510 East 80 Street
Manhattan, NY 10075BBL 1-01576-7501Map
Owner of record: Carriage House Condominium Board
510 East 80 Street is a condominium built in 1986 in Manhattan, 10075. It has 91 residential units across 15 floors. The owner of record is Carriage House Condominium Board. HPD has recorded 11 housing violations here, most recently on June 4, 2025. 10 of the 11 most recent violations are still open.
- HPD violations
- 11
- DOB violations
- 30
- ECB violations
- 28
- HPD complaints
- 12
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 11
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 4, 2025
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north and west walls in the 1st room from east located at apt 15e, 15th story
Sep 25, 2008 · Apt 15E
Open — Nov sent out - ANon-hazardous
Refit the door at the terrace in the 1st room from east located at apt 15e, 15th story, 1st apartment from north at east
Sep 25, 2008 · Apt 15E
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... mildew at the wood floor in the 1st room from east located at apt 15e, 15th story, 1st apartment from north at east
Sep 25, 2008 · Apt 15E
Open — Nov sent out - BHazardous
Properly repair the broken or defective the metal frame at the east window in the 1st room from east located at apt 15e, 15th story, 1st apartment from north at east
Sep 25, 2008 · Apt 15E
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceilings and walls in the entire apartment located at apt 15e, 15th story, 1st apartment from north at east
Sep 25, 2008 · Apt 15E
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over the ceiling in the 1st room from east located at apt 15e, 15th story, 1st apartment from north at east
Sep 25, 2008 · Apt 15E
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east located at apt 15e, 15th story, 1st apartment from north at east
Sep 25, 2008 · Apt 15E
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the private hallway located at apt 15e, 15th story, 1st apartment from north at east
Sep 25, 2008 · Apt 15E
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of exposed electrical wires at the west wall in the terrace located at apt 15e, 15th story, 1st apartment from north at east
Sep 25, 2008 · Apt 15E
Open — Nov sent out
Show 1 more ↓
- BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 15e, 15th story, 1st apartment from north at east
Sep 25, 2008 · Apt 15E
Open — Nov sent out
DOB building violations · 30
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 11, 2024
Dob violation - dismissed - Construction other optional
Observed apt # 11g balcony instate of disrepair conditions with cracks, spalling and loose concrete at edge of balcony by the railing post which potential falling condition to terrace of apt # 1c grade level.
Sep 27, 2024
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - dismissed - Plumbing none
Commissioners request for immediate corrective action i observed new gas piping gas valve installed in apartment 10e without a permit observed condition(s) does not comply with section 28-105.1 of the b101 and presents an imminent risk to public safety. correct the situation within 48 hours
Aug 6, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 22, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 22, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 22, 2017
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Feb 20, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 14, 2014
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed
Show 20 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 16, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 16, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 22, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 22, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 22, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 22, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 11, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 11, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 8, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 8, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 30, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 30, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 14, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 14, 2009
Dob violation - resolved - Facade facade required
L1198-local law 11/98 - facade facade required
Jun 25, 2007
Dob violation - dismissed - Construction other optional
C-construction other optional
Sep 10, 2005
