52 East End Avenue
Manhattan, NY 10028BBL 1-01578-7501Map
Owner of record: 52 East End Condominium
52 East End Avenue is a condominium built in 1988 in Manhattan, 10028. It has 81 residential units across 40 floors. The owner of record is 52 East End Condominium. HPD has recorded 65 housing violations here, most recently on November 11, 2025. 25 of the 50 most recent violations are still open.
- HPD violations
- 65
- DOB violations
- 45
- ECB violations
- 47
- HPD complaints
- 56
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 65
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the 4th room from east located at apt 22c, 22nd story, 1st apartment from east at south
Nov 11, 2025 · Apt 22C
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood sliding closet door in the 4th room from east located at apt 22c, 22nd story, 1st apartment from east at south
Nov 11, 2025 · Apt 22C
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling east wall in the bathroom located at apt 22c, 22nd story, 1st apartment from east at south
Nov 11, 2025 · Apt 22C
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the 4th room from east located at apt 22c, 22nd story, 1st apartment from east at south
Nov 11, 2025 · Apt 22C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the kitchen located at apt 22c, 22nd story, 1st apartment from east at south
Nov 11, 2025 · Apt 22C
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective connection waste line of sink in the kitchen located at apt 22c, 22nd story, 1st apartment from east at south
Nov 11, 2025 · Apt 22C
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the private hallway located at apt 22c, 22nd story, 1st apartment from east at south
Nov 11, 2025 · Apt 22C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the 1st room from east located at apt 22c, 22nd story, 1st apartment from east at south
Nov 11, 2025 · Apt 22C
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges to door in the entrance located at apt 22c, 22nd story, 1st apartment from east at south
Nov 11, 2025 · Apt 22C
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 22c, 22nd story, 1st apartment from east at south
Nov 11, 2025 · Apt 22C
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly repair or replace the broken or defective wood base cabinet at sink in the kitchen located at apt 22c, 22nd story, 1st apartment from east at south
Nov 11, 2025 · Apt 22C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the bathroom located at apt 22c, 22nd story, 1st apartment from east at south
Nov 11, 2025 · Apt 22C
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective base cabinet at wash basin in the bathroom located at apt 22c, 22nd story, 1st apartment from east at south
Nov 11, 2025 · Apt 22C
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... at east wall (approximately 5 sq ft) in the bathroom from east located at apt 22c, 22nd story, 1st apartment from east at south original violation 16068714 issued 29-jun-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Jun 29, 2023 · Apt 22C
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color above the window at the east wall in the 2nd room from east located at apt 22c, 22nd story, 1st apartment from east at south
Jun 29, 2023 · Apt 22C
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective recessed lighting fixture in the 2nd room from east located at apt 22c, 22nd story, 1st apartment from east at south
Jun 29, 2023 · Apt 22C
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective . in the entrance located at apt 22c, 22nd story, 1st apartment from east at south
Jun 29, 2023 · Apt 22C
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective base cabinet at sink in the kitchen located at apt 22c, 22nd story, 1st apartment from east at south
Jun 29, 2023 · Apt 22C
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... (approximately 10 sq ft) at south wall under sink in the kitchen located at apt 22c, 22nd story, 1st apartment from east at south
Jun 29, 2023 · Apt 22C
Open — First no access to re- inspect violation - ANon-hazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 22c, 22nd story, 1st apartment from east at south
Jun 29, 2023 · Apt 22C
Open — Nov sent out - ANon-hazardous
Repair the broken or defective connection sink's drainage in the kitchen located at apt 22c, 22nd story, 1st apartment from east at south
Jun 29, 2023 · Apt 22C
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at east wall (approximately 5 sq ft) in the bathroom from east located at apt 22c, 22nd story, 1st apartment from east at south
Jun 29, 2023 · Apt 22C
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at shower ceiling and east wall in the bathroom from east located at apt 22c, 22nd story, 1st apartment from east at south
Jun 29, 2023 · Apt 22C
