roofy

401 East 60 Street

Manhattan, NY 10065BBL 1-01455-7501Map

Owner of record: Bridge Tower Place Condominium

401 East 60 Street is a condominium built in 1999 in Manhattan, 10065. It has 218 residential units across 38 floors. The owner of record is Bridge Tower Place Condominium. HPD has recorded 31 housing violations here, most recently on July 9, 2024.

HPD violations
31
DOB violations
154
ECB violations
15
HPD complaints
114

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Jul 9, 2024

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 31

  • A

    Trace and repair the source and abate the visible mold condition... at the south wall less than 10 sq ft in the 1st room from east located at apt 8n, 8th story, 3rd apartment from east at south

    Jul 9, 2024 · Apt 8N

    Closed — Violation closed
  • B

    Refit sliding windows in the 1st room from east located at apt 8n, 8th story, 3rd apartment from east at south

    Jul 9, 2024 · Apt 8N

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 1st room from east located at apt 8n, 8th story, 3rd apartment from east at south

    Jul 9, 2024 · Apt 8N

    Closed — Violation dismissed
  • C

    Properly repair with similar material the broken or defective hardwood floor in the 1st room from east located at apt 8n, 8th story, 3rd apartment from east at south

    Jul 9, 2024 · Apt 8N

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 8n, 8th story, 3rd apartment from east at south

    Jul 9, 2024 · Apt 8N

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... at the south wall less than 10 sq ft in the 1st room from east located at apt 8n, 8th story, 3rd apartment from east at south original violation 17106511 issued 09-jul-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Jul 9, 2024 · Apt 8N

    Closed — Violation closed
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Jun 7, 2020

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Jun 7, 2020

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Jun 7, 2020

    Closed — Violation closed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at or near mailbox at public hall, 1st story

    Jun 7, 2020

    Closed — Violation closed
Show 21 more ↓
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Jun 7, 2020

    Closed — Violation closed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at or near mailbox at public hall, 1st story

    Jun 7, 2020

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Sep 25, 2018

    Closed — Violation closed
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Sep 25, 2018

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Sep 25, 2018

    Closed — Violation closed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system improper sign at public hall, 1st story

    Sep 25, 2018

    Closed — Violation closed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box improper sign at public hall, 1st story

    Sep 25, 2018

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Sep 25, 2018

    Closed — Violation closed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Sep 25, 2018

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color north wall in the 1st room from north located at apt 6l, 6th story, 1st apartment from east at south

    Sep 23, 2008 · Apt 6L

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective fire retarded material at public hall, 6th story

    Aug 16, 2008

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective marble counter top at sink in the kitchen located at apt 6l, 6th story, 1st apartment from east at south

    Aug 16, 2008 · Apt 6L

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 1st room from east located at apt 6l, 6th story, 1st apartment from east at south

    Aug 16, 2008 · Apt 6L

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 2nd room from east located at apt 6l, 6th story, 1st apartment from east at south

    Aug 16, 2008 · Apt 6L

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective marble top at washbasin in the bathroom located at apt 6l, 6th story, 1st apartment from east at south

    Aug 16, 2008 · Apt 6L

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall in the kitchen located at apt 6l, 6th story, 1st apartment from east at south

    Aug 16, 2008 · Apt 6L

    Closed — Violation closed
  • C

    Replace with new the broken or defective painted sprinkler head in the entire apartment located at apt 6l, 6th story, 1st apartment from east at south

    Aug 16, 2008 · Apt 6L

    Closed — Violation closed
  • B

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 6l, 6th story, 1st apartment from east at south

    Aug 16, 2008 · Apt 6L

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective fire-retardent ceiling at exit sign at public hall, 9th story, 1st section from north at northeast

    Dec 26, 2007

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective wood baseboard east wall at public hall, 9th story, section at east

    Oct 22, 2007

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling at public hall, 9th story, section at east

    Oct 22, 2007

    Closed — Violation closed

DOB building violations · 154

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 5, 2025

    Dob violation - dismissed
  • Construction other optional

    The dob hereby orders you to stop all work under job # m00561165 at 23rd floor of premises - except to make site safe - due to applicant of record alberto roman, pe, surrendered all filing privileges

    Sep 8, 2022

    Dob violation - dismissed
  • Construction other optional

    The dob hereby orders you to stop all work under job # m00561165 at 23rd floor of premises - except to make site safe - due to applicant of record alberto roman, pe, surrendered all filing privileges

    Sep 8, 2022

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 27, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 27, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 23, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 23, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 23, 2018

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 23, 2018

    Dob violation - resolved
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 8a technical report by 02/21/2017

