253 East 62nd Street
Manhattan, NY 10065BBL 1-01417-0021Map
Owner of record: 253 East 62nd Street,
253 East 62nd Street is an elevator apartment building built in 2016 in Manhattan, 10065. It has 6 residential units across 10 floors. The owner of record is 253 East 62nd Street,. HPD has recorded 38 housing violations here, most recently on April 29, 2026. 38 of the 38 most recent violations are still open.
- HPD violations
- 38
- DOB violations
- 32
- ECB violations
- 52
- HPD complaints
- 42
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 38
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2025
Open — Info nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 4, 2025
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 22, 2024
Open — Info nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2024
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 15, 2023
Open — Info nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 15, 2023
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 3, 2022
Open — Info nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 15, 2022
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 15, 2022
Open — Info nov sent out
Show 28 more ↓
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 1, 2021
Open — Info nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 25, 2019
Open — Info nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 5, 2018
Open — Info nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 6, 2017
Open — Info nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 24, 2016
Open — Info nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 1, 2015
Open — Info nov sent out - BHazardous
Arrange and make self-closing the doors , in the entrance located at apt 2a, 2nd story
Feb 7, 2009 · Apt 2A
Open — First no access to re- inspect violation - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2a, 2nd story
Feb 7, 2009 · Apt 2A
Open — First no access to re- inspect violation - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2a, 2nd story
Feb 7, 2009 · Apt 2A
Open — First no access to re- inspect violation - BHazardous
Properly secure the loose door saddle in the bathroom located at apt 2a, 2nd story
Feb 7, 2009 · Apt 2A
Open — First no access to re- inspect violation - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Jan 24, 2009
Open — Not complied with - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper.
Jan 30, 1998
Open — Not complied with - BHazardous
Section 300, 301, 302, m/d law file plans and obtain a certificate of occupancy to legalize the following alteration or restore premises to prior legal condition formcrcy 3 class a apts converted into 1 class a apt 2 sty.
Mar 5, 1996
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color water damaged ceiling & walls northwest room i sty apt 2b , section '' ''
Jul 27, 1994 · Apt 2B
Open — First no access to re- inspect violation - BHazardous
Provide hot water at all hot water fixtures 3 sty apt 3b , section '' ''
Feb 16, 1994 · Apt 3B
Open — First no access to re- inspect violation - BHazardous
Repair or replace the smoke detector missing 4 sty front east apt 4a zucker. , section '' ''
Mar 23, 1993 · Apt 4A
Open — First no access to re- inspect violation - BHazardous
Properly repair the broken or defective balance lower sash north window northeast room 5 sty east apt 5a. located at apt 5a
Jan 12, 1993 · Apt 5A
Open — First no access to re- inspect violation - ANon-hazardous
Properly repair with similar material the broken or defective glazing puddy top and bottom window sashes thru out 5 sty east apt 5a. located at apt 5a
Jan 12, 1993 · Apt 5A
Open — First no access to re- inspect violation - BHazardous
M/d law abate the nuisance consisting of lower sash south window at east painted shut southeast room 5 sty east apt 5a. located at apt 5a
Jan 12, 1993 · Apt 5A
Open — First no access to re- inspect violation - BHazardous
M/d law abate the nuisance consisting of moisture penetrating ceiling northeast room 5 sty east apt 5a. located at apt 5a
Jan 12, 1993 · Apt 5A
Open — First no access to re- inspect violation - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling northeast room 5 sty east apt 5a. located at apt 5a
Jan 12, 1993 · Apt 5A
Open — First no access to re- inspect violation - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper.
Jan 12, 1993
Open — Not complied with - BHazardous
Properly repair the broken or defective light fixture at wall 4 sty apt 5b bathroom. located at apt 5b
Sep 21, 1992 · Apt 5B
Open — First no access to re- inspect violation - BHazardous
Section 300, 301, 302, m/d law file plans and obtain a certificate of occupancy to legalize the following alteration or restore premises to prior legal condition four apts 2 sty converted to commercial space.