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at east wall in the bathroom from east located at apt 22c, 22nd story, 1st apartment from east at south
Jun 29, 2023 · Apt 22C
Open — Nov sent out - ANon-hazardous
Repair the broken or defective connection at wash basin drainage in the bathroom from east located at apt 22c, 22nd story, 1st apartment from east at south
Jun 29, 2023 · Apt 22C
Open — Nov sent out - ANon-hazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom from east located at apt 22c, 22nd story, 1st apartment from east at south
Jun 29, 2023 · Apt 22C
Open — Nov sent out - ANon-hazardous
Repair the broken or defective connection at wash basin drainage in the bathroom from east at south located at apt 22c, 22nd story, 1st apartment from east at south
Jun 29, 2023 · Apt 22C
Open — Nov sent out - ANon-hazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom from east at south located at apt 22c, 22nd story, 1st apartment from east at south
Jun 29, 2023 · Apt 22C
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 6, 2017
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 25, 2016
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak above windows at ceiling in the kitchen located at apt 36, 36th story
May 25, 2016 · Apt 36
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling and north wall at north room located at apt 36, 36th story
May 25, 2016 · Apt 36
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling above windows at north east room located at apt 36, 36th story
May 25, 2016 · Apt 36
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling at kitchen, above windows located at apt 36, 36th story
May 25, 2016 · Apt 36
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls at north room located at apt 36, 36th story
May 25, 2016 · Apt 36
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling above windows at north east room located at apt 36, 36th story
May 25, 2016 · Apt 36
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling at north east at public hall, 37th story
May 25, 2016
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls ,north east at public hall, 37th story
May 25, 2016
Closed — Violation dismissed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak ....at east wall in the 2nd room from east located at apt 31, 2nd story
Feb 26, 2016 · Apt 31
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak ...at ceiling in the 1st room from east located at apt 31, 31st story
Feb 26, 2016 · Apt 31
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 31, 31st story
Feb 26, 2016 · Apt 31
Closed — Violation dismissed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak .. south wall and ceiling in the 3rd room from east located at apt 31, 2nd story
Feb 26, 2016 · Apt 31
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color .. south wall and ceiling in the 3rd room from east located at apt 31, 2nd story
Feb 26, 2016 · Apt 31
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ....at east wall in the 2nd room from east located at apt 31, 2nd story
Feb 26, 2016 · Apt 31
Closed — Violation dismissed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east located at apt 36thfl, 36th story, 1st apartment from north at east
Feb 26, 2016 · Apt 36THFL
Closed — Violation dismissed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 4th room from east located at apt 36thfl, 36th story, 1st apartment from north at east
Feb 26, 2016 · Apt 36THFL
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east located at apt 36thfl, 36th story, 1st apartment from north at east
Feb 26, 2016 · Apt 36THFL
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 36thfl, 36th story, 1st apartment from north at east
Feb 26, 2016 · Apt 36THFL
Closed — Violation dismissed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling and walls in the 3rd room from north located at apt 36thfl, 36th story, 1st apartment from north at east
Feb 26, 2016 · Apt 36THFL
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at walls ang ceiling in the 3rd room from north located at apt 36thfl, 36th story, 1st apartment from north at east
Feb 26, 2016 · Apt 36THFL
Closed — Violation dismissed
DOB building violations · 45
- Elevator elevatorrequired
E-elevator elevatorrequired
Dec 28, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 28, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 28, 2020
Dob violation - resolved - Facade safety program facade required
Fisp-facade safety program facade required
Aug 7, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 14, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 14, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 14, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 19, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 19, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 19, 2016
Dob violation - resolved
