1810 1 Avenue
Manhattan, NY 10128BBL 1-01573-0001Map
Owner of record: NYC Housing Authority
1810 1 Avenue is an elevator apartment building built in 1964 in Manhattan, 10128. It has 636 residential units across 24 floors. The owner of record is NYC Housing Authority. HPD has recorded 1 housing violation here, most recently on May 23, 2018. 1 of the 1 most recent violations are still open.
- HPD violations
- 1
- DOB violations
- 65
- ECB violations
- 35
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1
- BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 24b, 24th story, 2nd apartment from south at west
May 23, 2018 · Apt 24B
Open — Nov sent out
DOB building violations · 65
- Plumbing none
Observed in apartment 11j an active gas leak originating from the flexible connector supplying the gas-fired stove, creating a hazardous condition for tenants as per pc 102.3 .
Jan 8, 2026
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2023
Jun 23, 2024
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)
Apr 22, 2023
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2021)
Aug 21, 2022
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)
Jun 20, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 26, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 26, 2021
Dob violation - resolved
Show 40 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Mar 26, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 26, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 25, 2021
Dob violation - resolved - Elevator elevatorrequired
Cease use
Jan 25, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 25, 2021
Dob violation - resolved - Boiler boiler optional
Requesting the following test be performed and results be submitted to dob. 1 internal boiler inspection be performed by qualified boiler inspector. 2 asme csd-1 test to be conducted by authorized person. 3 combustion eff test to be performed. 4 replace pressure relief devices.
Nov 16, 2020
Dob violation - dismissed - Boiler boiler optional
Requesting the following test be performed and results be submitted to dob. 1- internal boiler inspection be performed by qualified boiler inspector. 2-asme -csd-1 test to be conducted by authorized person. 3-combustion eff test to be performed.
Nov 16, 2020
Dob violation - dismissed - Boiler boiler optional
Request the following test be performed and results be submitted to dob. 1 internal boiler inspection by qualified boiler inspector. 2 asme csd-1 test to be conducted by authorized person. 3 combustion eff test to be performed.
Nov 16, 2020
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)
Jun 29, 2020
Dob violation - dismissed - Boiler boiler optional
Failure to maintain-found corroded hand holes, gauge glass protection needed, discharge pipe on gg assembly missing, sight glass or chamber door missing, mechanical damper linkage missing at smoke hood, replace defective pressure relief device, cold water feed line corroded.
Mar 3, 2020
Dob violation - dismissed - Boiler boiler optional
Failure to maintain-found corroded hand holes, gauge glass needs protection, discharge ¢iping on gauge glass assembly missing, secure access doors front and rear(bolts missing), corroded manhole, replace explosion door springs and gasket.
Mar 3, 2020
Dob violation - dismissed - Boiler boiler optional
Failure to maintain-rear chamber door needs to be resealed, hand holes corroded, gauge glass protection needed, discharge pipe on gg assembly missing, replace explosion door springs and gasket.
Mar 3, 2020
Dob violation - dismissed - Boiler boiler optional
Failure to maintain-boiler room-mechanical combustion air louver not interlocked with burners, return lines leaking in crawl space water leaking through wall onto electrical conduit, domestic cold water booster pump leaking (pump #2)
Mar 3, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 10, 2020
Dob violation - resolved - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2017)
Mar 27, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 7, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 7, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 7, 2017
Dob violation - resolved - Nycha elev annual inspection/test elevatorrequired
Vio issued to nycha elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Nycha elev annual inspection/test elevatorrequired
Vio issued to nycha elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Nycha elev annual inspection/test elevatorrequired
Vio issued to nycha elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2016)
Feb 16, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years(2015)
Jun 1, 2016
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years
Jun 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Failure to submit eer none
Failure to submit an energy efficiency report (eer) per ad. code sec. 28-308.4
Dec 31, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Dec 4, 2013
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Dec 4, 2013
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Dec 4, 2013
Dob violation - dismissed - Facade facade optional
Ll11/98-local law 11/98 - facade facade optional
Feb 20, 2010
Dob violation - dismissed - Facade facade optional
Ll11/98-local law 11/98 - facade facade optional
Feb 20, 2010
Dob violation - dismissed - Facade facade optional
Ll11/98-local law 11/98 - facade facade optional
Feb 20, 2010
Dob violation - dismissed
ECB violations · 35
- Class - 1
Failure to maintain building in code-compliant manner. as noted at time of inspection on a 1 story building using for materials storage by nyc housing authority. observed cracked/spalled concrete at beams and c
Sep 29, 2026 · Penalty $2,500
Active - Class - 1
Failure to maintain building in code-compliant manner.as noted:at timeof inspection on a 1 story building using for materials storage by nychousing authority.observed cracked/spalled concrete at beams and colum
Jun 24, 2026 · Penalty $2,500
Active - Class - 2
Found to have leaking safety relief valve, exposed wires, dirty glass gauge.
