roofy

1660 1 Avenue

Manhattan, NY 10028BBL 1-01566-0048Map

Owner of record: 1660 1st LLC

1660 1 Avenue is a mixed residential and retail building built in 1910 in Manhattan, 10028. It has 6 residential units across 4 floors. The owner of record is 1660 1st LLC. HPD has recorded 41 housing violations here, most recently on February 25, 2021. 7 of the 41 most recent violations are still open.

HPD violations
41
DOB violations
7
ECB violations
8
HPD complaints
72

What to know

Concern
7 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Feb 25, 2021

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 41

  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from east located at apt 4s, 4th story, 1st apartment from east at south

    Feb 25, 2021 · Apt 4S

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak over the ceiling in the 3rd room from east located at apt 4s, 4th story, 1st apartment from east at south

    Feb 25, 2021 · Apt 4S

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant meterial at ceiling at public hall, 4th story

    Feb 25, 2021

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling and south wall at public hall, 4th story

    Feb 25, 2021

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak over the ceiling at public hall, 4th story

    Feb 25, 2021

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Feb 25, 2021

    Closed — Violation closed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Feb 25, 2021

    Closed — Violation closed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Feb 25, 2021

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Feb 25, 2021

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Feb 25, 2021

    Closed — Violation closed
Show 31 more ↓
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Feb 25, 2021

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 24, 2016

    Closed — Violation dismissed
  • B

    Remove all encumbrances consisting of construction ladders, brooms and garbage cans at public hall, 1st story

    Jan 31, 2013

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the kitchen , the 2nd room from east located at apt 3s, 3rd story, 1st apartment from east at south

    Oct 20, 2012 · Apt 3S

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 2nd window frame from south at west wall in the 4th room from east located at apt 3s, 3rd story, 1st apartment from east at south

    Oct 20, 2012 · Apt 3S

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 3s, 3rd story, 1st apartment from east at south

    Oct 20, 2012 · Apt 3S

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 1; in the entire apartment located at apt 3s, 3rd story, 1st apartment from east at south

    Oct 20, 2012 · Apt 3S

    Closed — Violation closed
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 3s, 3rd story, 1st apartment from east at south

    Oct 20, 2012 · Apt 3S

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 3s, 3rd story, 1st apartment from east at south

    Oct 20, 2012 · Apt 3S

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective ceramic tile at floor and south wall in the bathroom located at apt 3s, 3rd story, 1st apartment from east at south

    Oct 20, 2012 · Apt 3S

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling, south and west wall at public hall, 1st story

    Oct 16, 2012

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling, south and west wall at public hall, 1st story

    Oct 16, 2012

    Closed — Violation closed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 3s, 3rd story, 1st apartment from east at south

    Oct 16, 2012 · Apt 3S

    Closed — Violation dismissed
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 3s, 3rd story, 1st apartment from east at south

    Oct 16, 2012 · Apt 3S

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the north wall in the kitchen located at apt 3s, 3rd story, 1st apartment from east at south

    Mar 8, 2011 · Apt 3S

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 4th room from east located at apt 3s, 3rd story, 1st apartment from east at south

    Mar 8, 2011 · Apt 3S

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the 3rd room from east located at apt 3s, 3rd story, 1st apartment from east at south

    Feb 9, 2011 · Apt 3S

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, 1st door frame from south at west wall in the 2nd room from east located at apt 3s, 3rd story, 1st apartment from east at south

    Feb 9, 2011 · Apt 3S

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, north wall, west wall in the 4th room from east located at apt 3s, 3rd story, 1st apartment from east at south

    Feb 9, 2011 · Apt 3S

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall in the 2nd room from east located at apt 3s, 3rd story, 1st apartment from east at south

    Nov 4, 2010 · Apt 3S

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, north wall, south wall, west wall in the 3rd room from east located at apt 3s, 3rd story, 1st apartment from east at south

    Nov 4, 2010 · Apt 3S

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, south wall, west wall, 1st wall cabinet from east at south wall, 1st window frame from north at east wall in the kitchen located at apt 3s, 3rd story, 1st apartment from east at south

    Nov 4, 2010 · Apt 3S

    Open — Defect letter issued
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color , ceiling, north wall in the kitchen located at apt 3s, 3rd story, 1st apartment from east at south

    Nov 4, 2010 · Apt 3S

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department , 1st door frame from west at north wall in the kitchen located at apt 3s, 3rd story, 1st apartment from east at south