Sep 30, 1991
Open — First no access to re- inspect violation - BHazardous
Repair or replace the smoke detector missing 4 sty northwest apt 4a zucker. located at apt 4a
May 1, 1991 · Apt 4A
Open — First no access to re- inspect violation - BHazardous
Properly repair the broken or defective improperly counterbalance lower window sash 4 sty northwest apt 4a thru out. located at apt 4a
May 1, 1991 · Apt 4A
Open — First no access to re- inspect violation - ANon-hazardous
Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration commercial sink and walking in freezer cellar at east.
Sep 14, 1989
Open — First no access to re- inspect violation
DOB building violations · 32
- Construction other optional
Borough commissioner has issue a stop work order under application # 121332138. due to applicant or contractor withdrawal. stop all work
Jun 25, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 31, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 22, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 22, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 22, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 22, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 18, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 18, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 18, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 18, 2018
Dob violation - dismissed
Show 22 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 7, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 7, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 7, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 7, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 7, 2018
Dob violation - dismissed - Construction other optional
C-construction other optional
Jan 27, 2018
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Sep 27, 2017
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Sep 27, 2017
Vp*-violation unserved ecb- dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 28, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 4, 2015
Dob violation - dismissed - Construction other optional
C-construction other optional
Aug 18, 2009
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 2, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Construction other optional
C-construction other optional
Dec 5, 2001
Dob violation - dismissed - Construction other optional
C-construction other optional
Dec 5, 2001
Dob violation - dismissed - Construction other optional
C-construction other optional
May 17, 1994
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
May 17, 1994
Dob violation - dismissed - Construction other optional
C-construction other optional
Jun 1, 1992
Dob violation - dismissed - Construction other optional
C-construction other optional
Jun 1, 1992
Vp-violation unserved ecb-active - Construction other optional
C-construction other optional
Oct 9, 1991
Dob violation - dismissed - Construction other optional
C-construction other optional
Dec 9, 1988
Dob violation - dismissed
ECB violations · 52
- Class - 2
70z9 pit water leak remove
Mar 11, 2019
Resolve - Class - 2
Egress. at time of inspection i observed a temporary scaffold completely blocking off the staircase at the duplex level. workers were observed on the floors where the egress was blocked while the scaffold was n
Aug 7, 2018 · Penalty $10,000
Resolve - Class - 1
Bc 3314.4 scaffold. at time of inspection of a 10 story nb i observed the supported scaffold w/ loose platforms, excess concrete debris and missing toe boards throughout the entire scaffolds. scaffold was in us
Aug 7, 2018 · Penalty $12,500
Resolve - Class - 1
Unsafe storage of materials.at time of inspection observed materials stored against construction fence creating undue stress on fence and creating a condition where fence could fail and break/fall onto public p
May 21, 2018 · Penalty $2,500
Resolve - Class - 1
Guardrail-inadequate.at 6,7,8,9,10 flr observed guardrails that were inadequate cables were no taunt and moved more than 2 inches,mat windowcables no attached at staires 2 x 4 guardrails werent at correct heigh
May 21, 2018 · Penalty $2,500
Resolve - Class - 1
Missing handrails at time of inspection observed stair to hoie level had no handrail to prevent public from fall.at roof level,ladder to bulkhead,handrail did no extend 2'-0' onto bulkhead handrail did not exte
May 21, 2018 · Penalty $2,500
Resolve - Class - 1
Scaffold;at time of insepction observed scaffold erected erected to roof at exp1.planking on scaffold was not tied with wire or nailed creating a condition where planking could shift & dislodge at other areas o
May 21, 2018 · Penalty $2,500
Resolve - Class - 1
Fdny-general-fire extinguishers.at time of inspection observed multiple areas where fire extinguisher were not maintain in minimum of 4 inches off the floor or not hung.observed on floor where there was no fire
May 21, 2018 · Penalty $6,250
Resolve - Class - 1
3307.2.1 failure to comply w/dot regulations. at time of inspection on an active jobsite of a 10 story building, observed material storage on the street enclosed by a yodock system. material consisting of brick
Jan 27, 2018 · Penalty $1,600
Resolve - Class - 1
3304.4 sidewalk shed debris and material. at time of inspection on an active jobsite, observed debris, material storage on the sws. sws is to be maintained free of debris and materials at all times. under const
Jan 27, 2018 · Penalty $1,600
Resolve
Show 40 more ↓
- Class - 1
3304.7 required means of egress. at time of inspection of an active jobsite of a 10 story building observed that the means of egress were compromised. means of egress/ingress from hoist to work site and from wo
Jan 27, 2018 · Penalty $1,600
Resolve - Class - 1
Housekeeping. at time of inspection on an active jobsite of a 10 story building observed debris. building materials scattered throughout jobsite. also, by hoist areas this situation creates a trip and fall haza
Jan 27, 2018 · Penalty $2,400
Resolve - Class - 1
Failure to maintain/display on site documents required by chapter 33. note: observed 10 sty bldg erected to 10 fl,observed workers at 5th fl/3rd fl tied off to existing concrete enbedded straps. there is no tra
Dec 7, 2017
Resolve - Class - 2
Sec. 3303.4.7 storage rear sidewalks/walkways. note: 10 sty bldg erected to 10 fl observed on 62 st bricks pallets stacked approx 5-6 feet high in street only be 3 feet high. remedy: comply w/code.