Show 35 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 14, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 29, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 29, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 19, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 19, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 19, 2013
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 24, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 24, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 24, 2012
Dob violation - resolved - Facade facade optional
Unsafe local law 11/98 report filed
Aug 15, 2012
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 17, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 17, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 17, 2011
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 23, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 30, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 30, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 30, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 26, 2010
Dob violation - resolved - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 21, 2009
Dob violation - resolved - Facade facade required
L1198-local law 11/98 - facade facade required
Jun 25, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 1, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 1, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 1, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 27, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 27, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 27, 2005
Dob violation - resolved - Elevator elevatorrequired
1p35144
Dec 10, 2002
Dob violation - resolved - Elevator elevatorrequired
1p35145
Dec 10, 2002
Dob violation - resolved - Elevator elevatorrequired
1p35123
Dec 10, 2002
Dob violation - resolved
ECB violations · 47
- Class - 2
Failure to obtain construction permit for fence.at the time of my inspection,i observed that a construction fence was installed at exposures1 and 4 without written permit for its construction.for public safety
Mar 8, 2021 · Penalty $625
Resolve - Class - 2
Expired term of permit for temporary equipment.at the time of my inspection,i observed that the permit for the approx 18 feet high supportedscaffold system used as temporary stair tower at exposure1(permit numb
Mar 8, 2021 · Penalty $1,250
Resolve - Class - 2
Failure to post or distribute "safe construction bill of rights"at thetime of inspection of a 40 story existing building where facade work is being performed i observed no bill of right was posted on building l
Nov 14, 2019
Resolve - Class - 1
Sidewalk shed extension(20'whenmore > 100' in height)at time of inspection of a 40 story existing building i observed hanging scaffold on exp 1 and 4 doing facade work out scaffold on exp1 and corner one not ac
Nov 14, 2019 · Penalty $10,000
Resolve - Class - 2
Failure to distribute tenant protection plan.at the time of inspectionof a 40 story building i observed that no tenant protection plan was posted on lobby walls,stairs,tenant doors or any conspicous place leavi
Nov 14, 2019
Resolve - Class - 2
Failure to maintain display on site documents required by chapter 33.at the time of inspection of a 40 story building where facade work was being done i observed workers doing stitching and pointing on exp4 on
Nov 14, 2019
Resolve - Class - 2
Failure to notify deapartment 24hour prior to suspended scaffold installation.noted:at time of inspection 2 susupended scaffolds in connection with outriggers installed at exp#4 without prior notifying departme
Jul 10, 2018
Resolve - Class - 2
Failure to maintain exterior bldg facade & appurtenances. note: south elevation (south/west side) exp#2, on 36 flr. observed loose/missing window cracking around window. causing water penetration inside ceiling
Nov 4, 2016 · Penalty $2,500
Active - Class - 2
Failed to provide sidewalk shed parapet sign ace to 3301.9. noted: at time of inspection sidewalk shed missing parapet sign ace to 3301.9. rem: provide sidewalk shed parapet sign ace to 3301.9
Jun 29, 2016 · Penalty $400
Resolve - Class - 2
Pedestrian protection does not meet code specs. noted: at time of inspection sidewalk shed on e. 82 st side is not tight for structure. rem:conform shed to code specs.
Jun 29, 2016 · Penalty $2,400
Resolve
Show 37 more ↓
- Class - 2
Bc 3307.6.5 failure to maintain sidewalk shed as required by code.note:@time of insp,sidewalk shed erected under job #140038242 along exp#1 & exp#4,is poorly maintained in that 2 bulbs are missing the water res
Jan 3, 2016
Resolve - Class - 2
Failure to file an acceptable amended cycle 7 report to this dept indicating correction of unsafe conditions described in initial local law fisp report. remedy: file an amended report following remedial repairs
Dec 11, 2015 · Penalty $4,000
Resolve - Class - 2
28-317.3 failure to register cooling tower.rem comply w/ code.
