roofy

1802 2nd Avenue

Manhattan, NY 10128BBL 1-01556-0052Map

Owner of record: Ohi Asset (NY) 2nd Avenue, LLC

1802 2nd Avenue is an elevator apartment building built in 2019 in Manhattan, 10128. It has 215 residential units across 24 floors. The owner of record is Ohi Asset (NY) 2nd Avenue, LLC. HPD has recorded 190 housing violations here, most recently on November 6, 2017.

HPD violations
190
DOB violations
33
ECB violations
19
HPD complaints
502

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Nov 6, 2017

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 190

  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 6, 2017

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 24, 2016

    Closed — Violation closed
  • B

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts minimum required (light fixtures present)

    May 6, 2015

    Closed — Violation closed
  • B

    Abate the nuisance consisting of roaches in the entire apartment located at apt 5a, 2nd story, 2nd apartment from east at south

    Dec 9, 2014 · Apt 5A

    Closed — Violation closed
  • B

    Abate the nuisance consisting of mice in the entire apartment located at apt 5a, 5th story, 2nd apartment from east at south

    Dec 9, 2014 · Apt 5A

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 5a, 5th story, 2nd apartment from east at south

    Dec 9, 2014 · Apt 5A

    Closed — Violation closed
  • C

    Repair the broken or defective connection at waste line at sink in the kitchen located at apt 5a, 5th story, 2nd apartment from east at south

    Dec 9, 2014 · Apt 5A

    Closed — Violation closed
  • B

    Properly repair the broken or defective electrical outlet at north wall in the kitchen located at apt 5a, 5th story, 2nd apartment from east at south

    Dec 9, 2014 · Apt 5A

    Closed — Violation closed
  • B

    Replace with new the broken or defective wood sink cabinet in the kitchen located at apt 5a, 5th story, 2nd apartment from east at south

    Dec 9, 2014 · Apt 5A

    Closed — Violation closed
  • B

    Replace with new the broken or defective wood door in the bathroom located at apt 5a, 5th story, 2nd apartment from east at south

    Dec 9, 2014 · Apt 5A

    Closed — Violation closed
Show 40 more ↓
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the bathroom located at apt 5a, 5th story, 2nd apartment from east at south

    Dec 9, 2014 · Apt 5A

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic wall tiles in the bathroom located at apt 5a, 5th story, 2nd apartment from east at south

    Dec 9, 2014 · Apt 5A

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 5a, 5th story, 2nd apartment from east at south

    Dec 9, 2014 · Apt 5A

    Closed — Violation closed
  • B

    Replace the broken or defective bathtub in the bathroom located at apt 5a, 5th story, 2nd apartment from east at south

    Dec 9, 2014 · Apt 5A

    Closed — Violation closed
  • B

    Repair the leaky and/or defective water supply pipe at bathtub in the bathroom located at apt 5a, 5th story, 2nd apartment from east at south

    Dec 9, 2014 · Apt 5A

    Closed — Violation closed
  • A

    Replace with new the broken or defective peep hole in the entrance located at apt 5a, 5th story, 2nd apartment from east at south

    Dec 9, 2014 · Apt 5A

    Closed — Violation closed
  • B

    Arrange and make self-closing the doors .. in the entrance located at apt 5a, 5th story, 2nd apartment from east at south

    Dec 9, 2014 · Apt 5A

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling and all walls in the entire apartment located at apt 5a, 5th story, 2nd apartment from east at south

    Dec 9, 2014 · Apt 5A

    Closed — Violation closed
  • B

    Properly repair the broken or defective intercom system in the 1st room from east located at apt 5a, 5th story, 2nd apartment from east at south

    Dec 9, 2014 · Apt 5A

    Closed — Violation closed
  • C

    Properly repair with similar material the broken or defective fire retarding ceiling at public hall, 5th story

    Oct 27, 2014

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from east located at apt 5c, 5th story, 1st apartment from east at south

    Oct 27, 2014 · Apt 5C

    Closed — Violation closed
  • B

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts . required

    Oct 27, 2014

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective vinyl floor tiles at public hall, 5th story

    Oct 27, 2014

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor at public hall, 5th story

    Oct 27, 2014

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department ceiling and all walls at public hall, 5th story

    Oct 27, 2014

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective vinyl floor tiles at public hall, 2nd story

    Oct 27, 2014

    Closed — Violation closed
  • C

    Repair the roof so that it will not leak above ceiling at public hall, 5th story

    Oct 27, 2014

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from east located at apt 5c, 5th story, 1st apartment from east at south

    Oct 27, 2014 · Apt 5C

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor in the 1st room from east located at apt 5c, 5th story, 1st apartment from east at south