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 21, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 21, 2005
Dob violation - resolved - Construction other optional
C-construction other optional
Sep 10, 2004
Dob violation - dismissed
ECB violations · 28
- Class - 2
At time of my inspection on a active 15 story alt job site,i ask qsp-jenry w vasquez to provide toolbox talk log ,none was provided/available. comply with code
Oct 30, 2025
Resolve - Class - 1
Observed apt # 11g balcony instate of disrepair conditions with cracks, spalling and loose concrete at edge of balcony by the railing post which potential falling condition to terrace of apt # 1c grade level. a
Sep 27, 2024 · Penalty $2,500
Resolve - Class - 2
3303.10 tenant protection plan not being complied with. observed no track mat also no 6 mil plastic around the door as stated in the tpp. the job number is as follows m00922385-i1-pc and the work is in apt. 1b
Oct 26, 2023
Resolve - Class - 3
28-302.1 failure to maintain bldg in codecompliance.ato my insp "exterior wall condition cert" wasnt posted in interior of bldg (lobby or vestibule rm) comply w/code as per 1rcny103-04
Oct 20, 2021
Resolve - Class - 1
Gas being supplied to building without inspection and certification by dob i observed on the 10 floor in apartment 10e gas supplying stove without without dob certification, file for required permits and have n
Aug 6, 2021 · Penalty $5,000
Resolve - Class - 1
Failure to have new or altered plumbing system tested i observed on the 10 floor in apartment 10e gas pipe and gas valve was installed without permit therefore no test, perform test
Aug 6, 2021 · Penalty $2,500
Resolve - Class - 1
Work without a permit i observed on the 10 floor in apartment 10e installed gas piping and gas valve behind stove work done 100 percent, obtain permit
Aug 6, 2021
Resolve - Class - 2
Expired permit for sws.observed expired permit posted for sws @ exp#1 a review of dept records showed expired permits for sidewalk shed at exp#1.stop all exterior work use of sws.rem:aquire/renew permit and
Oct 1, 2018
Resolve - Class - 2
Failure to maintain exterior building facade and appurtenances. *southelevation exposure 3, observed cracked concrete slab/ eyebrow on 14th floor. rmdy: maintain exterior building facade, repair unsafe conditio
Jul 25, 2018 · Penalty $1,250
Resolve - Class - 2
3314.16.4.failure to have angle scaffold preinspected by department prior to use.noted:@ time of inspection 3ft suspended scaffold that installed @ exp #3 on south west corner being used without preinspection b
Nov 8, 2017
Resolve
Show 18 more ↓
- Class - 2
Partial swo issued for suspended scaffold pursuant 28207.2 & posted onpremises.work does not conform to approved plans.noted:@ time of inspection no protection provided to adjoining property @ 1498 york ave whi
Nov 8, 2017
Resolve - Class - 2
Pedestrian protection does not meet code specifications.note:at time of inspection i observed sidewalk shed in place on expo#1 that does notmeet code specifications.the vertical members near vehicular acciss po
Apr 14, 2017 · Penalty $400
Resolve - Class - 1
Sec: 3314.15.2. stirrups are to be installed as per manufactures specification. note: @ time of insp observed workers working on suspended scaffold on exp#3 w/ stirrups of suspended scaffold installed more than
Dec 30, 2016 · Penalty $1,600
Resolve - Class - 2
Notification: failed to notify the dept prior to use/install. off c-hooks/ in connection w/ suspended scaffold. note: @ time of insp observed worker working in suspended rope scaffold on c-hook w/out prior noti
Dec 30, 2016 · Penalty $800
Resolve - Class - 1
Sec: sec: 3314.15.3.2. upper block. fiber rope shall not be used wherethe upper block is more than 100ft above the guard or roof setback. note: @ time of insp i observed workers working on rope scaffold on the
Dec 30, 2016 · Penalty $1,600
Resolve - Class - 1
Ssmon duty: site safety manager is required to be on site @ all times when there is a waiver in place. note: @ time of insp observed workersworking on exp#3 on suspended scaffold w/ no site safety manager prese
Dec 30, 2016 · Penalty $2,400
Resolve - Class - 2
Failed to notify dept/obtain permit prior to use/installation off 'c' hooks in connection w/suspended scaffold. noted: no notification/expired notification for 'c' hooks at exp #2,notification #1070086 exp
Mar 7, 2013 · Penalty $400
Resolve - Non-hazardous
Failed to notify the dob prior to the use or installation of "c" hooksor out rigger beams in connection with suspended scaffolds.
