 1992
Dob violation - active - Construction other optional
C-construction other optional
Jan 24, 1990
Vp-violation unserved ecb-active - Construction other optional
C-construction other optional
Dec 22, 1989
Vp-violation unserved ecb-active - Construction other optional
C-construction other optional
Dec 22, 1989
Dob violation - active - Construction other optional
C-construction other optional
Dec 22, 1989
Dob violation - dismissed - Construction other optional
C-construction other optional
Oct 16, 1989
Dob violation - dismissed - Construction other optional
C-construction other optional
Aug 18, 1989
Vp-violation unserved ecb-active - Construction other optional
C-construction other optional
Aug 18, 1989
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 20, 1989
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 20, 1989
Vp-violation unserved ecb-active - Construction other optional
C-construction other optional
Jul 20, 1989
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 20, 1989
Dob violation - dismissed - Construction other optional
C-construction other optional
Apr 7, 1989
Dob violation - dismissed - Construction other optional
C-construction other optional
Jan 24, 1989
Dob violation - dismissed
ECB violations · 44
- Class - 1
Failure to comply w/the comm's order contained in summons/vio#35228613l issued on 02/11/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. work w/o a permit,at cellar boiler room installed 2 hot waters.
Jan 22, 2018 · Penalty $1,000
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35228613l issued on 02/11/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. observed in basement-electric-cellar-boiler room,installed 2 ho
Nov 8, 2017 · Penalty $6,000
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation #35228615p issued 02/11/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. failure to maintain build
Oct 13, 2017 · Penalty $2,000
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation #35228617z issued 02/11/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. failure to maintain build
Oct 13, 2017 · Penalty $830
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation #35228617z issued on 02/11/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.failure to maintain buil
Jul 24, 2017 · Penalty $800
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation #35228615p issued on 02/11/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.no fire stopping at cell
Jul 24, 2017 · Penalty $800
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation#35228617z issued on 02/11/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.note:no document file for
Jun 12, 2017 · Penalty $830
Resolve - Class - 1
Failure to comply with the commissioner's order contained in summons/violation#35228613l issued on 2/11/17 and to file a certificate of correction pursuant to 28-201.1 and rcny 102-01.note: no document file for
Jun 12, 2017 · Penalty $2,430
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation #35228615p issued on 2/11/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.no documement file for
Jun 12, 2017 · Penalty $830
Resolve - Class - 1
Unlawful acts. failure to comply w/an order of the commissioner. failure to comply w/the comm's order contained in violation/summons#35228613l issued on 2-11-17. & to file a c of c 1st to 28-301.1 & to rcny 102
Apr 13, 2017 · Penalty $2,400
Resolve
Show 34 more ↓
- Class - 2
Failure to comply with the commissioner's order to file a c of c with the dob. failure to comply with the commissioner's order contained in vio/summons # 35228615p issued on 02/11/17 & to file c of c with the
Apr 13, 2017 · Penalty $830
Resolve - Class - 2
Failure to comply with the commissioner's order to file a c of c with the dob. failure to comply with the commissioner's order contained in vio/summons # 35228617z issued on 02/11/17 & to file c of c with the d
Apr 13, 2017 · Penalty $830
Resolve - Class - 1
Failure to have new ot altered plumbing systems tested-observed in bsmt/cellar installed 2 50 gallons electric hot water heaters with 1/2 pex plastic water piping connected to existing boiler. no dob inspection
Feb 11, 2017 · Penalty $1,000
Resolve - Class - 1
Failure to maintain bldg in code comp manner-no fire stopping per bc 712.3 & 27-345 observed in bsmt/cellar missing fire stopping for pipe penetration. remedy: provide fire stopping comp w/code.
Feb 11, 2017 · Penalty $1,000
Resolve - Class - 2
Observed in laundry room-for gas dryers vent installed 6" ties into house vent 4"-piping reduced in ceiling location-old code 27-887/new code 28-301.1. remedy: install proper vent.
