439 East 77 Street
Manhattan, NY 10075BBL 1-01472-0017Map
Owner of record: 439 East 77 Prop Co LLC
439 East 77 Street is an elevator apartment building built in 2025 in Manhattan, 10075. It has 16 residential units across 7 floors. The owner of record is 439 East 77 Prop Co LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 6
- ECB violations
- 20
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 6
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed
ECB violations · 20
- Class - 1
Obs active construction operations @ a proposed 7 story building with no designated construction super present on site. multiple trades were actively working, including electrical work, while workers were unabl
Jun 29, 2026 · Penalty $10,000
Resolve - Class - 1
Observed active construction at a proposed 7-story building with inadequate housekeeping throughout the first floor and multiple upper floors. building materials, debris, and equipment were scattered on walking
Jun 29, 2026 · Penalty $2,500
Resolve - Class - 2
Obs active construction operations. upon request, required chapter 33 documents were not maintained on site, including approved construction documents, construction superintendent daily logs, pre-shift meeting
Jun 29, 2026 · Penalty $1,250
Resolve - Class - 2
Observed a sws installed along exp 1. upon request for required documents, no loads and imposed letter for the installed sws on exp 1 were produced by site personnel. stop all use of equipment on top of sws de
Apr 6, 2026 · Penalty $1,250
Resolve - Class - 2
Site was observed failing to provide required roof protection for adjacent property @ exp 4. no roof protection was installed to safeguard the adjoining roof structure from potential falling debris and material
Apr 6, 2026 · Penalty $2,500
Resolve - Class - 1
At time of inspection, a knuckle boom crane owned & operated by longhorn corp was on lifting material to top of building. the crane has its outriggers set up on sidewalk w/o drawings indicating the area is not
Feb 19, 2026 · Penalty $10,000
Resolve - Class - 1
At time of inspection, a knuckle boom crane operating onsite with oak gc,llc as gc was lifting material to top of building. the crane has its outriggers set up on sidewalk w/o drawings indicating the area has n
Feb 19, 2026 · Penalty $10,000
Resolve - Class - 1
At time of inspection, a knuckle boom crane operating onsite by all air hvac, llc was lifting material to top of building. the crane has itsoutriggers set up on sidewalk w/o drawings indicating the area has no
Feb 19, 2026 · Penalty $10,000
Resolve - Class - 1
At time of inspection, a knuckle boom crane was on site hoisting material. the crew involved with attaching and detaching hvac units were not rigging certified as required. all members actively in the rigging c
Feb 19, 2026 · Penalty $2,500
Resolve - Class - 1
At time of inspection, a knuckle boom crane used by all air hvac, llc was on site hoisting material. the crew involved with attaching and detaching hvac units were not rigging certified as required. all members
Feb 19, 2026 · Penalty $2,500
Resolve
Show 10 more ↓
- Class - 2
Observed inactive site, gc #626231 scaffold at exposure #1 covered with white tarp not per dob-approved eq-005.00 plans requiring full netting. (bc 3301.2).stop all scaffold/facade work at exposure 1, until com
Jan 3, 2026 · Penalty $625
Resolve - Class - 2
Observed inactive site, gc #626231 plastic yodocks at storage zone exposure 1, not maintained per manufacturer specs, improperly positioned and unsecured, creating public safety hazard. bc 3307.6.stop all use o
Jan 3, 2026 · Penalty $2,500
Resolve - Class - 1
Observed construction work in progress for the purpose of 7 stories new building, currently on 3rd floor framing level. no sidewalk shed was provided for the operation, creating an immediate hazard as no adequa
Sep 8, 2025 · Penalty $10,000
Resolve - Class - 1
Upon my request to review documents of site safety orientation, the respondent wasn't able to provide any documents which in contrary with code "3301.7 documents to be maintained on site" creating an immediate
Sep 8, 2025 · Penalty $5,000
Resolve - Class - 2
Bc 3304.3.3 failure to obtain dep drilling and excavation permit as site is within 200 feet horizontal distance of a water tunnel shaft (see 15 rcny 57-01) and the excavation exceeds 15 feet (see 15 rcny 57-04(
Mar 21, 2025 · Penalty $2,500
Resolve - Class - 1
At time of inspection of a proposed 7 stories new building at excavation level, i observed underpinning operation of adjacent building at exposure # 4 and excavation operation in progress , upon review the dep
Mar 20, 2025 · Penalty $2,500
Resolve - Class - 1
At time of inspection of a proposed 7 stories new building at excavation level, i observed underpinning operation of adjacent building at exposure # 4 in progress , upon request for view of approved soe drawin
Mar 20, 2025 · Penalty $2,500
Resolve - Class - 2
Bc 3307.2.1 at time of inspection of a proposed 7 stories new building at excavation level, i observed occupancy of roadway with barriers on the street for construction activities and construction fence instal
Mar 20, 2025 · Penalty $2,500
Resolve - Class - 1
Failure to submit the required parking structure initial observation report for an existing parking structure or periodic inspection of a parking structure(pips)report documenting the conditions of psid#m000261
Oct 1, 2024 · Penalty $625
Resolve - Class - 2
Failure to maintain ext bldg facade and appurtenances,note:exp 2 west elev at both front and rear of bldg the stucco surface material has broken and falling off w/ addt'l material is in danger of falling off,al
Jan 30, 2020 · Penalty $1,250
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D3)
- Year built
- 2025
- Floors
- 7
- Residential units
- 16
- Building area
- 32,569 ft²
- Lot area
- 7,237 ft²
- Zoning
- R8B
- Community board
- 108
- Council district
- 5
- Block / lot
- 1472 / 17
- Assessed value
- $1,388,250
- Landmark / historic district
- No
Questions about 439 East 77 Street
Who owns 439 East 77 Street?
The owner of record in NYC Department of City Planning PLUTO data is 439 East 77 Prop Co LLC.
Does 439 East 77 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 439 East 77 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 439 East 77 Street built?
City records list 2025 as the year it was built.
How many apartments are in 439 East 77 Street?
It has 16 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.