241 East 86 Street
Manhattan, NY 10028BBL 1-01532-0016Map
Owner of record: Sgrc 241
241 East 86 Street is an elevator apartment building built in 1989 in Manhattan, 10028. It has 106 residential units across 18 floors. The owner of record is Sgrc 241. HPD has recorded 4 housing violations here, most recently on October 25, 2019. 1 of the 4 most recent violations are still open.
- HPD violations
- 4
- DOB violations
- 26
- ECB violations
- 19
- HPD complaints
- 39
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 4
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 25, 2019
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Oct 19, 2015
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Oct 19, 2015
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system 1 sty public hall and cellar door to boiler room.
Sep 3, 1997
Open — Nov certified late
DOB building violations · 26
- Elevator elevatorrequired
E-elevator elevatorrequired
Dec 24, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 24, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 10, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 10, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 27, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 6, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 12, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 12, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 23, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 23, 2010
Dob violation - resolved
Show 16 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Jan 9, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 9, 2009
Dob violation - resolved - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 30, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 30, 2007
Dob violation - resolved - Facade facade required
L1198-local law 11/98 - facade facade required
Jun 25, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 12, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 12, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 17, 2004
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 17, 2004
Dob violation - resolved - Elevator elevatorrequired
1p35681
Mar 22, 2001
Dob violation - resolved - Elevator elevatorrequired
1p35680
Mar 22, 2001
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Construction other optional
C-construction other optional
Apr 18, 1990
Vp-violation unserved ecb-active
ECB violations · 19
- Class - 1
Sec. 3314.3.2 no design drawing for c hook suspended scaffold. note: at the time of my inspection of active facade restoration job site,i observed c-hook suspedned scaffold on exp#1 upon request for design draw
Mar 2, 2021 · Penalty $2,500
Resolve - Non-hazardous
64m12/59o02. 64 replace mussing comp chain 59 clean down cwt rails.
May 31, 2002
Resolve - Non-hazardous
59o02. clean down cwt rails.
May 31, 2002
Resolve - Non-hazardous
75u05.
Apr 26, 2000
Resolve - Non-hazardous
75u05,36l11,35m07. 36-l-11 repair door and install newlock. 35-m-07 stall smoke alarm.
Apr 26, 2000
Resolve - Non-hazardous
Obstructed sprinkler system. plumbing work without permit. remedy: obtain a permit if feasible or restore o prior legal condition.
Apr 16, 1998 · Penalty $800
Resolve - Non-hazardous
Observed fire stand pipe plumbing work without permit. remedy: obtain a permit if feasible or restore toprior legal condition.
Apr 16, 1998
Resolve - Hazardous
73z57o26i27i60k 73-cease use untill repairs or replacement are complied with water damage. must be tested before putting back to service remedy: make all repairs call 212-312-8738.
Mar 31, 1998
Resolve - Non-hazardous
54m,73#, 54m-elevator co.name 73#-perform 2 year test, properly tag device and file elv3 form.
Mar 9, 1993 · Penalty $100
Resolve - Non-hazardous
10l,35o,54m,55x,73#, 10l-indicator bulbs 54m-elevator co.name 73#-per-form 2 year test,properly tag device and file elv3 form.