Feb 11, 2017 · Penalty $500
Resolve - Class - 1
Failure to maintain bldg in code compliant manner-observed in bsmt/cellar-stand piping in corridor for fdny-leaking at piping & fitting connection causing pooling on floor. remedy: repair & replace.
Feb 11, 2017 · Penalty $500
Resolve - Class - 1
Work no permit-observed in basement-electric-cellar-boiler room-installed 2 hot water. heaters storage tank 50 gallons each with 1/2 plasticpex water piping connected to existing boiler. not part of app#1224442
Feb 11, 2017 · Penalty $1,600
Resolve - Class - 2
Failure to maintain bldg in code complaint manner. observed exterior front bldg. sprinkler alarm bell at improper height-req'd 7feet off grade level. remedy: repair/replace.
Feb 11, 2017 · Penalty $500
Resolve - Class - 2
Failed to obtain a temporary construction permit prior to installation/use of sidewalk shed. note the sidewalk shed permit erected at front of bldg w/appl #140129180 has expired on 7-24-14. remedy: obtain/renew
Aug 4, 2014 · Penalty $500
Resolve - Class - 1
Unlawfully continued work while on notice of a stop work order. noted:work currently in progress w/appl #110093835 including work on pipe scaffolding at 2nd fl front of bldg w/stop work orders 35093015x and
Aug 4, 2014 · Penalty $25,000
Resolve - Class - 2
Sec. 3307.6 sidewalk shed does not meet specifications. defects noted:the sidewalk shed erected at front facade of bldg w/appl #14012980 haslights mounted on under side of shed above 8 foot from sidewalk level.
Aug 4, 2014 · Penalty $2,400
Resolve - Class - 1
Unlawfully continued work while on notice of a stop work order. noted work currently in workers doing masonry & stucco at front facade 2nd fl on top of pipe scaffold at front of bldg w/stop work order 35093014y
Aug 4, 2014 · Penalty $25,000
Resolve - Class - 1
Fail to provide air pressure alarm system for standpipe system during construction operation.on 06/20/14 @9:30 i observed a new standpipe system installed up to the 8th flr of this new bldg w/o the required pre
Jun 20, 2014 · Penalty $2,430
Resolve - Class - 1
Work w/o a permit on 06/20/14 @9:30 i observed the installation of a new sprinkler & standpipe system throughout the entire bldg.work not yet completed.stop all work.rem:obtain permit on restore premises to pri
Jun 20, 2014 · Penalty $1,630
Resolve - Class - 2
Fail to provide & post required "project information panel"last nb permit was 1/24/14 proposed nb to have 29 dwelling units.rem:provide&post@ job site required project info panel also paint fence "hunter green"
Jun 20, 2014 · Penalty $4,000
Resolve - Class - 1
Failure to safegaurd all persons & property affected by const operations.note:@ the time of my insp responding to compliant #1373687 i was alerted by adjacent property residents who brought to my attention in t
Jun 16, 2014 · Penalty $12,000
Resolve - Class - 2
Electrical work w/o a permit.note:@ time of my insp around 9:30am const work in progress of 8th story masonry & steel frame bldg.i observed that there were temorary electrical wiring throughout bldg from the bs
Jun 3, 2014 · Penalty $4,000
Resolve - Class - 1
3308.3,vertical safety netting not per code,damage or in adequate.note@ time of insp const work in progress of 8th story masonry & steel frame bldg.i observed that safety netting from 2nd fl to roof was not bui
Jun 3, 2014 · Penalty $8,000
Resolve - Class - 1
Failure to safeguard all persons & property affected by const operation.note:@ time of my insp const work in progress of 8th story masonry bldg w/ steel framing.i observed that rebars @ exp three 1st fl were ex