Sep 28, 2007
Resolve - Hazardous
Failure to file an amended round fourth report acceptable to this department pursuant to rule r.c.n.y.32-03b(5),indicating correction of hazardous conditions described in initial ll10/80 report remedy file an a
May 3, 2002 · Penalty $400
Resolve - Hazardous
Failure to file anamende round five report acceptable to this department pursuant to rule r.c.n.y. 32-03b(5), indicating correction of hazardous conditions described in initial ll11/98 report. remedy: file an a
Mar 4, 2002 · Penalty $1,000
Resolve - Hazardous
Failure to file an amended round five report acceptable to this deparment pursuant to rule r.c.n.y.32-03b(5),indicating correction of hazardous conditions described in initial ll11/98 report.remedy:file an amen
Jan 11, 2002 · Penalty $1,000
Resolve - Hazardous
Failure to file an amended round five report acceptable to this department pursuant to rule r.c.n.y.32-03b(5),indicating correction of hazardous conditions described in initial ll11/98 report.remedy:file an ame
Nov 30, 2001 · Penalty $400
Resolve - Hazardous
Failure to file an amended round five report acceptable to this dept. pursuant to rule r.c.n.y. 32-03b(5), indicating correction of hazardous conditions described in inital ll10/80 report.remedy:an amended repo
Nov 17, 2000
Resolve - Hazardous
Failure to file an amended round five report acceptable to this department pursuant to rule r.c.n.y. 32-03b(5), indicating correction of hazardous conditions described in initial ll10/80 report.remedy:file an a
Oct 10, 2000
Resolve - Hazardous
Failure to file an amended round five report acceptable to this department pursuant to rule r.c.n.y. 32-03b(5), indicating correction of hazardous conditions described in initial ll10/80 report. remedy:file an
Aug 28, 2000 · Penalty $1,000
Resolve - Hazardous
Failure to file an amend round five report acceptable to this department persuant to rule r.c.n.y. 32-03b(5), indicating correction of hazardous conditions described in initial ll10/80 report.remedy:file an ame
Jul 14, 2000 · Penalty $1,000
Resolve - Non-hazardous
Occupancy contray to that allowed by certificate of occupancy #096862 states at cellar parking 31 cars laundry gas meter elec equip boiler compactor rooms and supt office the parking area occupied with 40 cars
Sep 20, 1995 · Penalty $1,000
Resolve - Non-hazardous
Occupancy contrary to that allowed by the c of o. from legal 31 cars allowed to park to illegal 38 cars at time of inspection. also, 2 motorcycles at time of inspection. remedy: discontinue illegal use.
Nov 25, 1994 · Penalty $1,000
Resolve
Complaints
- Water leak
Damp spot
Dec 1, 2017 · Apt 2G
Close - Water leak
Slow leak
Dec 1, 2017 · Apt 2G
Close - Plumbing
Water-leaks
Aug 12, 2013 · Apt 14E
Close - Plumbing
Water-leaks
Sep 21, 2011 · Apt 15E
Close - Plumbing
Water-leaks
Sep 21, 2011 · Apt 15E
Close - Paint/plaster
Wall
Sep 22, 2008 · Apt 15E
Close - General
Doors
Sep 22, 2008 · Apt 15E
Close - Appliance
Air-conditioner
Sep 22, 2008 · Apt 15E
Close - General
Mold
Sep 22, 2008 · Apt 15E
Close - General
Windows
Sep 22, 2008 · Apt 15E
Close
Show 2 more ↓
- Paint/plaster
Wall
Sep 22, 2008 · Apt 15E
Close - Plumbing
Water-leaks
Sep 22, 2008 · Apt 15E
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RM)
- Year built
- 1986
- Floors
- 15
- Residential units
- 91
- Building area
- 87,395 ft²
- Lot area
- 12,771 ft²
- Zoning
- R8B
- Community board
- 108
- Council district
- 5
- Block / lot
- 1576 / 7501
- Assessed value
- $10,742,414
- Landmark / historic district
- No
HPD registration #140822, last renewed Jul 3, 2025.
Questions about 510 East 80 Street
Who owns 510 East 80 Street?
The owner of record in NYC Department of City Planning PLUTO data is Carriage House Condominium Board.
Does 510 East 80 Street have violations?
Yes. NYC HPD has recorded 11 housing violations at this property.
Is 510 East 80 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 510 East 80 Street built?
City records list 1986 as the year it was built.
How many apartments are in 510 East 80 Street?
It has 91 residential units and 94 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.