Sep 21, 2015 · Penalty $4,000
Resolve - Class - 2
Work does not conform to approved const docs & and approved amendmentsobserved sidewalk shed erected at exp.#1 east end ave)& exp4 (e 82 st)under permit #140038242-01-eq-sh:1-overhead cross braces some places
May 18, 2015
Resolve - Class - 1
Failure to have site safety managet present as required. noted: 40 story resident bldg w/ on going facade work in process which required a "rull time site safety manager" site safety manager a no shown. pswo (a
Oct 17, 2014 · Penalty $1,200
Resolve - Class - 2
Failed to notify dept/obtain permit prior to use/inst of c-hooks in connection w/suspended scaffold. noted: no notification. at time of inspection rigging was taking place. remedy: comply w/code. notify the dep
Sep 17, 2014 · Penalty $400
Resolve - Class - 2
Pswo: (sidewalk shed) issue pursuit to 28-207.2 & posted. pedestrian protection does not meet code specs. noted: all suspended scaffold workto cease above sidewalk deck. reason scaffold decking in total disrepa
Sep 17, 2014 · Penalty $2,400
Resolve - Class - 2
Occupancy contrary to that allowed by the c/o. noted: at the cellar currently occupied by a 12' x 10' gym (1/2) & 16' x 12' gym (1/2) combined & utilities contrary to c/o #95094 which states the legal occupancy
Oct 27, 2012 · Penalty $1,200
Active - Class - 2
Failure to provide safety measures (such as sidewalk shed, fence etc) to protect public from unsafe conditions as per 1rcny 103-04 & as per unsafe conditions complaint #1331414 by ra/pe dated 8.10.12. remedy:
Aug 21, 2012 · Penalty $4,000
Resolve - Class - 1
Failure to comply w/commissioner's order to correct condition cited in nov #34833676h for illegal gas line. remedy: comply w/order.
Jan 20, 2011 · Penalty $6,000
Resolve - Class - 1
Unlawful acts faiulre to comply w/ an order of the comm's.note:respondent failed to correct the conditions cited in the prior nov 34833676h for work w/o a permit;installed gas line for outdoor cooking on roof
Nov 24, 2010 · Penalty $6,000
Resolve - Class - 1
Failure to comly w/an order of the commissioner. respondent failed to correct the conditions cited in the prior nov #34833676h, having installed gas line for outdoor cooking on top of roof, constructed wood
Jun 21, 2010 · Penalty $2,400
Resolve - Class - 1
Occupancy contrary to that allowed by c of o.job #103852948-not signed off "create new green house roof in conjunction w/existing apt.40fl relocate existing roof drain & greenhouse to remain unheated-current oc
Jan 28, 2010
Resolve - Class - 1
Work w/o permit-roof.1-installed gas line for outdoor cooking-less than 10'-0 ft from door 2-installed composite wood decking throughout 3-installed brick chimney.no cooking on roof deck.remedy:obtain permit or
Jan 28, 2010 · Penalty $1,600
Resolve - Class - 3
Failure to maintain building in code-compliant manner.at roof green house-south center roof standing water-at roof greenhouse-roof drains not attached to bldging various locations roof drain not installed per c
Jan 28, 2010 · Penalty $200
Resolve - Class - 2
Failure to maintain housekeeping in a code compliant manner at 42 fl terrace,terrace pavers stacked along roof perimeter in piles causing a trp hazard awo note this is a re-occuring condition ecb#3477519p.remed
Dec 3, 2009 · Penalty $2,000
Resolve - Class - 1