Dec 7, 2017
Resolve - Class - 2
Failure to maintain: housekeeping note: 10 sty bldg erected to 10 fl at exp#2 of site. workers performing stucco operation. there is white debris blowing off scaffold into air & street. the debris should be con
Dec 7, 2017 · Penalty $800
Resolve - Class - 2
Work does not conform to approved construction documents &/or approvedamendments. note: at time of inspection observed supported scaffold about 150 foot in height on top of sidewalk shed upon further review of
Dec 4, 2017 · Penalty $250
Resolve - Class - 2
Failure to have sidewalk shed built according to plan.note at time of inspection i observed sidewalk shed in place missing cross braces & verticle pipe.rem:comply with code provide crossbraces & verticle pipe.
Dec 4, 2017
Resolve - Class - 1
Bc 3308.6.1.4 supported scaffold(alternative) horizontal nets.note:observed active site,erected to the 10 fl level @exp#1/4 there is a supported (scaffold) in place in (lines) of horizontal (nets).there air res
Sep 27, 2017 · Penalty $1,600
Resolve - Class - 1
Work does not conform to approved const docs as amendments.note:10 story bldg erected to the 10 fl level, observed shear will platform installed @exp#2/3 (@)6th fl the platform are not erected as per designs on
Sep 27, 2017 · Penalty $1,000
Resolve - Class - 2
Failure to maintain housekeeping.note:10 story bldg erected to (10 fl) level not enclosed observed various housekeeping issues.(hz) (nets) exp#3 not clean,lead edge exp#1 not clean, stairs not clean,supported s
Sep 27, 2017 · Penalty $800
Resolve - Class - 1
Bc 3305.3.6.1.2 (reshores) in (proxmity) of uneclosed perimeter note:10 story bldg erected to the 10 fl level the bldg is not enclosed @perimeter.there are approx 15-20 (reshores) on 9 fl, 10 fl that are @the l
Sep 27, 2017 · Penalty $1,600
Resolve - Class - 1
Failure to institute/(recreation).safety equipmtment measure or temp const:toe boards note:@time of insp 10 story bldg masonry work being done on the interior of bldg i observed guardrail w/inadequate toeboards
Sep 27, 2017 · Penalty $1,000
Resolve - Class - 1
Bc3301.2/safety measures:note at time of inspection of a 10 story new building at bulkhead level.i observe safety embeded straps installed at several floors at perimeter and interior.i ask for a daily log for
Aug 30, 2017 · Penalty $1,630
Resolve - Class - 1
Safety measures.note at time of inspection of a 10 story new building at bulkhead phase.i observed on all floor at elevator shaft-a temporary platform i erected and being use as a means egress.with wooden ladde
Aug 30, 2017 · Penalty $1,630
Resolve - Class - 2
Failure to maintain adequate house keeping.note at time of inspection of a 10 story new building at bulkhead level.i observe excessive debris and construction equipment and cardboard scattered over several loca
Aug 30, 2017
Resolve - Class - 2
Work does not conform to approved construction documents.note:at time of inspection of a 10 story new building at bulkhead level.i observed a supported scaffold erected to 8fl.checking the site safety plain sho
Aug 30, 2017
Resolve - Class - 1
Bc3307.7.5 design of fences. note: at time of my inspection of a 10 story bldg at excavation phase, construction work in progress.i observe apprx 140 feet of construction fence ereced at exp1 and 4 made of