Jun 3, 2014 · Penalty $12,000
Resolve - Class - 2
Failure to provide approved accpeted plans @ job site @ time of insp.noted:@ time of insp const work in progress of an 8th fl masonry & steel frame bldg upon requesr for approved plans,personnels on site fail t
Jun 3, 2014 · Penalty $2,500
Resolve - Class - 1
Electrical work w/o a permit.note:@ time of my insp around 9:30am const work in progress.i observed electrical wiring throughout bldg from cellar level to panel boards on various fl in bldg.cellar level consist
Jun 3, 2014 · Penalty $8,000
Resolve - Class - 1
3303.4.5,storage of materials during const or demo.note:@ time of my insp const work in progress of 8th story masonry w/ steel framing.i observed that materials that consist of wire(mesh)& concrete blocks were
Jun 3, 2014 · Penalty $8,000
Resolve - Class - 1
Erected or installed supported scaffold 40'or higher w/o a permit.note@ time of my insp,const work in progress of an 8th story masonry & steel frame bldg.i observed supported scaffold approx 48'height from grou
Jun 3, 2014 · Penalty $6,000
Resolve - Class - 1
3314.3.1.6,parapet clamps.note:@ time of my insp const work in progress of 8th story masonry bldg w/ steel framing.i observed that aprapet clamsps being used to support c-hoks of two point suspended scaffold we
Jun 3, 2014 · Penalty $8,000
Resolve - Class - 2
092313jm01. work does not conform to approved construction documents. barricades shown around crane area on street side of crane work. instead only small cones in place and not closing of east/west elevation of
Sep 23, 2013
Resolve - Class - 1
092313jm01. failure to safeguard all persons and property affected by construction operations. no flagmen on road/street side of crane. crane no.- cd 4190 crane notice no. 539/13. remedy:provide flagmen @ above
Sep 23, 2013 · Penalty $2,400
Resolve - Class - 2
Sec. 3303.3 obstruction of sidewalks/streets. noted: no street or sidewalk shall be closed either in whole or in part w/o a permit from dot a concrete pump truck has extented it's outrigger's onto the center of
May 29, 2013 · Penalty $4,000
Resolve - Class - 1
Sec. 3307.5.2 a flagperson shall be provided when ever intermittent operations are conducted on,or adjacent to,areas open to use by persons other than workers. noted: no flagman posted,pedestrian walking under
May 29, 2013 · Penalty $8,000
Resolve - Class - 2
Work does not conform to the approved construction documents. contractor has begun installing slodier piles for shoring at exp 2 & 4 which is not on plan. also plans are not of adequate clarity to perform work.
Apr 18, 2012 · Penalty $2,500
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operation contractor has damaged exp (2) of the adjacent property (exp 4 of job site) damage consist of small hole at exterior 4" x 5" put on
Apr 18, 2012 · Penalty $2,400
Resolve - Class - 2
Job site fence not constructed pursuant to subsection. defects noted: at time of inspection site fence has loose/shifted wooden panels around vacant lot by pedestrian walkway. remedy: repair/replace fence
Jul 12, 2010 · Penalty $4,000
Resolve - Class - 1
Failure to provide protection at sides of excavation. noted: at centerof vacant lot excavation of approx 5'w x 25'l x 8'deep. w/o sheeting or shoring under permit #110093835. stop all work except to: remedy:
Jul 15, 2008 · Penalty $2,400
Resolve - Non-hazardous
Failure to maintain. foundation walls separating from floor beams. all walls sagging on all floors. remedy: obtain necessary approvals from this dept.
