64 East 111 Street is an elevator apartment building built in 2011 in Manhattan, 10029. It has 122 residential units across 12 floors. The owner of record is La Celia Owners Corp.. HPD has recorded 3 housing violations here, most recently on September 8, 2023. 3 of the 3 most recent violations are still open.
- HPD violations
- 3
- DOB violations
- 9
- ECB violations
- 28
- HPD complaints
- 15
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 3
- BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the kitchen located at apt 210, 2nd story, 2nd apartment from west at north
Sep 8, 2023 · Apt 210
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the private hallway located at apt 210, 2nd story, 2nd apartment from west at north
Sep 8, 2023 · Apt 210
Open — Nov sent out - BHazardous
Properly repair the broken or defective ventilation fan at the north wall in the bathroom located at apt 311, 3rd story, 1st apartment from west at north
Nov 19, 2014 · Apt 311
Open — Nov sent out
DOB building violations · 9
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 6, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 6, 2018
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 5, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 5, 2013
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2011 inspection/test
Oct 1, 2012
Dob violation - dismissed
ECB violations · 28
- Class - 2
Sec. 27-357(d);1105.1 people w/physical disabilities: primary entrancein accessible. noted: exterior & interior primary entry doors require force creater than what is legally allowable to be in compliance with
Mar 23, 2015
Resolve - Class - 2
1107.6.1.3 people with physical disablities,failure to provide adequate access.noted:glass entry doors.1st floor public bathroom doors + garbage disposal room doors are not in compliance with standards acceptab
Dec 26, 2014
Resolve - Class - 2
Bc1107.6.1.3&27-292.1,people w/ physical disabilities:failure to provide adequate access.glass entry doors:1st fl public bathroom doors&garage disposal room doors are not in compliance w/ standars acceptable by
Sep 15, 2014 · Penalty $400
Resolve - Class - 2
3314.4.1:installation:upon completion of the installation of the scaffold an inspection report verifying that the scaffold has been installed in accordance with the design drawings. noted:no sign off letter on
Jan 11, 2012
Resolve - Class - 2
3314.6:the footings & anchorage for every scaffold shall be sound & rigid. capable of carrying the maximum load without excessive settlementor deformation & secure against movement in any direction. noted:inade
Jan 11, 2012 · Penalty $400
Resolve - Class - 1
3314.8:guard rail system & toe boards except for scaffold platforms 6 feet or less above the ground the open sides & ends of every scaffold platform shall be provided with a guard rail. system & toe board. note
Jan 11, 2012 · Penalty $1,600
Resolve - Class - 2
3314.9:supported scaffold does not meet code specification. noted:uponinspection found at 8th floor diagonial brace not lock in to pipe frame at 4th floor work platform all planks not secured/tied down througho
Jan 11, 2012 · Penalty $400
Resolve - Class - 1
Failure to institute & maintain safety equipment measures or temporary construction: no handrails: upon inspection as noted on active construction site the are no handrails on the easst side stairwell from 1st
Jan 7, 2012 · Penalty $1,000
Resolve - Class - 1
Failure to maintain adequate housekeeping. per section requirements: partial stop work order: on all floors 1st05th. all work on all floors except to remove drebris & bring the floors into floo into code compli
Jan 7, 2012 · Penalty $2,400
Resolve - Class - 2
Failure to maintain building in code complaint manner: lack of temporary/emergency lighting for exits,exit discharges,& public passageways upon inspection as noted on active construction site the temporary
Jan 7, 2012
Resolve
Show 18 more ↓
- Class - 2
Sec. 3308.3 failure to provide required vertical netting. upon inspection as noted on active construction site up to roof level the vertical netting on all floor levels needs to be repaired replaced & secured @
Jan 7, 2012
Resolve - Class - 2
Sec. 3303.7.2 failure to provide fire extinguishers upon inspection asnoted on active construction site up to roof level there are approx 6#workers on the roof using tar kettles to heat up the roof waterproofin
Jan 7, 2012
Resolve - Class - 2
Bc3310.6 failure to have designated ssm as indicated on pw2 present on site at minimum of once every two weeks examinations of site safety log for dates 7/20/11 & 9/1/11 indicates that ssm#1443 has been signing
Sep 1, 2011
Resolve - Class - 2
Sec. 3308.1.3 horizontal safety netting not provided during new construction. note at time of inspection bldg complete to 4 stys horizontal netting is not installed as per approved site safety plan. that(share)
Jun 29, 2011
Resolve - Class - 2
Work does not conform to approved construction documents & or approvedamendments. note at time of inspection observed roof protection on adjproperty at exp 4 not installed as per approved site safety. plans 2"x
