510 East 86 Street
Manhattan, NY 10028BBL 1-01582-0046Map
Owner of record: 510 East 86th St Owners INC
510 East 86 Street is an elevator apartment building built in 1958 in Manhattan, 10028. It has 94 residential units across 21 floors. The owner of record is 510 East 86th St Owners INC. HPD has recorded 17 housing violations here, most recently on May 20, 2025. 11 of the 17 most recent violations are still open.
- HPD violations
- 17
- DOB violations
- 31
- ECB violations
- 7
- HPD complaints
- 12
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 17
- ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
May 20, 2025
Open — Invalid certification - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
May 20, 2025
Open — Invalid certification - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
May 20, 2025
Open — Invalid certification - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
May 20, 2025
Open — Invalid certification - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
May 20, 2025
Open — Invalid certification - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
May 20, 2025
Open — Invalid certification - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
May 20, 2025
Open — Invalid certification - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
May 20, 2025
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 15, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 25, 2016
Closed — Violation dismissed
Show 7 more ↓
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 1, 2015
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at stove for cooking in the kitchen located at apt 4c, 4th story, 1st apartment from west at north
Apr 6, 2015 · Apt 4C
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at lobby
Apr 6, 2015
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color water damaged north wall in the 1st room from north at west located at apt 12c, 12th story, 1st apartment from west at north
May 22, 2006 · Apt 12C
Closed — Violation closed - BHazardous
D26-10.01 adm code & 309 m/d law abate the nuisance consisting of wooden fence erected 21 sty terrace at south.
Sep 9, 1992
Closed — Violation closed - ANon-hazardous
Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration dry wall installation 1 sty public hall center east and west.
Sep 9, 1992
Open — Not complied with - BHazardous
D26-10.01 adm code properly repair the broken or defective exhaust fan 3rd sty southeast apt 3a bathroom. , section '' ''
Jul 12, 1982 · Apt 3A
Open — Not complied with
DOB building violations · 31
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 24, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 24, 2018
Dob violation - resolved - Construction other optional
The borough commissioner has issued a stop work order for application #102328642 due to applicant withdrawal. stop all work immediately, mak e site safe, contact boro comm office asap w/the appropriate informati on
Jan 20, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 11, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 11, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 2, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 2, 2015
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed
Show 21 more ↓
- Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - active - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2010 inspection/test
Dec 13, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 8, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 8, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 6, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 6, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 14, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 14, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 13, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 13, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 2, 2004
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 2, 2004
Dob violation - resolved - Elevator elevatorrequired
1p23960
Dec 17, 2002
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 2, 1990
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 2, 1990
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 24, 1989
Dob violation - resolved
ECB violations · 7
- Class - 2
Removal of shed or protective measures without departments approval.atthe time of my inspection of a proposed 21 facade alteration i observed workers at exposure 1 dismantling a sidewalk shed.i observed that no
Mar 29, 2021 · Penalty $1,250
Resolve - Class - 2
44r05.44r file for permit to install new traction sheave & perform test in the presence of a dob inspector
Jan 23, 2009 · Penalty $800
Resolve - Class - 1
56y13.39y02.40y02.75k10.78b14.56y repair & seal glan packing 75k repair rusted buffer steel car & cwt *78b shorten governor rope sheave hitting pit fl to lift c use call d smith at 212 566-5544
Jan 23, 2009 · Penalty $1,000
Resolve - Non-hazardous
39h 50y 34 regroove traction sheive 50 properly seal machine
Sep 19, 1998
Resolve - Non-hazardous
47b 47 shorten governor safety cable
Sep 19, 1998
Resolve - Non-hazardous
22d,21l,
Aug 9, 1991 · Penalty $150
Resolve - Non-hazardous
22d; 28h; 21l.
Feb 15, 1991 · Penalty $150
Resolve
Complaints
- Water leak
Heavy flow
Feb 4, 2025 · Apt BASEME
Close - General
Ventilation system
May 19, 2020 · Apt 7B
Close - Heat/hot water
Entire building
Apr 3, 2015 · Apt 2C
Close - Plumbing
Basin/sink
Jul 30, 2011 · Apt 19B
Close - Plumbing
Toilet
Jul 30, 2011 · Apt 19B
Close - General
Ventilation system
Jul 30, 2011 · Apt 19B
Close - Plumbing
Bathtub/shower
Jul 30, 2011 · Apt 19B
Close - Nonconst
Vermin
Jul 30, 2011 · Apt 19B
Close - Plumbing
Water-leaks
May 19, 2006 · Apt 12C
Close - Paint/plaster
Wall
May 19, 2006 · Apt 12C
Close
Show 2 more ↓
- Paint/plaster
Wall
May 19, 2006 · Apt 12C
Close - Paint/plaster
Ceiling
May 19, 2006 · Apt 12C
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Aug 19, 2026 | $3,500,000 | Coops - elevator apartments | — |
| Aug 19, 2026 | $3,500,000 | Coops - elevator apartments | — |
| Aug 19, 2026 | $3,500,000 | Coops - elevator apartments | — |
| Jun 8, 2026 | Non-market transfer | Coops - elevator apartments | — |
| Feb 12, 2026 | $1,847,500 | Coops - elevator apartments | — |
| Jan 6, 2026 | $637,500 | Coops - elevator apartments | — |
Building details
- Building type
- Elevator apartment building (D4)
- Year built
- 1958
- Floors
- 21
- Residential units
- 94
- Building area
- 123,333 ft²
- Lot area
- 9,996 ft²
- Zoning
- R10A
- Community board
- 108
- Council district
- 5
- Block / lot
- 1582 / 46
- Assessed value
- $14,178,150
- Landmark / historic district
- No
HPD registration #137839, last renewed Sep 24, 2025.
Questions about 510 East 86 Street
Who owns 510 East 86 Street?
The owner of record in NYC Department of City Planning PLUTO data is 510 East 86th St Owners INC.
Does 510 East 86 Street have violations?
Yes. NYC HPD has recorded 17 housing violations at this property.
Is 510 East 86 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 510 East 86 Street built?
City records list 1958 as the year it was built.
How many apartments are in 510 East 86 Street?
It has 94 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.