Failure to maintain bldg interior in a code compliant manner.noted defect at apt ph2(40thfl at kitchen kitchen ceiling has collapsed(drywall)due to leaks above also ph2 duplex level bedroom at 41st fl.has le
Dec 3, 2009
Resolve - Class - 2
Failure to maintain building in code-compliant manner noted: roof leaking allowing water to penetrate into apt designated ph2 in various locations throughout. water has caused partial collapse of sheetrock ceil
Sep 30, 2009 · Penalty $500
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements: noted at roof work under job #110195244 counter weights,pavers,roofing membrane protection 1 section pipe scaffold & rigging cable left on roo
Sep 30, 2009
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements note at roof top terrace level large amounts of masonry debris and wood improperly stored job 110195244 remedy: maintain good houskeeping in a
May 8, 2009 · Penalty $800
Resolve - Non-hazardous
Vio: bp7 (55y10/13, 14m07,84l07,27o02,05l11) 55-y: hoist machine oiled, repaired, seal, maintain,clean. oil had leak down into shaft. check on machine. 14-m: car-mirror missing (resident), 84-l: car latern; no
Jun 9, 2008 · Penalty $350
Resolve - Non-hazardous
14m07, 15d06, 38q07, 68o02, 66o02, 64l11, 71q07, 71m07, 39m07, 41n11. 38-q provide workable bulb & guard lite. 66-o clean pit, piston's, oiled, fix, repair, seal. 71-m pull string for lite, provide everything
Sep 4, 2007 · Penalty $180
Resolve - Non-hazardous
Exit passage or corridor: required width decreased by obstruction. noted exit poassageway to public stairwell totally obstructed by xerox color printer box, bags, tools, animal transport kennel & wooden trim. l
Sep 13, 2004 · Penalty $880
Active - Non-hazardous
Exit passageway or corridor required width decreased by obstruction note on 18th floor exit passageway obstructed by 2 tables approx 20"x48"x32" and other household items(glass table top).remedy:remove all
Dec 21, 2003 · Penalty $180
Active - Non-hazardous
60l11/ 62y11/ 37#09/ 60q03/ (60) pit light is defective - (60) pit light is unguarded (62) pit has oil leak - accumulating oil in pit (37) machine room door way is obstructed - no easy access to machine roo
May 12, 2003
Resolve - Non-hazardous
17m07/ (17) hoistway door panels on lobby level are missing second door gib per door panel
May 12, 2003
Resolve - Non-hazardous
17m07/ (17) hoistway door panels on lobby level are missing second door gibs per door panel
May 12, 2003
Resolve - Non-hazardous
Failure to provide 3" elevator i.d signs on all floors. remedy:provide signage as per local-law 16/84 code.
Jul 24, 2000 · Penalty $200
Active - Non-hazardous
Failure to file a report of compliance with local law 16/84, certifying to the installation of required fire protection systems. remedy:filereport
Jul 24, 2000 · Penalty $200
Active - Non-hazardous
22d6, 14m7, 3l12, 57o2, 3-replace handle on car wall.
Sep 2, 1998
Resolve - Non-hazardous
22d6, 74h12, 75o2, 74-replace study plate worn out top of car
Sep 2, 1998
Resolve - Non-hazardous
46y2, 57o2,
Sep 2, 1998
Resolve - Non-hazardous
, 55x11, 57o2, 11q3
Oct 18, 1994 · Penalty $100
Resolve - Non-hazardous
75u5, 55x11, 57o2
Oct 18, 1994 · Penalty $200
Resolve - Non-hazardous
75u,55x,57o.
Oct 18, 1994 · Penalty $200
Resolve - Non-hazardous
Expired permit sidewalk shed permit 100434601 expired on 123192 shed is still in pl and permit has not been renewed remedy:renew permit or remove shed.
