40 East 80 Street
Manhattan, NY 10075BBL 1-01491-0048Map
Owner of record: 40 East 80 Apt Corp
40 East 80 Street is an elevator apartment building built in 1967 in Manhattan, 10075. It has 41 residential units across 26 floors. The owner of record is 40 East 80 Apt Corp. HPD has recorded 61 housing violations here, most recently on April 29, 2026. 44 of the 50 most recent violations are still open.
- HPD violations
- 61
- DOB violations
- 55
- ECB violations
- 20
- HPD complaints
- 44
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 61
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 4, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 15, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective sheetrock at west wall and south wall located at apt 25b upper level, 25th story, 1st apartment from south at west
Sep 6, 2015 · Apt 25B
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall and south wall located at apt 25b upper level, 25th story, 1st apartment from south at west
Sep 6, 2015 · Apt 25B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective sheetrock ceiling in the bathroom located at apt 25b upper level, 25th story, 1st apartment from south at west
Sep 6, 2015 · Apt 25B
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling in the bathroom located at apt 25b upper level, 25th story, 1st apartment from south at west
Sep 6, 2015 · Apt 25B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling ,north,and east wall in the 1st room from north located at apt 25bphb, 25th story, 1st apartment from south at west
Jun 2, 2015 · Apt 25BPHB
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceilingnorth ,west and south wall in the bathroom located at apt 25bphb, 25th story, 1st apartment from south at west
Jun 2, 2015 · Apt 25BPHB
Open — Nov sent out - BHazardous
Replace the broken or defective and or missing sink in the kitchen located at apt 25bphb, 25th story, 1st apartment from south at west
Jun 2, 2015 · Apt 25BPHB
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling at upper level in the bathroom located at apt 25b, 25th story, 1st apartment from north at east
May 30, 2014 · Apt 25B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling at lower level in the 1st room from north at west located at apt 25b, 25th story, 1st apartment from north at east
May 30, 2014 · Apt 25B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling ,north wall and east wall at upper level in the 1st room from north at west located at apt 25b, 25th story, 1st apartment from north at east
May 30, 2014 · Apt 25B
Open — Nov sent out - BHazardous
Replace with new the missing sink in the kitchen located at apt 25b, 25th story, 1st apartment from north at east
May 30, 2014 · Apt 25B
Open — Nov sent out - CImmediately hazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wire at north wall in the kitchen located at apt 25b, 25th story, 1st apartment from north at east
May 30, 2014 · Apt 25B
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of uncapped gas pipe line at south wall in the kitchen located at apt 25b, 25th story, 1st apartment from north at east
May 30, 2014 · Apt 25B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls, in the 1st room from east at center located at apt phb, 26th story, 1st apartment from north at east
Oct 7, 2013 · Apt PHB
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of north & south walls, in the kitchen located at apt phb, 26th story, 1st apartment from north at east
Oct 7, 2013 · Apt PHB
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures exposed electric wires, north & south walls, in the kitchen located at apt phb, 26th story, 1st apartment from north at east
Oct 7, 2013 · Apt PHB
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling, in the 1st room from east at center located at apt phb, 26th story, 1st apartment from north at east
Oct 7, 2013 · Apt PHB
Open — Nov sent out - BHazardous
Replace the broken or defective kitchen sink (missing) in the kitchen located at apt 25b, 25th story, 1st apartment from north at east
Jul 29, 2013 · Apt 25B
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures .. in the kitchen located at apt 25b, 25th story, 1st apartment from north at east
Jul 29, 2013 · Apt 25B
Open — Nov sent out - BHazardous
Provide adequate supply of cold water for the fixtures .. in the kitchen located at apt 25b, 25th story, 1st apartment from north at east
Jul 29, 2013 · Apt 25B
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electric wire north wall in the kitchen located at apt 25b, 25th story, 1st apartment from north at east
Jul 29, 2013 · Apt 25B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color west wall in the 1st room from east located at apt 25b, 25th story, 1st apartment from north at east
Jul 29, 2013 · Apt 25B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 25b, 25th story, 1st apartment from north at east
Jul 29, 2013 · Apt 25B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east wall in the kitchen located at apt 25b, 25th story, 1st apartment from north at east
Jul 29, 2013 · Apt 25B
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... east wall approx. 12 sq. ft. in the kitchen located at apt 25b, 25th story, 1st apartment from north at east
Jul 29, 2013 · Apt 25B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the 1st room from east located at apt 25b, 25th story, 1st apartment from north at east
Jul 29, 2013 · Apt 25B
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... ceiling and east wall approx.20 sq. ft. in the 1st room from east located at apt 25b, 25th story, 1st apartment from north at east
Jul 29, 2013 · Apt 25B
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the entire apartment located at apt 25b, 25th story, 1st apartment from north at east
Jun 30, 2013 · Apt 25B
Open — Certification postponment denied - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... ceiling 10 sqft in the entire apartment located at apt 25b, 25th story, 1st apartment from north at east
Jun 30, 2013 · Apt 25B
Open — Certification postponment denied - BHazardous
Replace with new the missing wall hung cabinets and base cabinets in the kitchen located at apt 25b, 25th story, 1st apartment from north at east
Jun 30, 2013 · Apt 25B
Open — Certification postponment denied - BHazardous
Replace with new the missing sink in the kitchen located at apt 25b, 25th story, 1st apartment from north at east
Jun 30, 2013 · Apt 25B
Open — Certification postponment denied - BHazardous
Replace with new the missing stove in the kitchen located at apt 25b, 25th story, 1st apartment from north at east
Jun 30, 2013 · Apt 25B