Mar 11, 2022 · Penalty $625
Resolve - Class - 2
Gas connection from gas pressure switch to gas pressure gauge top of burner is not hard pipe/gas pressure gauge top of burner is defective;correct violation and submit the certificate of correction
Nov 22, 2021 · Penalty $625
Resolve - Class - 2
V#39050739r;cease use boiler remains;water leaking into fire chamber/gas connection from pressure switch to pressure gauge top of burner is not hard pipe/king valve leaking above burner;correct violation and su
Nov 22, 2021 · Penalty $625
Resolve - Class - 2
Oil leak at burner/gas connection from gas pressure switch to gas pressure gauge top of burner is not hard pipe/gas pressure gauge top of burner defective;correct violation and submit the certificate of correct
Nov 22, 2021 · Penalty $625
Resolve - Class - 2
As per one federal boiler, serial number 9864. boiler ceased use. boiler 02 not in operation-electrical high voltage box w/o a cover- insulation falling from under boiler- no guards on gauge glasses for make up
Nov 8, 2021 · Penalty $625
Resolve - Class - 1
Failed to notify the dept of an incident/accident that resulted in a fatality or an injury. note: 2 pedestrians were struck by a door when aworker opened a construction door. the injured pedestrians were taken
Oct 13, 2021
Resolve - Class - 1
Failure to safeguard all persons and proerty affected by construction operation.at the time of inspection responding to an incident observedconstruction operation in progress in electrical room which a pedestri
Sep 23, 2021
Resolve - Class - 1
Work does not conform to approved construction documents.at time of inspection proposed 2 stories new building observed,temporary wooden walking platform under excavation area for new utilities lines under walk
Feb 26, 2021 · Penalty $2,500
Resolve
Show 25 more ↓
- Class - 1
Broken lay on the elevator hoist cable. remedy replace?
Jan 25, 2021 · Penalty $1,250
Resolve - Class - 2
(2.12.3.1.1)the car door pressure was at 32 psi. remedy adjust
Jan 25, 2021 · Penalty $625
Resolve - Class - 1
Failure to notify the dept of buildings prior to the commencement of earth work.noted:at time of my inspection of a new 1 story building at excavation phase,i observed various excavations on site for utilities
Mar 19, 2020
Resolve - Class - 2
Construction superintendent failed to perform duties per code.noted:attime of my inspection of a 1 story building,at excavation phase,i observed the only log book was filled out and signed by the competent pers
Mar 19, 2020 · Penalty $2,500
Resolve - Class - 2
Job-site fence not constructed pursuant to subsection:noted:at time ofa new 1 story building at excavation phase,i observed the job-site fence was constructed with wire mesh and pipe which was resting on the ex
Mar 19, 2020 · Penalty $500
Resolve - Class - 1
Failure to maintain/display on-site documents required by chapter 33.noted:at time of my inspection of a new 2 story building at excavation phase,i asked to review the approved drawings for the above project at
Mar 19, 2020 · Penalty $1,250
Resolve - Class - 1
Failure to notify the dept. of buildings prior to the commencement of work.noted:at time of my inspection of a new 3 story building,at excavation phase with piles in place and large excavation,upon researching
Mar 19, 2020
Resolve - Class - 2
Bc330444-inadequate guardrails around excavation when 6 feet or greater in dept.noted:at time of inspeciton of a n/b at excavation phase,i observed inadequate guardrails around excavation appox 8 feet deep.inad
Mar 19, 2020
Resolve - Class - 1
Failure to provide protection at sides of excavation.noted:at time of inspection of a new 2 story buidling at excavation phase,i observed a excavation approx 15ft long by 10 ft wide by 8ft deep without any shor
Mar 19, 2020
Resolve - Class - 2
Failure to post permit for work at premises.noted:at time of my inspection of my a new 2 story building at excavation phase,i observed that no permits were posted around the perimiter of the job,after walking a
Mar 19, 2020 · Penalty $312
Resolve - Class - 1
Bc3314.15.2/stirr ups.stirr ups are to be installed as pet manufactures specification.note:at time of inspection i observed workers working on suspended scaffold installed on expo#2 with stirrups installed 4'f