Jun 2, 2011
Resolve - Class - 1
Work w/o a permit. variance - none upon inspection as noted on active construction site at cellar level concrete walls poured there were approx #8 workers on site at 8:15am off loading concrete pump pipes,strip
Apr 9, 2011 · Penalty $1,600
Resolve - Class - 2
Sec. 28-105.1 work w/o a permit - work w/o variance permit. observed on saturday workers are working on concrete retaining wall including rebar & form work. after hour variance permit allowed only debris remova
Jan 29, 2011 · Penalty $800
Resolve - Class - 2
Work does not conform to approved construction documents and/or approved amendments. noted: at time of inspection at above mention job site observed no fence enclosure at south elevation (madison ave side), as
Jan 13, 2011
Resolve - Class - 1
Sec. 3303.4.1. failure to maintain public sidewalk as per section requirements. noted: at time of inspection at pedestrian walkway (by the west corner) of east 111 st side observed accumulations of ice & snow
Jan 13, 2011 · Penalty $1,600
Resolve - Class - 2
Sec. 28-105.11 failure to post work permit on construction or demolition site in a conscious location. noted at time of inspection observed open excavation site with construction fence on street elevation (expo
Jul 30, 2009
Resolve - Class - 2
Sec. bc 3307.2.1 failure to provide artificial light for temporary walkway on public street. noted at time of inspection observed construction site with dot closed sidewalk permit & temporary walkway with no
Jul 30, 2009
Resolve - Class - 2
Sec. bc 3307.7. construction fences. noted: at time of inspection observed open excavation site with 2 excavation machines in pit,& no continous const. fence around all sides of lot lines. exposure #1 was 8'ply
Jul 30, 2009
Resolve - Class - 2
Sec. bc 3307.4.1 failure to provide warning signs & light or other safety devices. noted: at time of inspection observed approx 150'ft of temporary walkway in street with plastic jersey barricade & chain link
Jul 30, 2009
Resolve - Class - 2
Failure to provide artificial light for temp walkway on the street. public sidewalk is occupied by the construction fence. a temp walk is apprx 200' long no artificial lighting has been provided for night time
May 18, 2009
Resolve - Class - 1
Sec. 3313.1 27-1069 storage & use of compressed,combustible volatile gases & diesel at site w/o fdny permit upon inspection excavation & shoring for foundation of nb is in progress. at time of inspection observ
Mar 11, 2009 · Penalty $1,600
Resolve - Class - 1
Sec. 3310.3 failure to conform to site safety plan & program upon inspection observed excavation & shoring work for foundation of nb is in progress,test piles driven,approx 100ft x 70 ft & 8ft deep hole excava
Mar 11, 2009 · Penalty $1,200
Resolve - Class - 1
Failure to safeguard all persons and prop affected by const operationsseveral vertical cracks have developed in the retaining wall along property line between 64 e 111 st & 55 e 110 st and also the car park at
Mar 11, 2009
Resolve - Class - 1
Failure to safeguard all persons and prop affected by const operationsthe rubble foundation under the retaining wall along property line between 64 east 111 st & 55 e 110 st has collapsed at several points & so
Feb 27, 2009
Resolve
Complaints
- Electric
Wiring
Aug 18, 2023 · Apt 210
Close - Unsanitary condition
Mold
Jan 31, 2020 · Apt 1203
Close - Unsanitary condition
Pests
Oct 28, 2019 · Apt 210
Close - Unsanitary condition
Mold
Oct 28, 2019 · Apt 210
Close - Unsanitary condition
Sewage
Oct 28, 2019 · Apt 210
Close - General
Ventilation system
Oct 11, 2019 · Apt 311
Close - Heat/hot water
Entire building
Mar 11, 2017 · Apt 1
Close - General
Ventilation system
Jan 26, 2015 · Apt 311
Close - General
Ventilation system
Jan 13, 2015 · Apt 311
Close - General
Ventilation system
Nov 20, 2014 · Apt 311
Close
Show 5 more ↓
- General
Ventilation system
Nov 20, 2014 · Apt 311
Close - General
Ventilation system
Nov 13, 2014 · Apt 311
Close - General
Ventilation system
Nov 13, 2014 · Apt 311
Close - General
Ventilation system
Nov 6, 2014 · Apt 311
Close - General
Ventilation system
Nov 6, 2014 · Apt 311
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D4)
- Year built
- 2011
- Floors
- 12
- Residential units
- 122
- Building area
- 147,590 ft²
- Lot area
- 19,276 ft²
- Zoning
- R8A
- Community board
- 111
- Council district
- 8
- Block / lot
- 1616 / 49
- Assessed value
- $14,278,500
- Landmark / historic district
- No
HPD registration #143573, last renewed Aug 26, 2025.
Questions about 64 East 111 Street
Who owns 64 East 111 Street?
The owner of record in NYC Department of City Planning PLUTO data is La Celia Owners Corp..
Does 64 East 111 Street have violations?
Yes. NYC HPD has recorded 3 housing violations at this property.
Is 64 East 111 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 64 East 111 Street built?
City records list 2011 as the year it was built.
How many apartments are in 64 East 111 Street?
It has 122 residential units and 123 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.