Mar 17, 1993 · Penalty $175
Resolve - Non-hazardous
38o002.66o02.15b07.03h07.16h.i10.05i10.40t07.84m07 15b sign in certficate frame to locate inspection cert. & repair frame properly 03h car doors ostricals missing provide 16hi c level replace ostricals 40t labe
Feb 26, 1980 · Penalty $350
Resolve
Complaints
- Paint/plaster
Wall
Oct 18, 2025 · Apt 22C
Close - Door/window
Door
Oct 18, 2025 · Apt 22C
Close - Water leak
Slow leak
Oct 18, 2025 · Apt 22C
Close - General
Cabinet
Oct 18, 2025 · Apt 22C
Close - Flooring/stairs
Floor
Oct 18, 2025 · Apt 22C
Close - Unsanitary condition
Mold
Oct 18, 2025 · Apt 22C
Close - Heat/hot water
Entire building
May 23, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 21, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 27, 2024 · Apt BLDG
Close - Paint/plaster
Wall
Jun 27, 2023 · Apt 22C
Close
Show 40 more ↓
- Electric
Lighting
Jun 27, 2023 · Apt 22C
Close - Door/window
Door
Jun 27, 2023 · Apt 22C
Close - Flooring/stairs
Floor
Jun 27, 2023 · Apt 22C
Close - General
Cabinet
Jun 27, 2023 · Apt 22C
Close - Unsanitary condition
Mold
Jun 27, 2023 · Apt 22C
Close - Water leak
Heavy flow
Jun 27, 2023 · Apt 22C
Close - Heat/hot water
Apartment only
Jan 17, 2019 · Apt 21A
Close - Heat/hot water
Apartment only
Dec 9, 2018 · Apt 21A
Close - Water leak
Heavy flow
Jul 28, 2016 · Apt 36FL
Close - Water leak
Heavy flow
Jul 28, 2016 · Apt 36FL
Close - Unsanitary condition
Mold
May 24, 2016 · Apt 36
Close - Unsanitary condition
Mold
Jan 11, 2016 · Apt 31
Close - Water leak
Heavy flow
Jan 7, 2016 · Apt 36THFL
Close - Water leak
Heavy flow
Jan 7, 2016 · Apt 36THFL
Close - Unsanitary condition
Mold
Jan 7, 2016 · Apt 36THFL
Close - Unsanitary condition
Mold
Jan 7, 2016 · Apt 36THFL
Close - Water leak
Slow leak
Jan 7, 2016 · Apt 36THFL
Close - Water leak
Slow leak
Jan 7, 2016 · Apt 36THFL
Close - Water leak
Slow leak
Jan 7, 2016 · Apt 36THFL
Close - Unsanitary condition
Mold
Jan 7, 2016 · Apt 36THFL
Close - Heating
Heat related
Oct 24, 2011 · Apt BLDG
Close - Heating
Heat related
Oct 21, 2011 · Apt 7B
Close - Heating
Heat related
Oct 14, 2011 · Apt BLDG
Close - Heating
Heat related
Oct 28, 2010 · Apt 29
Close - Heating
Heat related
Oct 22, 2010 · Apt 22A
Close - Heating
Heat related
Apr 27, 2010 · Apt BLDG
Close - Paint/plaster
Ceiling
Sep 21, 2009 · Apt PH2
Close - Paint/plaster
Wall
Sep 21, 2009 · Apt PH2
Close - Electric
Wiring
Sep 21, 2009 · Apt PH2
Close - Plumbing
Water-leaks
Sep 21, 2009 · Apt PH2
Close - Paint/plaster
Ceiling
Jul 9, 2009 · Apt PENT2
Close - Plumbing
Water-leaks
Apr 10, 2009 · Apt PH2
Close - Plumbing
Water-leaks
Apr 10, 2009 · Apt PH2
Close - Plumbing
Water-leaks
Apr 10, 2009 · Apt PH2
Close - Plumbing
Water-leaks
Apr 10, 2009 · Apt PH2
Close - General
Mold
Feb 5, 2009 · Apt PH2
Close - General
Mold
Oct 24, 2008 · Apt 18C
Close - General
Mold
Oct 24, 2008 · Apt 18C
Close - General
Mold
Oct 10, 2008 · Apt 18C
Close - General
Mold
Oct 10, 2008 · Apt 18C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RM)
- Year built
- 1988
- Floors
- 40
- Residential units
- 81
- Building area
- 98,881 ft²
- Lot area
- 4,333 ft²
- Zoning
- R10A
- Community board
- 108
- Council district
- 5
- Block / lot
- 1578 / 7501
- Assessed value
- $15,863,407
- Landmark / historic district
- No
HPD registration #140823, last renewed Nov 1, 2025.
Questions about 52 East End Avenue
Who owns 52 East End Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 52 East End Condominium.
Does 52 East End Avenue have violations?
Yes. NYC HPD has recorded 65 housing violations at this property.
Is 52 East End Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 52 East End Avenue built?
City records list 1988 as the year it was built.
How many apartments are in 52 East End Avenue?
It has 81 residential units and 82 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.