    Oct 27, 2014 · Apt 5C

    Closed — Violation closed
  • B

    Replace with new the broken or defective wooden door in the 1st room from east located at apt 5c, 5th story, 1st apartment from east at south

    Oct 27, 2014 · Apt 5C

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 1st room from east located at apt 5c, 5th story, 1st apartment from east at south

    Oct 27, 2014 · Apt 5C

    Closed — Violation closed
  • C

    Replace with new the broken or defective air valve at radiator in the 1st room from east located at apt 5c, 5th story, 1st apartment from east at south

    Oct 27, 2014 · Apt 5C

    Closed — Violation closed
  • C

    Repair the broken or defective connection shut off valve at radiator in the 1st room from east located at apt 5c, 5th story, 1st apartment from east at south

    Oct 27, 2014 · Apt 5C

    Closed — Violation closed
  • C

    Replace with new the broken or defective fire proof apt. door and regulation lock in the entrance located at apt 5c, 5th story, 1st apartment from east at south

    Oct 27, 2014 · Apt 5C

    Closed — Violation closed
  • C

    Repair the leaky and/or defective faucets sink in the kitchen located at apt 5c, 5th story, 1st apartment from east at south

    Oct 27, 2014 · Apt 5C

    Closed — Violation closed
  • A

    Cleanse to the satisfaction of this department the stairs and the landings all stiories at public hall

    Oct 27, 2014

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic wall tiles on all walls in the bathroom located at apt 5c, 5th story, 1st apartment from east at south

    Oct 27, 2014 · Apt 5C

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 5c, 5th story, 1st apartment from east at south

    Oct 27, 2014 · Apt 5C

    Closed — Violation closed
  • B

    Replace with new the broken or defective wooden door in the bathroom located at apt 5c, 5th story, 1st apartment from east at south

    Oct 27, 2014 · Apt 5C

    Closed — Violation closed
  • C

    Repair the roof so that it will not leak above ceiling in the bathroom located at apt 5c, 5th story, 1st apartment from east at south

    Oct 27, 2014 · Apt 5C

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the bathroom located at apt 5c, 5th story, 1st apartment from east at south

    Oct 27, 2014 · Apt 5C

    Closed — Violation closed
  • B

    Replace with new the broken or defective door gasket on refrigerator in the kitchen located at apt 5c, 5th story, 1st apartment from east at south

    Oct 27, 2014 · Apt 5C

    Closed — Violation closed
  • B

    Abate the nuisance consisting of roaches in the entire apartment located at apt 5c, 5th story, 1st apartment from east at south

    Oct 27, 2014 · Apt 5C

    Closed — Violation closed
  • B

    Abate the nuisance consisting of mice in the entire apartment located at apt 5c, 5th story, 1st apartment from east at south

    Oct 27, 2014 · Apt 5C

    Closed — Violation closed
  • B

    Trace and repair the source and abate the nuisance consisting of mold ... ceiling approx. 16 square feet in the bathroom located at apt 5c, 5th story, 1st apartment from east at south

    Oct 27, 2014 · Apt 5C

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 5c, 5th story, 1st apartment from east at south

    Oct 27, 2014 · Apt 5C

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor in the 1st room from east located at apt 5c, 5th story, 1st apartment from east at south

    Oct 27, 2014 · Apt 5C

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 5c, 5th story, 1st apartment from east at south

    Oct 27, 2014 · Apt 5C

    Closed — Violation closed
  • C

    Repair the broken or defective connection waste line at washbasin in the bathroom located at apt 5c, 5th story, 1st apartment from east at south

    Oct 27, 2014 · Apt 5C

    Closed — Violation closed
  • C

    Properly repair with similar material the broken or defective wood floor at public hall, 2nd story

    Oct 27, 2014

    Closed — Violation closed

DOB building violations · 33

  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2022

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 2, 2022

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2022

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 1, 2022

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2020

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2020

    Dob violation - dismissed
Show 23 more ↓
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 5, 2020

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Jan 17, 2020

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Jul 31, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Jun 27, 2008

    Vw*-violation - work w/o permit dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1993

    Dob violation - dismissed

ECB violations · 19

  • Class - 1

    Work does not conform to approved construction documents and or approved amendments.note:at time of inspection of a 24 story building of bulkhead leel equipment in place and in use i observed suspended scaffold

    Feb 12, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Bc3314.4.3.3/installation inspection report.note:at time of inspectioni observed supported upon request of installation report to the formanenrique montemuino;none was provided the results of the inspection sha