Dec 1, 1989 · Penalty $1,000
Resolve - Hazardous
Failure to maintain defect is foundation wall separating from floor beams hallwalls sagging on all floors. remedy obtain all necessary approvals from this dept and make all repairs
Jul 20, 1989 · Penalty $500
Resolve
Complaints
- Safety
Sprinkler
Oct 10, 2026 · Apt 6D
Open - Safety
Sprinkler
Oct 8, 2026 · Apt 1A
Close - Door/window
Door
Oct 5, 2026 · Apt 8BB
Close - Door/window
Door
Oct 5, 2026 · Apt 8BB
Close - Plumbing
Bathtub/shower
Oct 2, 2026 · Apt 8BB
Open - Heat/hot water
Apartment only
Sep 25, 2026 · Apt 8BBON8
Close - Heat/hot water
Apartment only
Sep 24, 2026 · Apt 8BB
Close - Heat/hot water
Entire building
Sep 24, 2026 · Apt BUILDI
Close - Heat/hot water
Apartment only
Sep 5, 2026 · Apt 8BB
Close - Heat/hot water
Entire building
Sep 5, 2026 · Apt 5C
Close
Show 40 more ↓
- Paint/plaster
Window/frame
Jul 10, 2026 · Apt 8BB
Close - Flooring/stairs
Floor
Jul 10, 2026 · Apt 8BB
Close - Flooring/stairs
Floor
Jun 22, 2026 · Apt 8BB
Close - Paint/plaster
Window/frame
Jun 22, 2026 · Apt 8BB
Close - Heat/hot water
Apartment only
Jun 22, 2026 · Apt 8BB
Close - Heat/hot water
Entire building
May 8, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
May 8, 2026 · Apt 8BB
Close - Heat/hot water
Entire building
May 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 7, 2026 · Apt 5C
Close - General
Ventilation system
Apr 25, 2026 · Apt 6D
Close - Plumbing
Bathtub/shower
Apr 25, 2026 · Apt 6D
Close - Electric
Outlet/switch
Apr 25, 2026 · Apt 6D
Close - Flooring/stairs
Floor
Apr 22, 2026 · Apt 8BB
Close - Water leak
Slow leak
Apr 22, 2026 · Apt 8BB
Close - Plumbing
Bathtub/shower
Apr 22, 2026 · Apt 8BB
Close - Door/window
Window frame
Apr 22, 2026 · Apt 8BB
Close - Flooring/stairs
Floor
Apr 22, 2026 · Apt 8BB
Close - Appliance
Electric/gas range
Apr 22, 2026 · Apt 8BB
Close - Plumbing
Radiator
Apr 22, 2026 · Apt 8BB
Close - Flooring/stairs
Floor
Apr 12, 2026 · Apt 8BB
Close - General
Bell/buzzer/intercom
Apr 12, 2026 · Apt 8BB
Close - Flooring/stairs
Floor
Mar 18, 2026 · Apt 8BB
Close - Water leak
Heavy flow
Mar 10, 2026 · Apt 2B
Close - Plumbing
Basin/sink
Mar 10, 2026 · Apt 2B
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt 5C
Close - Heat/hot water
Apartment only
Feb 2, 2026 · Apt 2C
Close - Paint/plaster
Ceiling
Feb 2, 2026 · Apt 8BB
Close - Heat/hot water
Apartment only
Jan 30, 2026 · Apt 2C
Close - Heat/hot water
Apartment only
Jan 26, 2026 · Apt 2C
Close - Heat/hot water
Apartment only
Jan 22, 2026 · Apt 8BB
Close - Flooring/stairs
Floor
Jan 22, 2026 · Apt 8BB
Close - Heat/hot water
Entire building
Jan 13, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 12, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Dec 26, 2024 · Apt APT3E
Close - Water leak
Heavy flow
Dec 11, 2024 · Apt 5C
Close - Paint/plaster
Ceiling
Dec 11, 2024 · Apt 5C
Close - Plumbing
Water supply
Nov 14, 2024 · Apt 8BB
Close - Heat/hot water
Apartment only
Dec 24, 2022 · Apt 2D
Close - Heat/hot water
Apartment only
Apr 18, 2022 · Apt 2E
Close - General
Ventilation system
Jul 27, 2020 · Apt 8AA
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D3)
- Year built
- 2014
- Floors
- 8
- Residential units
- 29
- Building area
- 10,200 ft²
- Lot area
- 5,046 ft²
- Zoning
- R7A
- Community board
- 111
- Council district
- 8
- Block / lot
- 1655 / 31
- Assessed value
- $2,305,800
- Landmark / historic district
- No
HPD registration #144232, last renewed Sep 30, 2025.
Questions about 238 East 106 Street
Who owns 238 East 106 Street?
The owner of record in NYC Department of City Planning PLUTO data is Corinthian Parking, LLC.
Does 238 East 106 Street have violations?
Yes. NYC HPD has recorded 33 housing violations at this property.
Is 238 East 106 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 238 East 106 Street built?
City records list 2014 as the year it was built.
How many apartments are in 238 East 106 Street?
It has 29 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.