    Nov 4, 2010 · Apt 3S

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the entire apartment located at apt 3s, 3rd story, 1st apartment from east at south

    Oct 29, 2010 · Apt 3S

    Closed — Violation dismissed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color north wall in the kitchen located at apt 3s, 3rd story, 1st apartment from east at south

    Oct 29, 2010 · Apt 3S

    Closed — Violation dismissed
  • B

    Remove all encumbrances consisting of garbage cans, refrigerator and other items, at public hall, 1st story

    Jan 9, 2007

    Closed — Violation closed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 2n, 2nd story, 1st apartment from west at north

    Aug 10, 2006 · Apt 2N

    Closed — Violation closed
  • B

    Abate the nuisance consisting of vermin mice in the entire apartment located at apt 3s, 3rd story, 1st apartment from east at south

    Jun 15, 2004 · Apt 3S

    Closed — Violation dismissed
  • B

    Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 3s, 3rd story, 1st apartment from east at south

    Jun 15, 2004 · Apt 3S

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective in the 2nd room from north located at apt 3s, 3rd story, 1st apartment from east at south

    Dec 10, 2003 · Apt 3S

    Closed — Violation dismissed

DOB building violations · 7

  • High pressure boiler boiler required

    Violation issued for failure to file 2013 annual high pressure boiler inspection

    Mar 3, 2015

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued for failure to file 2012 annual high pressure boiler inspection

    May 15, 2014

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Nov 9, 2010

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Feb 22, 2001

    Vw*-violation - work w/o permit dismissed
  • Construction other optional

    C-construction other optional

    Oct 31, 2000

    Vw*-violation - work w/o permit dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 1, 1994

    Dob violation - dismissed

ECB violations · 8

  • Class - 3

    18b.48b.50a.50b.21b 50a combustion on leak at top causing of boiler 50b exposed boiler rm ceiling must be two hr fire rated

    Apr 21, 2009

    Resolve
  • Non-hazardous

    Exit passage or corridor required width decreased by obstruction note:@ rear 2nd fl party fire escape (plant & box material old paintings onfire escape partially block passage on fire escape.remedy:remove obstr

    Sep 14, 2006 · Penalty $2,500

    Resolve
  • Non-hazardous

    6a)/50a columbia v.t. blr 25hp, nb 137462, oil, 1987 6a safety valve leaking. replace safety valve. 50 exposed electronic instrument controls. replace protective covers on instruments.

    Dec 28, 2005

    Resolve
  • Non-hazardous

    50(a)/ 50(c)/ 50(b)/ 50(d)/ columbia v.t. blr 25 hp nb 137462, oilfired, 1997 50(a) evidence of overheating at the top externar casing of the boiler perform repairs 50(b) no secondary screw - type blow down

    May 3, 2004 · Penalty $350

    Active
  • Non-hazardous

    Work without permit. work noted:installed steel structural members on roof of class 3 bldg without a permit, noted:steel i beams are installed in pocked of southmd, and party wall of #1662 north& 1660parapetwal

    Oct 31, 2000

    Resolve
  • Non-hazardous

    While at above address i went on the roof and observed excessive pitchto the gutter and gutter was installed low, causing excessive rain water ot go over gutter causing water damage to apartment 2n at 1660 1st

    Jan 30, 1998

    Resolve
  • Non-hazardous

    17(b)

    Jan 29, 1992

    Resolve
  • Non-hazardous

    Reseal breeching to chimney properly.