    Feb 12, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to protect lifelines from sharp edges and abrasion causing a hazardous condition to worker on suspended scaffold.note;at time of inspection i observed work in progress on or nb 24 story. i observed life

    Feb 12, 2020 · Penalty $5,000

    Resolve
  • Class - 1

    Bc3314.10.9/improper installation tie backs partial work order for suspended scaffold and all facade work issued pursuant to 28-207.2.note:at time of inspection of a nb 24 story building work in progress.i obse

    Feb 12, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Bc3301.7/3301.1.3/documents to be kept on site.note:at time of inspection of a 24 story building at bulkhead level construction work in progress i observed suspended scaffold modular platforms and motor upon re

    Feb 12, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Bc3309.14/protection of windows.note:at time of inspection on an active jobiste of a 24 story building observed construction operation in progress and the window at expo#3 had no protection at all failure to pr

    Feb 12, 2020 · Penalty $2,500

    Resolve
  • Class - 2

    Posting of lawful signs.note:at time of inspection i observed sidewalkshed in place with the following violating condition posting on unlawful signs information pictorial representation business or advertising

    Feb 12, 2020

    Resolve
  • Class - 1

    Work does not conform to approved construction documents andn or approved amendments.note:at time of inspection of a 24 story building work in progress at 16th floor set back observed supported scaffold in plac

    Feb 12, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Bc3314.4.3.2/partial stop work ordre for suspended scaffold issued pursuant to 28-207.2 and posted of premises.failure to provide installation inspection report to suspended scaffold.note:at time of inspection

    Feb 12, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Documents to be kept on site.note:at time of inspection of 24 story nbat expo#3 16 flr set back i observed suspended scaffold in place and redely available to use up on request to the forman enrique montemuino

    Feb 12, 2020 · Penalty $2,500

    Resolve
Show 9 more ↓
  • Class - 1

    3309.10 protection of roofs (neighboring buildings/ properties)@the time of inspection @a 24 sty nb, i observed on the roof lvl & 22nd floorsetback inadequate and no roof protection on expo 1 & 4 roof.

    Oct 30, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to provide sidewalk shed where required. @@time of inspection @a 24 sty nb, observed on the street lvl no sidewalk shed passed 20 feet on either side of the over head roof protection pipe scaffold/shed

    Oct 30, 2019

    Resolve
  • Class - 2

    Respondent failed to make the proper notification for mobile crane after may 1,18 to the dept.at time of inspection,it was discovered that no mobile crane(cn 27418)was on site.notification was made of the crane

    Feb 6, 2019 · Penalty $5,030

    Resolve
  • Class - 2

    Failure to maintain building in a code compliant manner. defects notedat time of inspection there are minor cracks in hallways & water damage evident to walls & ceilings in hallway & stairwells exposed wiring i

    Aug 1, 2012 · Penalty $250

    Resolve
  • Class - 2

    Failure to provide unobstructed exit passageway. defects noted:at time of inspection flower pots are stored on fire escape platform at front of building also noted:bicycle stored in hallway at first flr obstruc

    Aug 1, 2012 · Penalty $400

    Resolve
  • Class - 2

    Expired shed permit noted:shed permit # 120013779 was expired 9/26/09 remedy:renew permit

    Sep 28, 2009 · Penalty $800

    Resolve
  • Class - 2

    Failure to maintain sidewalk shed lamps shall be enclosed in vandal proof fixtures noted:no vandal proof fixtures remedy:comply w/code

    Sep 16, 2009 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to maintain bldg walls or appurtenances. defects noted: step cracks throughout front facade. parapet above 5th flr cracked. remedy: repair defects.

    May 15, 2009

    Resolve
  • Non-hazardous

    Work w/o a permit noted: having removed side walk hate access doors atfront sidewalk & sealed (backfilled) & masonry blocked existing openi ng. stop all work remedy: obtain all permits and approvals obtain stop

    Jun 27, 2008 · Penalty $500

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Feb 1, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 20, 2015 · Apt 1A

    Close
  • General

    Cooking gas

    Nov 20, 2015 · Apt 1A

    Close
  • General

    Cooking gas

    Nov 13, 2015 · Apt 1A

    Close
  • Heat/hot water

    Entire building

    Nov 13, 2015 · Apt 1A

    Close
  • General

    Cooking gas

    Nov 13, 2015 · Apt 1A

    Close
  • Heat/hot water

    Entire building

    Nov 13, 2015 · Apt 1A

    Close
  • Heat/hot water

    Entire building

    Nov 4, 2015 · Apt 1A

    Close
  • Heat/hot water

    Apartment only

    Sep 14, 2015 · Apt 1E

    Close
  • Heat/hot water

    Apartment only

    Apr 9, 2015 · Apt 2G

    Close
Show 40 more ↓
  • Plumbing

    Water supply

    Apr 2, 2015 · Apt 2G

    Close
  • Heat/hot water

    Entire building

    Mar 30, 2015 · Apt 3D

    Close
  • Heat/hot water

    Entire building

    Mar 28, 2015 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 8, 2015 · Apt 5A