Oct 4, 2016 · Penalty $1,600
Resolve - Class - 1
Guardrail system. note: at the time of my inspection of a 10 story building in excavation phase construction work in progress. i observed that there were no guardrail system provided at side of excavation at ex
Oct 4, 2016 · Penalty $2,400
Resolve - Class - 2
Pedestrian protection does not meet code specs.noted:observed sidewalkshed erected @exp#1(e 62 st)& exp#4(2nd ave) under permit #122415797-01-eq-sh.sidewalk shed lights not operating @time of insp 1:45 am that
Sep 12, 2015 · Penalty $400
Resolve - Class - 1
Sec. 3307.6.5 failure to maintain sidewalk shed no artificial lightingas per code. at time of complaint inspection noted that lighting undersidewalk shed are not connected to any electrical output. therefore
Sep 9, 2015 · Penalty $1,600
Resolve - Class - 1
Failure to carry out demolition operations as required by section of code.at time of insp.noted that @ the 3rd level of job all the joist where removed leaving 3 walls fuse standing also the floor joist on the
Aug 13, 2015 · Penalty $2,400
Resolve - Class - 1
Sec. 3314.8 guardrails & toe boards. at time of inspection observed,active job site. supported pipe scaffold erected at exp#1,2,3 & 4. guardrails are inadequate at exp#1 & 2 & are placed lower than the required
Aug 3, 2015 · Penalty $1,600
Resolve - Class - 2
Failure to maintain adequate housekeeping. at time of inspection observed,active job site. debris found on all floors not cleaned from site.the job site foreman stated that the debris have not been cleaned dail
Aug 3, 2015 · Penalty $400
Resolve - Class - 1
Sec. 3301.7 design drawing required. at time of inspection observed,active job site. supported pipe scaffold erected at the exterior of the bldg at all exposures. approved plans only show the scaffold erected @
Aug 3, 2015 · Penalty $1,000
Resolve - Class - 2
Pedestrian protection does not meet code specs.noted @ time of inspection underside lights for sidewalk shed are not lit.time of inspection 10pm.rem comply w/ code
Jul 10, 2015 · Penalty $2,400
Resolve - Class - 2
Sidewalk shed does not meet code specifications noted:signage missing junior beams cantileviered on both ends approx 4 lf.remedy:conform shed to code specifications
Mar 4, 2010 · Penalty $2,400
Resolve - Class - 2
Sidewalk shed does not meet bldg code specs noted shed at exp #1 missing horizontal bracing and columns are out of plumb and not level shed is beaming draticaly previous vio's written agg 2 condition for hitor
Dec 24, 2009 · Penalty $2,400
Resolve - Class - 2
Failure to maintain lighting under sidewalk shed noted at approx 6pm in dark the lighting under shed is inoperable previous vio's written for this condition.remedy maintain lighting.
Dec 24, 2009 · Penalty $2,400
Resolve - Class - 2
Sdwlk shed doesnt meet bldg code spec's.noted:shed @ exp#1 under permit#120148562.the support columns are out of plums & not level & it is missing horizontal & cross bracing.vio written 12-2-09 for some conditi
Dec 18, 2009 · Penalty $2,400
Resolve - Class - 2
Failure to maintain lighting under shed. noted: shed erected at exp #1. lights are inoperable at approx 6 am. remedy: maintain shed lighting.