Mar 7, 2017 · Penalty $1,600
Resolve - Class - 1
3310.8.4site safety logs.logbook must be adequately kept and on site at all times.note:at time of inspection i observed workers working on suspended scaffold on exposure #2 with no site safety log book present
Mar 7, 2017 · Penalty $400
Resolve - Class - 1
3310.4 site condition.condition on site has to be in conformance with ssp.note:at time of inspection on exposure #2 with no pedestrian protection in place as required on the site safety plan.remedy:comply with
Mar 7, 2017 · Penalty $400
Resolve - Class - 1
Failure to maintain bldg wall(s) or appurtenances. note on 3rd floor southeast section of bldg a section of concrete (bottom of reinforce concrete slab) approx 10'x 6"x 3" is missing at exterior terrace. remedy
Sep 9, 2014
Resolve - Class - 2
Failure to provide safety measures sdwlk shed where required according to the cycle#6(tri-6)technical report field as unsafe(upon the notification to the dept of unsafe condition).rem:provide safety measures
Apr 13, 2011
Resolve - Class - 2
Failure to maintain exterior bldg east elevation(exp#3)observe disconnected displacement in metal clad flashing in parapet roof line facade;cracks,deteriorating and displacement in balcony facde.rem:maintain
Apr 13, 2011
Resolve - Class - 2
Failure to file an acceptable sixth round technical report in compliance w/ code provisions : periodic inspection of exterior walls & appurtenances as required by article 28.302 & the d.o.b. rule & regulations
May 10, 2010
Resolve - Class - 2
Failure to file an acceptable sixth round technical report in compliance w/ code provisions : periodic inspection of exterior walls & appurtenances as required by article 28.302 & the d.o.b. rule & regulations
May 10, 2010
Resolve - Class - 2
Failure to file an acceptable sixth round technical report in compliance w/ code provisions : periodic inspection of exterior walls & appurtenances as required by article 28.302 & the d.o.b. rule & regulations
May 10, 2010
Resolve - Class - 2
Failure to submit an acceptable sixth round technical report in compliance w/code provisions periodic inspections of exterior walls & appurtenances as required by article 28.302 & the dept of bldg rules & regul
Dec 19, 2008
Resolve - Class - 2
Failure to submit an acceptable sixth round technical report in compliance w/code provisions periodic inspections of exterior walls & appurtenances as required by article 28.302 & the dept of bldg rules & regul
Dec 19, 2008
Resolve - Class - 2
Failure to submit an acceptable sixth round technical report in compliance w/code provisions periodic inspections of exterior walls & appurtenances as required by article 28.302 & the dept of bldg rules & regul
Dec 19, 2008
Resolve - Non-hazardous
51o2/52o2/41g11/55y13/1l10/2l10/17h11/17d6/66o2/33o2/.51o,52o-clean for proper inspection.41g-replace illegible fuses.55y-seal leaks.1,2l-alarm & stop switch inaudible.17h,d-replace worn & unsecure gibs where
Dec 10, 2007
Resolve - Non-hazardous
1l10/2l10/51o2/52o2/55y13/57h10/41g11/17h11/17d6/66o2/33o2/5j1/10h11/.1,2l-alarm & stop switch inaudible.51,52o-clean for proper inspection.55y-seal leaks.41g-replace illegible fuses.17h,d-replace loose or worn
Dec 10, 2007
Resolve - Unknown
Operation of a place of assembly cafeteria dinning facility(accessory to community center)at the ground floor without a place of assembly permit.community center located at ground floor has been renovated.
Oct 11, 1991 · Penalty $55
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D3)
- Year built
- 1964
- Floors
- 24
- Residential units
- 636
- Building area
- 318,334 ft²
- Lot area
- 157,875 ft²
- Zoning
- R7-2
- Community board
- 108
- Council district
- 8
- Block / lot
- 1573 / 1
- Assessed value
- $27,725,400
- Landmark / historic district
- No
Questions about 1810 1 Avenue
Who owns 1810 1 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is NYC Housing Authority.
Does 1810 1 Avenue have violations?
Yes. NYC HPD has recorded 1 housing violations at this property.
Is 1810 1 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1810 1 Avenue built?
City records list 1964 as the year it was built.
How many apartments are in 1810 1 Avenue?
It has 636 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.