roofy

244 East 90 Street

Manhattan, NY 10128BBL 1-01535-0030Map

Owner of record: 244 246 E 90 Owners Corp

244 East 90 Street is a walk-up apartment building built in 1910 in Manhattan, 10128. It has 20 residential units across 5 floors. The owner of record is 244 246 E 90 Owners Corp. HPD has recorded 35 housing violations here, most recently on April 29, 2026. 25 of the 35 most recent violations are still open.

HPD violations
35
DOB violations
0
ECB violations
1
HPD complaints
34

What to know

Concern
6 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Apr 29, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 35

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 29, 2026

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1d, 1st story, 2nd apartment from south at west

    Sep 15, 2025 · Apt 1D

    Open — Notice of issuance sent to tenant
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 4, 2025

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 1, 2024

    Closed — Violation dismissed
  • B

    Provide adequate supply of hot water for the fixtures at sink in the kitchen located at apt a, 3rd story, 1st apartment from north at east

    May 8, 2023 · Apt A

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system lock door. at boiler room

    May 8, 2023

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt a, 3rd story, 1st apartment from north at east

    May 8, 2023 · Apt A

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3a, 3rd story, 1st apartment from north at east

    May 8, 2023 · Apt 3A

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 15, 2023

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 15, 2022

    Closed — Violation dismissed
Show 25 more ↓
  • B

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following minimum of 100 watts as required (light fixture present)

    Oct 20, 2021

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 1, 2021

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Aug 19, 2019

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Aug 19, 2019

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Aug 19, 2019

    Open — Nov sent out
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Aug 19, 2019

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 9, 2018

    Closed — Violation dismissed
  • B

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following minimum of 100 watts as required(light fixture(s) present). at front areaway

    Oct 16, 2017

    Open — Nov sent out
  • B

    Abate the nuisance consisting of mice in the entire apartment located at apt 2d, 2nd story, 2nd apartment from south at west

    Aug 5, 2013 · Apt 2D

    Closed — Violation closed
  • A

    Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing frame at lobby, 1st story

    Aug 5, 2013

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at lobby, 1st story

    Aug 5, 2013

    Open — Nov sent out
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes fire escape at north 5 sty air conditioner.

    Sep 24, 1999

    Open — Nov sent out
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes fire escape at north 3 sty air conditioner.

    Sep 24, 1999

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system 1 sty public hall wall & boiler room door.

    Sep 24, 1999

    Open — Nov certified late
  • C

    Provide ready access to buildings heating system 1 sty to cellar door locked.

    Sep 24, 1999

    Open — Nov certified late
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.

    Sep 14, 1999

    Open — Nov certified late
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing.

    Sep 14, 1999

    Open — Nov certified late
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper.

    Sep 14, 1999

    Open — Nov certified late
  • A

    Properly repair with similar material the broken or defective ceiling plaster fire retardant material public hall 5 sty.

    Sep 14, 1999

    Open — Nov certified late
  • A

    D26-21.03 adm code paint or post a sign indicating floors all stys public halls on wall at stairs.

    Jan 12, 1995

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department walls and ceiling and wood work rear west apt 1c throughout. , section '' ''

    Jan 12, 1995 · Apt 1C

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures kitchen & bathroom 1 sty front west apt 1a. located at apt 1a

    Dec 3, 1990 · Apt 1A

    Open — Nov certified late
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system 1 sty public hall and on boiler room door.

    Dec 3, 1990

    Open — Not complied with
  • A

    D26-10.01 adm code properly repair the broken or defective inoperable door public hall incinerator closets all stys.

    Aug 15, 1989

    Open — Nov sent out
  • A

    D26-10.01 adm code refit front door entrance apt 1b 1st sty. , section '' ''

    Aug 15, 1989 · Apt 1B

    Open — Nov sent out

DOB building violations · 0

No DOB violations on record

ECB violations · 1

  • Class - 2

    Failure to safeguard all persons & property affected by construction operations. noted: @ time of insp, @ apt#1d, brick & masonry debris has fallen from work performed @ apt#3d. fallen material has damaged bri

    Aug 4, 2016 · Penalty $5,000

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Feb 3, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Oct 6, 2025 · Apt 1A

    Close
  • Unsanitary condition

    Pests

    Sep 9, 2025 · Apt 1D

    Close
  • Electric

    No lighting

    May 22, 2023 · Apt 5B

    Close
  • Electric

    Power outage

    May 21, 2023 · Apt 2A

    Close
  • Electric

    Power outage

    May 21, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    May 5, 2023 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Apr 7, 2023 · Apt BLDG

    Close
  • Electric

    Power outage

    Jan 31, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 23, 2023 · Apt BLDG

    Close
Show 24 more ↓
  • Heat/hot water

    Entire building

    Jan 23, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 22, 2022 · Apt A

    Close
  • Heat/hot water

    Apartment only

    Oct 9, 2022 · Apt 5B

    Close
  • Plumbing

    Water supply

    Oct 9, 2022 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Oct 9, 2022 · Apt 1C

    Close
  • Heat/hot water

    Apartment only

    Oct 9, 2022 · Apt 5B

    Close
  • Heat/hot water

    Entire building

    Oct 8, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Oct 17, 2021 · Apt 5B

    Close
  • Plumbing

    Water supply

    Oct 17, 2021 · Apt 5B

    Close
  • Plumbing

    Water supply

    Jul 24, 2020 · Apt 5B

    Close
  • Heat/hot water

    Apartment only

    Nov 22, 2019 · Apt 1D

    Close
  • Heat/hot water

    Apartment only

    Nov 7, 2019 · Apt 5B

    Close
  • Plumbing

    Water supply

    Aug 30, 2019 · Apt 5B

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Aug 11, 2019 · Apt BLDG

    Close
  • General

    Signage missing

    Aug 11, 2019 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jul 2, 2019 · Apt 5B

    Close
  • Heat/hot water

    Entire building

    Oct 18, 2018 · Apt 1D

    Close
  • Unsanitary condition

    Pests

    Jan 11, 2016 · Apt 3C

    Close
  • Heat/hot water

    Apartment only

    Oct 21, 2014 · Apt 1D

    Close
  • Nonconst

    Vermin

    Jul 28, 2013 · Apt 2D

    Close
  • Nonconst

    Vermin

    Jul 28, 2013 · Apt 2D

    Close
  • Nonconst

    Vermin

    Jul 28, 2013 · Apt 2D

    Close
  • Plumbing

    Water-leaks

    Aug 10, 2006 · Apt 5B

    Close
  • Plumbing

    Water-leaks

    Aug 10, 2006 · Apt 5B

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C6)
Year built
1910
Floors
5
Residential units
20
Building area
10,340 ft²
Lot area
2,517 ft²
Zoning
R8B
Community board
108
Council district
5
Block / lot
1535 / 30
Assessed value
$1,640,250
Landmark / historic district
No

HPD registration #101812, last renewed Aug 29, 2025.

Questions about 244 East 90 Street

Who owns 244 East 90 Street?

The owner of record in NYC Department of City Planning PLUTO data is 244 246 E 90 Owners Corp.

Does 244 East 90 Street have violations?

Yes. NYC HPD has recorded 35 housing violations at this property.

Is 244 East 90 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 244 East 90 Street built?

City records list 1910 as the year it was built.

How many apartments are in 244 East 90 Street?

It has 20 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.