1690 Lexington Avenue
Manhattan, NY 10029BBL 1-01634-0015Map
Owner of record: 1690 Lex Corp
1690 Lexington Avenue is a store building built in 1920 in Manhattan, 10029. It has 3 residential units across 5 floors. The owner of record is 1690 Lex Corp. HPD has recorded 32 housing violations here, most recently on April 29, 2026. 21 of the 32 most recent violations are still open.
- HPD violations
- 32
- DOB violations
- 8
- ECB violations
- 10
- HPD complaints
- 8
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 32
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 4, 2025
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 14, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Feb 23, 2025 · Apt 2
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective inoperable hinges at door in the entrance located at apt 2, 2nd story, 1st apartment from south at west
Feb 23, 2025 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from south at west wall in the 1st room from east located at apt 2, 2nd story, 1st apartment from south at west
Feb 23, 2025 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 1st room from east located at apt 2, 2nd story, 1st apartment from south at west
Feb 23, 2025 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway located at apt 2, 2nd story, 1st apartment from south at west
Feb 23, 2025 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, 2nd window frame from east at south wall in the 2nd room from east located at apt 2, 2nd story, 1st apartment from south at west
Feb 23, 2025 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, 1st window frame from south at west wall in the 6th room from east located at apt 2, 2nd story, 1st apartment from south at west
Feb 23, 2025 · Apt 2
Open — Nov sent out
Show 22 more ↓
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 22, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2024
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 15, 2023
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 2, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 15, 2022
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 15, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 25, 2019
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jan 31, 2019
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box ... at public hall, 1st story
Jan 31, 2019
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jan 31, 2019
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Jan 31, 2019
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system ... at public hall, 1st story
Jan 31, 2019
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at ... at public hall, 1st story
Jan 31, 2019
Open — Nov sent out - ANon-hazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling fixture. at public hall, 3rd story
Jan 31, 2019
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of bicycle and household items obstructing egress to bulkhead at public hall, 4th story
Jan 31, 2019
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 9, 2018
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 6, 2017
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 25, 2016
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 1, 2015
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 2, 2015
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts minimum required (light fixtures present)
Apr 27, 2013
Open — Nov certified late
DOB building violations · 8
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 29, 2016
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Construction other optional
C-construction other optional
Nov 15, 2000
Vw-violation work without permit - active - Construction other optional
C-construction other optional
Oct 18, 1996
Dob violation - dismissed - Construction other optional
C-construction other optional
Oct 18, 1996
Vp-violation unserved ecb-active - Construction other optional
C-construction other optional
Jul 26, 1995
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 26, 1995
Vp-violation unserved ecb-active
ECB violations · 10
- Class - 1
Failure to maintain bldg in code-compliant manner. re:prohibited connection at the time of my inspection at 12:05pm at the above address in store cellar. i observed while on a spot check a tee fitting on the
Mar 28, 2016 · Penalty $1,000
Active - Class - 2
Sec 28-301.1 misc viol: fail to maintain bldg in a code compliant manner: exhaust discharge must be at least 10 ft from bldg opening, as perrs 13 (2-2.1.1.4) & mc 401.5.2. noted: at the 1st fl the pizza restaur
May 6, 2009 · Penalty $400
Resolve - Class - 2
Sec bc 401.5.2 misc viol: fail to terminate exhaust as per code. notedthe exhaust vent from kitchen of "luna's pizza deli" located at first floor of the bldg terminates less than 10ft. above sidewalk on south
Feb 20, 2009 · Penalty $400
Resolve - Non-hazardous
Failure to comply with rs 13.2-2.114 of administrative law code. at 1st flr level approx. 7' above grade exist a exhaust fan with in 10' from a residential double hung window also blowing directly onto sidewalk
Apr 13, 2006 · Penalty $400
Active - Hazardous
Failure to maintain building note at basement south vault has defective unsupported brickwork with missing bricks (vault ceiling (under sidewalk remedy:maintain building
May 26, 2005 · Penalty $800
Active - Non-hazardous
Work without a permit.5% work completed.noted:at roof level work being done on paraphet wall and removal and replacement of bricks.rem:stop all work,obtain permit and approvals from this dept.
Nov 15, 2000 · Penalty $500
Active - Non-hazardous
Failu reto obtain permit for tempoary cosntruction permit not obtained for sidewalk shed remedy obtain permit
Jun 30, 1999
Resolve - Non-hazardous
Failure to maintain exterior building wall: defects are: west wall by east 106 street, has missing mortar joints at various area and location 2nd thru 5th floors. remedy: make immediate repairs.
May 8, 1997
Resolve - Hazardous
Failure to maintain exterior bldg wall defect are:decorative masonary above 2nd floor window at west side of e. 106 st failed + fell bldg.entire west masonary wall from 2nd to roof buldging + out of plumb with
Jul 26, 1995 · Penalty $800
Resolve - Non-hazardous
Failure to maintain metal roof cornice (rotted and hanging throught.) remedy: make all lawful repairs forthwith
Apr 25, 1993 · Penalty $350
Resolve
Complaints
- Unsanitary condition
Garbage/recycling storage
Jul 29, 2025 · Apt BLDG
Close - Paint/plaster
Door/frame
Feb 17, 2025 · Apt APT2
Close - Paint/plaster
Window/frame
Feb 17, 2025 · Apt APT2
Close - Paint/plaster
Door/frame
Feb 4, 2025 · Apt APT2
Close - Paint/plaster
Window/frame
Feb 4, 2025 · Apt APT2
Close - Safety
Window guard broken/missing
Jan 10, 2019 · Apt 5
Close - Plumbing
Water supply
Oct 29, 2016 · Apt 3
Close - Plumbing
Water supply
Oct 29, 2016 · Apt 3
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Store building (K9)
- Year built
- 1920
- Floors
- 5
- Residential units
- 3
- Building area
- 6,375 ft²
- Lot area
- 1,319 ft²
- Zoning
- R7D
- Community board
- 111
- Council district
- 8
- Block / lot
- 1634 / 15
- Assessed value
- $397,350
- Landmark / historic district
- No
HPD registration #136501, last renewed Nov 21, 2025.
Questions about 1690 Lexington Avenue
Who owns 1690 Lexington Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 1690 Lex Corp.
Does 1690 Lexington Avenue have violations?
Yes. NYC HPD has recorded 32 housing violations at this property.
Is 1690 Lexington Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1690 Lexington Avenue built?
City records list 1920 as the year it was built.
How many apartments are in 1690 Lexington Avenue?
It has 3 residential units and 5 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.