    May 31, 2018

    Dob violation - dismissed
Show 40 more ↓
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Feb 21, 2017

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2015 inspection/test

    Dec 1, 2016

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 16, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 16, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 16, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 16, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 10, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 10, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 10, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 10, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 10, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 10, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 10, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 10, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 10, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 9, 2014

    Dob violation - resolved
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2012 inspection/test

    Mar 31, 2014

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2012 inspection/test

    Mar 31, 2014

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2012 inspection/test

    Mar 31, 2014

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2012 inspection/test

    Mar 31, 2014

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2012 inspection/test

    Mar 31, 2014

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2012 inspection/test

    Mar 31, 2014

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2012 inspection/test

    Mar 31, 2014

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2012 inspection/test

    Mar 31, 2014

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 19, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 19, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 19, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 19, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    This pvt replaces pvt 480372

    Jul 18, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 18, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 18, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 18, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    This pvt replaces pvt 480525

    Jul 18, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    This pvt replaces pvt 480374

    Jul 18, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    This pvt replaces pvt 480373

    Jul 18, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 18, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 14, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 14, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 14, 2012

    Dob violation - resolved

ECB violations · 15

  • Class - 1

    Failure to submit the required parking structure initial observation report for an existing parking structure or a periodic inspection of a parking structure(pips) report documenting the conditions of psid#m000

    Oct 1, 2024

    Resolve
  • Class - 2

    97r5: illegal removal of device 1h5035 which was never finalized by dob but was permitted.

    Sep 3, 2021 · Penalty $620

    Resolve
  • Class - 2

    Violation of discretionary zoning conditions on privatley owned publicspace at time of inspection noted:as per pops#m080100-space record#81 00 modified in 4/17/2000-required amenities(10)bicycle parking require

    May 29, 2019 · Penalty $5,030

    Resolve
  • Class - 2

    Failure to file annual cert. that cooling tower 1000002329 has been inspected, tested, & disinfected, & that a maintenance plan has been developed & implemented, by november 1,2016. remedy: file annual certific

    Jun 22, 2017 · Penalty $1,000

    Resolve
  • Non-hazardous

    84m07 84-m deck barricades missing top and bottom right and left hand sides.

    Jan 5, 2005 · Penalty $180

    Resolve
  • Non-hazardous

    84m07 84-m deck barricades missing top and bottom left and right hand sides.

    Jan 5, 2005 · Penalty $180

    Resolve
  • Non-hazardous

    84m07 84-m deck barricades missing top and bottom left and right hand sides.

    Jan 5, 2005 · Penalty $180

    Resolve
  • Hazardous

    80i11/84m07 80-i 4 damaged steps 84-m deck barricades missing top and bottom right and left hand sides.

    Jan 5, 2005 · Penalty $500

    Resolve
  • Non-hazardous

    47f10/15m7/16d7 47-eliminate excessive noise & vibration during slow speed up.15-install cert.frame in cab with cert.or location sign 16-close up excessive space between doors.

    Dec 3, 2003 · Penalty $350

    Resolve
  • Non-hazardous

    15m07/16d07 15-install cert.frame cert.or location sign 16-close below1st & 2nd fl door saddles

    Dec 3, 2003 · Penalty $350

    Resolve
Show 5 more ↓
  • Non-hazardous

    15b07/84f10/02b10/07l10 15-use cert or location sign in frame 84-eliminate jump at start 02-repair intercom 17-repair gate saftey edges.

    Dec 3, 2003 · Penalty $350

    Resolve
  • Non-hazardous

    15b07/84f10/02b10/07l10 15-use cert or location sign in frame 84-eliminate jump at start 02-repair intercom 17 repair saftey edges on gates

    Dec 3, 2003 · Penalty $350

    Resolve
  • Non-hazardous

    40u16-10x11. 40-u-16 tag governor 5 year test tag 10-x-11 repair communition in elevator.

    Apr 9, 2002

    Resolve
  • Non-hazardous

    40u16-10x11. (40-u-16) tag governor 5 year test tag (10-x-11) repair communications in elevator.

    Apr 9, 2002

    Resolve
  • Non-hazardous

    40u16. tag governor 5 year test tag.