    Close
  • Heating

    Heat related

    Dec 29, 2014 · Apt NA

    Close
  • Heating

    Heat related

    Dec 29, 2014 · Apt NA

    Close
  • Heating

    Heat related

    Dec 29, 2014 · Apt 3D

    Close
  • Heat/hot water

    Entire building

    Dec 9, 2014 · Apt 5C

    Close
  • Unsanitary condition

    Pests

    Dec 3, 2014 · Apt 5A

    Close
  • Flooring/stairs

    Floor

    Dec 3, 2014 · Apt 5A

    Close
  • Safety

    Window guard broken/missing

    Dec 3, 2014 · Apt 5A

    Close
  • Plumbing

    Basin/sink

    Dec 3, 2014 · Apt 5A

    Close
  • Unsanitary condition

    Mold

    Dec 3, 2014 · Apt 5A

    Close
  • Water leak

    Heavy flow

    Dec 3, 2014 · Apt 5A

    Close
  • Plumbing

    Bathtub/shower

    Dec 3, 2014 · Apt 5A

    Close
  • Door/window

    Door

    Dec 3, 2014 · Apt 5A

    Close
  • Paint/plaster

    Wall

    Dec 3, 2014 · Apt 5A

    Close
  • General

    Bell/buzzer/intercom

    Dec 3, 2014 · Apt 5A

    Close
  • Unsanitary condition

    Pests

    Dec 3, 2014 · Apt 5A

    Close
  • Heat/hot water

    Entire building

    Dec 2, 2014 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 1, 2014 · Apt 2A

    Close
  • Unsanitary condition

    Pests

    Nov 14, 2014 · Apt 3D

    Close
  • Plumbing

    Toilet

    Nov 9, 2014 · Apt 2H

    Close
  • Heat/hot water

    Apartment only

    Nov 9, 2014 · Apt 4A

    Close
  • Appliance

    Refrigerator

    Nov 3, 2014 · Apt 5C

    Close
  • Appliance

    Electric/gas range

    Nov 3, 2014 · Apt 5C

    Close
  • Appliance

    Refrigerator

    Oct 27, 2014 · Apt 5C

    Close
  • Heat/hot water

    Entire building

    Oct 24, 2014 · Apt 4A

    Close
  • Paint/plaster

    Wall

    Oct 20, 2014 · Apt 5C

    Close
  • Flooring/stairs

    Floor

    Oct 20, 2014 · Apt 5C

    Close
  • Appliance

    Refrigerator

    Oct 20, 2014 · Apt 5C

    Close
  • Plumbing

    Basin/sink

    Oct 20, 2014 · Apt 5C

    Close
  • Paint/plaster

    Ceiling

    Oct 20, 2014 · Apt 5C

    Close
  • Plumbing

    Bathtub/shower

    Oct 20, 2014 · Apt 5C

    Close
  • Unsanitary condition

    Pests

    Oct 20, 2014 · Apt 5C

    Close
  • Unsanitary condition

    Pests

    Oct 20, 2014 · Apt 5C

    Close
  • Flooring/stairs

    Floor

    Oct 20, 2014 · Apt 5C

    Close
  • Heat/hot water

    Entire building

    Jul 18, 2014 · Apt 3C

    Close
  • Heat/hot water

    Entire building

    Jul 17, 2014 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Jul 17, 2014 · Apt BLDG

    Close

Sales history

DatePriceTypeUnits
Feb 27, 2026Non-market transferRentals - elevator apartments215

Building details

Building type
Elevator apartment building (D3)
Year built
2019
Floors
24
Residential units
215
Building area
162,682 ft²
Lot area
11,250 ft²
Zoning
C2-8
Community board
108
Council district
5
Block / lot
1556 / 52
Assessed value
$23,612,850
Landmark / historic district
No

HPD registration #133947, last renewed Sep 1, 2015.

Questions about 1802 2nd Avenue

Who owns 1802 2nd Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Ohi Asset (NY) 2nd Avenue, LLC.

Does 1802 2nd Avenue have violations?

Yes. NYC HPD has recorded 190 housing violations at this property.

Is 1802 2nd Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1802 2nd Avenue built?

City records list 2019 as the year it was built.

How many apartments are in 1802 2nd Avenue?

It has 215 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.