Mar 9, 1993 · Penalty $100
Resolve
Show 9 more ↓
- Hazardous
No site safety log per regulations effective 11/1/86 remedy provide log on site as required
Jul 3, 1989
Resolve - Hazardous
Failure to provide protection at sides of excavation west side of excavation ramp. remedy provide ramp protection
Dec 13, 1988 · Penalty $750
Resolve - Hazardous
Failure to provide protection at side of excavation on north ,south , west sides of excavation needs sheeting shoreing bracing and underspinning. remedy stop all work except for sheeting shoreing and braceing
Dec 13, 1988 · Penalty $750
Resolve - Hazardous
Failure to carry out demolition operations in a safe and proper manner removing wall adjoining 235 e 86 st and opening 2 sections appox 8ft x 8 ft of said wall th the elements. remedy stop all demolition work
Nov 15, 1988 · Penalty $1,500
Resolve - Hazardous
Failure to carry out demolition operations in a safe and proper manner no fence provided to separate demolition debris and rear yard of adjoining propertye 87 st remedy provide required protection
Nov 15, 1988 · Penalty $1,500
Resolve - Hazardous
Failure to carry out demolitionoperations in a safe and proper manner no fence provided to separate demolition debris and rear yard of adjoining property e 87 st remedy provide required protection
Nov 15, 1988 · Penalty $1,500
Resolve - Hazardous
Failure to carry out demolition operations in a safe and proper manner no fence provided to separate demolition debris and rear yard of adjoining property e 87 st
Nov 15, 1988 · Penalty $1,500
Resolve - Hazardous
Failure to carry out demolition operations in a safe and proper manner no fence provided to separate demolition debris and rear yard of adjoining property e 87 st remedy provide required protection
Nov 15, 1988 · Penalty $1,500
Resolve - Hazardous
Failure to carry out demoliton operations in a safe and proper manner no fence provided to separate demolitons debris and rear yard of adjoining property remedy provide required protection
Nov 15, 1988 · Penalty $1,500
Resolve
Complaints
- Unsanitary condition
Garbage/recycling storage
Mar 2, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Mar 2, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Oct 18, 2025 · Apt 3E
Close - Electric
Outlet/switch
Feb 8, 2025 · Apt 16E
Close - Heat/hot water
Entire building
Oct 15, 2024 · Apt BLDG
Close - Plumbing
Water supply
Oct 14, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 14, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 14, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 13, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 13, 2024 · Apt BLDG
Close
Show 29 more ↓
- Heat/hot water
Entire building
Oct 13, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 13, 2024 · Apt BLDG
Close - Plumbing
Water supply
Oct 12, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 12, 2024 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jun 14, 2023 · Apt STORER
Close - Door/window
Door frame
Jul 21, 2022 · Apt 4A
Close - Door/window
Door frame
Jul 21, 2022 · Apt 4A
Close - Unsanitary condition
Mold
Jul 14, 2020 · Apt 12G
Close - Heat/hot water
Entire building
Dec 11, 2019 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 25, 2016 · Apt 11B
Close - Heat/hot water
Entire building
Sep 26, 2016 · Apt 2A
Close - Heat/hot water
Entire building
Sep 16, 2016 · Apt 11B
Close - Heat/hot water
Entire building
Aug 23, 2016 · Apt 6B
Close - Heat/hot water
Entire building
Aug 12, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 12, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 12, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 12, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 12, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 11, 2016 · Apt 11B
Close - Heat/hot water
Entire building
Aug 4, 2016 · Apt 12C
Close - Heat/hot water
Entire building
Jan 5, 2016 · Apt 2F
Close - Heat/hot water
Entire building
Jan 5, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 20, 2015 · Apt 17F
Close - Heat/hot water
Entire building
Oct 19, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 17, 2015 · Apt 10E
Close - Heat/hot water
Entire building
Feb 21, 2015 · Apt 4B
Close - Heat/hot water
Entire building
Feb 21, 2015 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 11, 2015 · Apt 11B
Close - Heat/hot water
Entire building
Nov 3, 2014 · Apt 16B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 1989
- Floors
- 18
- Residential units
- 106
- Building area
- 104,440 ft²
- Lot area
- 9,440 ft²
- Zoning
- C2-8A
- Community board
- 108
- Council district
- 5
- Block / lot
- 1532 / 16
- Assessed value
- $16,134,300
- Landmark / historic district
- No
HPD registration #140751, last renewed Aug 18, 2025.
Questions about 241 East 86 Street
Who owns 241 East 86 Street?
The owner of record in NYC Department of City Planning PLUTO data is Sgrc 241.
Does 241 East 86 Street have violations?
Yes. NYC HPD has recorded 4 housing violations at this property.
Is 241 East 86 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 241 East 86 Street built?
City records list 1989 as the year it was built.
How many apartments are in 241 East 86 Street?
It has 106 residential units and 111 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.