Open — Certification postponment denied - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of south wall and east wall in the kitchen located at apt 25b, 25th story, 1st apartment from north at east
Jun 30, 2013 · Apt 25B
Open — Certification postponment denied - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the entire apartment located at apt 25b, 25th story, 1st apartment from north at east
Jun 30, 2013 · Apt 25B
Open — Certification postponment denied - ANon-hazardous
Provide a mirror in self-service elevator arranged so as to enable a person entering, to view inside of elevator number missing
Aug 3, 2012
Open — Certification postponment granted - ANon-hazardous
Provide a peep hole in entrance door of the dwelling unit so located so as to permit a person inside the dwelling to view any person outside entrance door missing in the entrance located at apt 26b, 26th story, 1st apartment from north at east
Aug 3, 2012 · Apt 26B
Open — Certification postponment granted - ANon-hazardous
Replace with new the missing electric wall outlet covers in the 2nd room from north at east located at apt 26b, 25th story, 1st apartment from north at east
Jul 1, 2012 · Apt 26B
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and walls in the kitchen located at apt 26b, 25th story, 1st apartment from north at east
Jul 1, 2012 · Apt 26B
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of exposed wires at north wall and souht wall in the kitchen located at apt 26b, 25th story, 1st apartment from north at east
Jul 1, 2012 · Apt 26B
Open — Certification postponment denied - BHazardous
M/d law abate the nuisance consisting of moisture penetration at west window soffit in the 2nd room from north at east located at apt 26b, 25th story, 1st apartment from north at east
Jul 1, 2012 · Apt 26B
Open — Certification postponment denied - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color soffit above window at west in the 2nd room from north at east located at apt 26b, 25th story, 1st apartment from north at east
Jul 1, 2012 · Apt 26B
Open — Certification postponment denied - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the 1st room from north at east located at apt 26b, 25th story, 1st apartment from north at east
Jul 1, 2012 · Apt 26B
Open — Certification postponment denied - BHazardous
M/d law abate the nuisance consisting of moisture penetration over ceiling and east wall in the 1st room from north at east located at apt 26b, 25th story, 1st apartment from north at east
Jul 1, 2012 · Apt 26B
Open — Certification postponment denied - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the 1st room from north at east located at apt 26b, 25th story, 1st apartment from north at east
Jul 1, 2012 · Apt 26B
Open — Certification postponment denied - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 9b, 9th story, 1st apartment from north at east
Aug 19, 2009 · Apt 9B
Open — Nov sent out
DOB building violations · 55
- Failure to correct swarmp conditions (facade) facade required
Failure to correct swarmp conditions
Aug 1, 2024
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2023)
Jun 23, 2024
Dob violation - active - Hazardous condition (facade) facade required
Cycle 9c unsafe report filed
Feb 21, 2024
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2023
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2022
Jun 22, 2023
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2021
Aug 21, 2022
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 30, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 30, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 23, 2019
Dob violation - active
Show 40 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Sep 23, 2019
Dob violation - active - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 23, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 23, 2016
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 18, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 19, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 19, 2014
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to priv res elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 6, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 6, 2013
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2010 inspection/test
Dec 13, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 9, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 9, 2011
Dob violation - resolved - Private residential elevator elevatoroptional
Violation issued to elevators in private res dwellings (1 or 2 family dwellings)
Nov 12, 2010
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 20, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 20, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 17, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 17, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 11, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 11, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 22, 2007
Dob violation - resolved - Facade facade required
L1198-local law 11/98 - facade facade required
Jun 25, 2007
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 2, 2007
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
May 26, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 26, 2005
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Nov 19, 2004
Dob violation - active - Elevator elevatorrequired
1p29447
Nov 25, 2002
Dob violation - resolved - Elevator elevatorrequired
1p29446
Jul 10, 2002
Dob violation - resolved - Construction other optional
C-construction other optional
Sep 25, 2001
Vw*-violation - work w/o permit dismissed - Elevator elevatorrequired
1p29446
Apr 19, 2001
Dob violation - resolved - Elevator elevatorrequired
1p29447
Apr 19, 2001
Dob violation - resolved - Facade facade optional
Ll10/80-local law 10/80 - facade facade optional
Mar 27, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
May 31, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - active
ECB violations · 20
- Class - 2
Failure to safeguard the public and property. at time of inspection, observed contractor doing demolition work at the roof and not providing proper protection that led to construction material landing at the ne
Jul 16, 2025 · Penalty $10,000
Active - Class - 2
Failure to file annual certification that cooling tower 1000002344 has been inspected, tested, and disinfected and that a maintenance plan has been developed and implemented by november 1,2016.rem:file annual c
Jun 20, 2017 · Penalty $2,000
Active - Class - 2
Failure to comply w/the comm's order contained in nov #35136670j issued on 8/29/15 & to file a c of c pursuant to 28-201.1,28-204.4 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.