    Oct 17, 1990

    Resolve

Complaints

  • Unsanitary condition

    Mold

    Feb 17, 2021 · Apt 4S

    Close
  • Water leak

    Slow leak

    Feb 17, 2021 · Apt 4S

    Close
  • Heating

    Heat related

    Jan 24, 2013 · Apt 3S

    Close
  • Heating

    Heat related

    Oct 31, 2012 · Apt 3S

    Close
  • Heating

    Heat related

    Nov 2, 2011 · Apt 3S

    Close
  • Heating

    Heat related

    Mar 26, 2011 · Apt 3S

    Close
  • Heating

    Heat related

    Feb 24, 2011 · Apt BLDG

    Close
  • General

    Floor

    Feb 3, 2011 · Apt 3S

    Close
  • Paint/plaster

    Ceiling

    Feb 3, 2011 · Apt 3S

    Close
  • Paint/plaster

    Wall

    Feb 3, 2011 · Apt 3S

    Close
Show 40 more ↓
  • Paint/plaster

    Wall

    Feb 3, 2011 · Apt 3S

    Close
  • General

    Floor

    Feb 3, 2011 · Apt 3S

    Close
  • Heating

    Heat related

    Oct 24, 2010 · Apt 3S

    Close
  • Heating

    Heat related

    Nov 23, 2009 · Apt 3S

    Close
  • Plumbing

    Water-leaks

    Feb 21, 2007 · Apt 2N

    Close
  • General

    Floor

    Feb 21, 2007 · Apt 2N

    Close
  • General

    Stairs

    Feb 21, 2007 · Apt 2N

    Close
  • Plumbing

    Basin/sink

    Feb 21, 2007 · Apt 2N

    Close
  • Plumbing

    Water-leaks

    Feb 21, 2007 · Apt 2N

    Close
  • Nonconst

    Vermin

    Feb 21, 2007 · Apt 2N

    Close
  • Nonconst

    Vermin

    Feb 21, 2007 · Apt 2N

    Close
  • Nonconst

    Vermin

    Feb 21, 2007 · Apt 2N

    Close
  • General

    Doors

    Feb 21, 2007 · Apt 2N

    Close
  • Nonconst

    Vermin

    Feb 21, 2007 · Apt 2N

    Close
  • Nonconst

    Rubbish

    Jan 16, 2007 · Apt 2N

    Close
  • Nonconst

    Rubbish

    Jan 16, 2007 · Apt 2N

    Close
  • Nonconst

    Vermin

    Jan 16, 2007 · Apt 2N

    Close
  • General

    Stairs

    Jan 16, 2007 · Apt 2N

    Close
  • Nonconst

    Vermin

    Jan 16, 2007 · Apt 2N

    Close
  • Plumbing

    Basin/sink

    Jan 16, 2007 · Apt 2N

    Close
  • General

    Ceramic-tile

    Jan 16, 2007 · Apt 2N

    Close
  • Plumbing

    Water-leaks

    Jan 16, 2007 · Apt 2N

    Close
  • General

    Stairs

    Jan 3, 2007 · Apt 2N

    Close
  • General

    Locks

    Jan 3, 2007 · Apt 2N

    Close
  • Nonconst

    Vermin

    Jan 3, 2007 · Apt 2N

    Close
  • Nonconst

    Vermin

    Jan 3, 2007 · Apt 2N

    Close
  • General

    Doors

    Dec 4, 2006 · Apt 2N

    Close
  • Nonconst

    Vermin

    Nov 15, 2006 · Apt 2N

    Close
  • Nonconst

    Vermin

    Nov 15, 2006 · Apt 2N

    Close
  • Nonconst

    Rubbish

    Nov 15, 2006 · Apt 2N

    Close
  • Nonconst

    Vermin

    Nov 15, 2006 · Apt 2N

    Close
  • Plumbing

    Basin/sink

    Nov 15, 2006 · Apt 2N

    Close
  • General

    Doors

    Nov 15, 2006 · Apt 2N

    Close
  • General

    Doors

    Nov 15, 2006 · Apt 2N

    Close
  • General

    Doors

    Nov 15, 2006 · Apt 2N

    Close
  • Plumbing

    Water-leaks

    Sep 13, 2006 · Apt 2N

    Close
  • Nonconst

    Vermin

    Sep 13, 2006 · Apt 2N

    Close
  • General

    Doors

    Sep 13, 2006 · Apt 2N

    Close
  • Nonconst

    Vermin

    Sep 13, 2006 · Apt 2N

    Close
  • Plumbing

    Water-leaks

    Aug 14, 2006 · Apt 2N

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Mixed residential and retail building (S5)
Year built
1910
Floors
4
Residential units
6
Building area
6,355 ft²
Lot area
1,850 ft²
Zoning
R10A
Community board
108
Council district
5
Block / lot
1566 / 48
Assessed value
$1,792,350
Landmark / historic district
No

HPD registration #136571, last renewed Sep 5, 2025.

Questions about 1660 1 Avenue

Who owns 1660 1 Avenue?

The owner of record in NYC Department of City Planning PLUTO data is 1660 1st LLC.

Does 1660 1 Avenue have violations?

Yes. NYC HPD has recorded 41 housing violations at this property.

Is 1660 1 Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1660 1 Avenue built?

City records list 1910 as the year it was built.

How many apartments are in 1660 1 Avenue?

It has 6 residential units and 7 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.