    Apr 9, 2002

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Dec 11, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 15, 2024 · Apt 9J

    Close
  • Unsanitary condition

    Mold

    Jul 9, 2024 · Apt 8N

    Close
  • Unsanitary condition

    Mold

    Jun 24, 2024 · Apt 8N

    Close
  • Unsanitary condition

    Mold

    Jun 19, 2024 · Apt 8N

    Close
  • Flooring/stairs

    Floor

    Jun 14, 2024 · Apt 8N

    Close
  • Door/window

    Window frame

    Jun 14, 2024 · Apt 8N

    Close
  • Flooring/stairs

    Floor

    May 10, 2024 · Apt 8N

    Close
  • Door/window

    Window frame

    May 10, 2024 · Apt 8N

    Close
  • Plumbing

    Toilet

    Dec 7, 2022 · Apt 10M

    Close
Show 40 more ↓
  • Flooring/stairs

    Floor

    Dec 7, 2022 · Apt 10M

    Close
  • Plumbing

    Toilet

    Dec 7, 2022 · Apt 10M

    Close
  • General

    Ventilation system

    Jan 4, 2022 · Apt 31B

    Close
  • General

    Ventilation system

    Nov 29, 2021 · Apt 31B

    Close
  • General

    Ventilation system

    Oct 24, 2021 · Apt 31B

    Close
  • Appliance

    Electric/gas range

    Sep 17, 2021 · Apt 4C

    Close
  • Appliance

    Electric/gas range

    Apr 14, 2020 · Apt 6K

    Close
  • General

    Ventilation system

    Jun 11, 2019 · Apt 7K

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Sep 21, 2018 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Mar 19, 2016 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Mar 19, 2016 · Apt 7K

    Close
  • Plumbing

    Water supply

    Mar 19, 2016 · Apt 10O

    Close
  • Plumbing

    Water supply

    Mar 6, 2016 · Apt 35C

    Close
  • Plumbing

    Water supply

    Mar 5, 2016 · Apt 10O

    Close
  • Plumbing

    Water supply

    Mar 5, 2016 · Apt 25D

    Close
  • Plumbing

    Water supply

    Mar 5, 2016 · Apt 30C

    Close
  • General

    Floor

    Oct 16, 2008 · Apt 9E

    Close
  • General

    Mold

    Oct 16, 2008 · Apt 9E

    Close
  • Paint/plaster

    Ceiling

    Oct 16, 2008 · Apt 9E

    Close
  • General

    Ceramic-tile

    Sep 19, 2008 · Apt 6L

    Close
  • General

    Mold

    Sep 19, 2008 · Apt 6L

    Close
  • Nonconst

    Rubbish

    Sep 19, 2008 · Apt 6L

    Close
  • General

    Stairs

    Sep 19, 2008 · Apt 6L

    Close
  • Paint/plaster

    Wall

    Sep 19, 2008 · Apt 6L

    Close
  • Electric

    Lighting

    Sep 19, 2008 · Apt 6L

    Close
  • General

    Floor

    Sep 19, 2008 · Apt 6L

    Close
  • Nonconst

    Rubbish

    Sep 19, 2008 · Apt 6L

    Close
  • General

    Ceramic-tile

    Sep 19, 2008 · Apt 6L

    Close
  • Electric

    Lighting

    Sep 19, 2008 · Apt 6L

    Close
  • Appliance

    Electric/gas range

    Sep 19, 2008 · Apt 6L

    Close
  • General

    Floor

    Sep 19, 2008 · Apt 6L

    Close
  • General

    Windows

    Sep 19, 2008 · Apt 6L

    Close
  • Electric

    Lighting

    Sep 19, 2008 · Apt 6L

    Close
  • Plumbing

    Basin/sink

    Sep 19, 2008 · Apt 6L

    Close
  • General

    Cabinet

    Sep 19, 2008 · Apt 6L

    Close
  • Appliance

    Electric/gas range

    Sep 19, 2008 · Apt 6L

    Close
  • General

    Floor

    Sep 19, 2008 · Apt 6L

    Close
  • Paint/plaster

    Wall

    Sep 19, 2008 · Apt 6L

    Close
  • Plumbing

    Water-leaks

    Sep 19, 2008 · Apt 6L

    Close
  • Plumbing

    Bathtub/shower

    Sep 12, 2008 · Apt 6L

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Condominium (RM)
Year built
1999
Floors
38
Residential units
218
Building area
378,474 ft²
Lot area
40,200 ft²
Zoning
C6-2
Community board
108
Council district
5
Block / lot
1455 / 7501
Assessed value
$62,171,187
Landmark / historic district
No

HPD registration #141415, last renewed Jul 24, 2026.

Questions about 401 East 60 Street

Who owns 401 East 60 Street?

The owner of record in NYC Department of City Planning PLUTO data is Bridge Tower Place Condominium.

Does 401 East 60 Street have violations?

Yes. NYC HPD has recorded 31 housing violations at this property.

Is 401 East 60 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 401 East 60 Street built?

City records list 1999 as the year it was built.

How many apartments are in 401 East 60 Street?

It has 218 residential units and 271 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.