Dec 4, 2015 · Penalty $4,000
Resolve - Class - 2
Failure to comply w/the comm's order contained in nov #35136670j issued on 8/29/15 & to file a c of c pursuant to 28-201.1,28-204.4 & 1rcny 102-01. failure to maintain bldg in code compliant manner. in apt 25b
Oct 16, 2015 · Penalty $800
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. note interior walls@ upper rooms of duplex apt has been stripped of finishes down to wire(path)& at various location exposed electrical(raughting)(holes around
Aug 29, 2015 · Penalty $1,000
Resolve - Class - 2
Failure to provide safety measures or sidewalk shed where required according to the cycle #6 techn rpt. (tr-6) filed as unsafe of the local law 11/98 rpt. rem: provide safety measures or sidewalk shed where rqd
Apr 19, 2010 · Penalty $2,400
Resolve - Class - 1
No record of daily inspection of suspended scaffold performed by authorized person at site. noted: on inspection no records for scaffold on site, only daily log book shown containing daily activity no safety re
Feb 10, 2009 · Penalty $2,400
Active - Non-hazardous
84x10. 84x10.07 84x device 1p28184 isn't operative repair & return to service for proper dob elevator inspection 84x provide 2 way communication as per code
Mar 10, 2008 · Penalty $350
Resolve - Hazardous
Work w/o a permit.non permitted conditions observed.sidewalk shed erected under permit#104685351 has razor wire running length of shed on 80th st & part of madison ave wire drops to a level of less than 7ft fro
Jan 4, 2008 · Penalty $2,500
Resolve - Non-hazardous
Failure to maintain bldg exterior. defects noted, at 25 pl apt 25b water soaked walls due to water intrusion at exit & north & south facadesat north facade corner above terrace north east corner spalling
Feb 21, 2007 · Penalty $800
Active
Show 10 more ↓
- Hazardous
Work without a permit.work noted:dismantled and removed masonry parapet wall approx 10'w x 4'ht also removed an outside wythe of brick work in penthouse stair bulkhead approx 90 s.f. noted location:1)masonry pa
Apr 13, 2005 · Penalty $500
Resolve - Hazardous
Failure to maintain exterior of building. repair made to the east wallon the 25th and 26 floors made in very poor workmanship manner. wesp holes in a cavity wall not allowed to remain open.very poor re-pointing
Nov 8, 2004 · Penalty $10,000
Resolve - Non-hazardous
Failure to maintain exterior building wall.note:vertical and horizontal cracks at eastwalls of apartment 25b/26b causing mortar from brick joints to fall down onto penthouse open terraces therby creating a haz
May 24, 2004 · Penalty $800
Resolve - Hazardous
Failure to file an amended round fourth report acceptable to this department pursuant to rule r.c.n.y.32-03b(5),indicating correction of hazardous conditions described in initial ll10/80 report remedy file an a
May 3, 2002
Resolve - Hazardous
Failure to file an amended round five report acceptable to this department pursuant to rule r.c.n.y. 32-03b(5), indicating correction of hazardous conditions described in initial ll11/98 report. remedy: file an
Mar 4, 2002
Resolve - Non-hazardous
Work without a permit noted wooden structure build on the roof for insulation approx 15 feet high 10 feet wide 10 feet long on southwest side of building remedy obtain permit from dob or restore to prior condit
Sep 25, 2001 · Penalty $2,500
Resolve - Hazardous
Failure to file an amended round five report acceptable to this department pursuant to rule r.c.n.y. 32-03b(5), indicating correction of hazardous conditions described in initial ll10/80 report. remedy: file an
Jan 12, 2001
Resolve - Hazardous
Failure to file an amended round five report acceptable to this department pursuant to rule r.c.n.y.32-03b(5), indicating correction of hazardous conditions described in initial ll10/80 report. remedy: file an
Nov 24, 2000
Resolve - Non-hazardous
Work without a permit. noted wooden structure build on roof for insulation. approx 15 feet high, 10 feet wide, and 10 feet long on southwest side of building. obtain work permit from department of buildings or
Nov 15, 1999 · Penalty $2,500
Resolve - Non-hazardous
37b 37-properly secure fuse panel & "u" "d" "f" "l" relays
Jul 1, 1997 · Penalty $1,000
Active
Complaints
- Unsanitary condition
Pests
Aug 23, 2015 · Apt 25B
Close - Unsanitary condition
Mold
May 29, 2015 · Apt 25BPHB
Close - Water leak
Slow leak
May 1, 2014 · Apt 25B
Close - Water leak
Slow leak
May 1, 2014 · Apt 25B
Close - Appliance
Electric/gas range
May 1, 2014 · Apt 25B
Close - General
Cabinet
May 1, 2014 · Apt 25B
Close - Plumbing
Basin/sink
May 1, 2014 · Apt 25B
Close - Water leak
Damp spot
May 1, 2014 · Apt 25B
Close - Water leak
Slow leak
May 1, 2014 · Apt 25B
Close - Electric
Wiring
Sep 19, 2013 · Apt PHB
Close
Show 34 more ↓
- Paint/plaster
Wall
Sep 19, 2013 · Apt PHB
Close - Plumbing
Water-leaks
Sep 19, 2013 · Apt PHB
Close - Plumbing
Water-leaks
Sep 19, 2013 · Apt PHB
Close - Paint/plaster
Ceiling
Sep 19, 2013 · Apt PHB
Close - Plumbing
Water-leaks
Sep 19, 2013 · Apt PHB
Close - General
Mold
Sep 19, 2013 · Apt PHB
Close - General
Mold
Sep 6, 2013 · Apt 8K
Close - Plumbing
Water-leaks
Jul 23, 2013 · Apt 25B
Close - Plumbing
Water-leaks
Jul 23, 2013 · Apt 25B
Close - Plumbing
Water-leaks
Jul 23, 2013 · Apt 25B
Close - General
Mold
Jul 23, 2013 · Apt 25B
Close - Plumbing
Water-leaks
Jun 25, 2013 · Apt 25B
Close - General
Mold
Jun 25, 2013 · Apt 25B
Close - Paint/plaster
Ceiling
Jul 31, 2012 · Apt 26B
Close - General
Doors
Jul 31, 2012 · Apt 26B
Close - Construction
Elevator
Jul 31, 2012 · Apt 26B
Close - Plumbing
Water-leaks
Jun 25, 2012 · Apt 26B
Close - Plumbing
Basin/sink
Jun 25, 2012 · Apt 26B
Close - General
Cabinet
Jun 25, 2012 · Apt 26B
Close - Plumbing
Water-leaks
Aug 19, 2009 · Apt 9B
Close - Paint/plaster
Ceiling
Aug 19, 2009 · Apt 9B
Close - Plumbing
Sewer
Aug 19, 2009 · Apt 9B
Close - Paint/plaster
Ceiling
Aug 18, 2009 · Apt 9B
Close - Paint/plaster
Ceiling
Aug 18, 2009 · Apt 9B
Close - Paint/plaster
Ceiling
Aug 18, 2009 · Apt 9B
Close - Appliance
Electric/gas range
Aug 5, 2009 · Apt 25B
Close - Appliance
Refrigerator
Aug 5, 2009 · Apt 25B
Close - Plumbing
Basin/sink
Aug 5, 2009 · Apt 25B
Close - General
Mold
Jan 8, 2008 · Apt 25B
Close - Electric
Electric-supply
Apr 3, 2005 · Apt 26B
Close - Heating
Heat related
Apr 3, 2005 · Apt 26B
Close - Electric
Electric-supply
Apr 3, 2005 · Apt 26B
Close - Heating
Heat related
Apr 3, 2005 · Apt 26B
Close - General
Mold
Jul 27, 2003 · Apt 26B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D4)
- Year built
- 1967
- Floors
- 26
- Residential units
- 41
- Building area
- 111,231 ft²
- Lot area
- 9,720 ft²
- Zoning
- C5-1
- Community board
- 108
- Council district
- 4
- Block / lot
- 1491 / 48
- Assessed value
- $18,036,450
- Landmark / historic district
- No
HPD registration #139128, last renewed Aug 1, 2025.
Questions about 40 East 80 Street
Who owns 40 East 80 Street?
The owner of record in NYC Department of City Planning PLUTO data is 40 East 80 Apt Corp.
Does 40 East 80 Street have violations?
Yes. NYC HPD has recorded 61 housing violations at this property.
Is 40 East 80 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 40 East 80 Street built?
City records list 1967 as the year it was built.
How many apartments are in 40 East 80 Street?
It has 41 residential units and 43 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.