Dec 2, 2009 · Penalty $2,400
Resolve - Class - 2
Sidewalk shed does not meet bldg code specifications. noted: shed at exp #1 under pmt #120148562. the columns are out of plumb and not level approx 6" to 8" cross bracing is disconnected and electric for
Dec 2, 2009 · Penalty $2,400
Resolve - Class - 1
Sec. bc 1001.4, 27-365. inadequate exits from existing structure: illegal condition. noted: at 4th fl apt 4b (rear) & 5th fl apt 5b (rear) having no 2nd means of egress as required by law. remedy: provide
Jul 22, 2008 · Penalty $1,600
Resolve - Non-hazardous
Work without permits demolition of interior partition walls & ceilings at secend floor apartment 2b remedy: stop all work obtain approals permits before doing any futher construction.
Aug 21, 2002
Resolve - Non-hazardous
Occupancy contrary to certificate of occupancy noted: occuapncy at rear of 1st flr residential lobby is contrary to building department records (altereation plan alt 1038/45 c. of o. 32/72 rear of residentail l
Dec 22, 1995 · Penalty $1,000
Resolve - Non-hazardous
Occupancy contrary to that allowed by the certificate of occupancy #32172.from 3apt at 2nd fl to office for computer services remedy discontinue illegal use or obtain a valid c of o for current use.
Nov 29, 1995 · Penalty $800
Resolve - Non-hazardous
Work without a permit work noted partition walls removed kitchen fixture /cabinets removed bathroom fixture removed changing 3apts at 2nd flr to open office space remedy obtian a permit if feasible or restore p
Nov 29, 1995
Resolve - Non-hazardous
Failure to maintain bldg wall:defect is: at east 62st side of premises3 floor brownstone lintels are spalling,cracked + defective.section ofuntel has broken off +struck pedestrian at sidewalk.remedy:provide pro
Aug 10, 1995 · Penalty $800
Resolve - Non-hazardous
Contrary to the c of o isssued oct.3 1946 the 2nd story use has been changed from 3 aprtments to offices.remedy:discontinue the use or 2 if feasible file with this dept.and obtain a new c of o.
Feb 16, 1993 · Penalty $350
Resolve - Non-hazardous
Occupancy at rear of 1st floor residential lobby is contrary to building department records (alteration plan alt 1038 - 45, c/0 #32172. rear of residential lobby has been cobnverted to office use (realestate of
Oct 2, 1991 · Penalty $285
Resolve - Non-hazardous
Contrary to certificate of occupancy issued october 3 1946 the wnd story use has been changed from 3apts to offices remedy discontinue ue or if feasible obtain new coertificate of occupancy
Oct 17, 1990
Resolve
Complaints
- Unsanitary condition
Pests
May 13, 2026 · Apt 1
Close - Heat/hot water
Entire building
May 13, 2026 · Apt 1
Close - Unsanitary condition
Pests
May 13, 2026 · Apt 1
Close - Unsanitary condition
Pests
May 13, 2026 · Apt 1
Close - Door/window
Door
May 13, 2026 · Apt 1
Close - Electric
Power outage
May 13, 2026 · Apt 1
Close - Plumbing
Water supply
May 13, 2026 · Apt 1
Close - Plumbing
Water supply
May 13, 2026 · Apt 1
Close - Door/window
Door
May 13, 2026 · Apt 1
Close - Electric
No lighting
May 13, 2026 · Apt 1
Close
Show 32 more ↓
- Door/window
Door
May 13, 2026 · Apt 1
Close - Plumbing
Toilet
May 13, 2026 · Apt 1
Close - Heat/hot water
Apartment only
May 13, 2026 · Apt 1
Close - Plumbing
Water supply
May 13, 2026 · Apt 1
Close - Electric
Power outage
May 13, 2026 · Apt 1
Close - Door/window
Door
May 13, 2026 · Apt 1
Close - Paint/plaster
Wall
Aug 4, 2008 · Apt 4
Close - Nonconst
Vermin
Dec 5, 2007 · Apt 4B
Close - Nonconst
Vermin
Dec 5, 2007 · Apt 4B
Close - General
Floor
Dec 5, 2007 · Apt 4B
Close - Electric
Lighting
Dec 5, 2007 · Apt 4B
Close - Plumbing
Basin/sink
Dec 5, 2007 · Apt 4B
Close - Plumbing
Toilet
Dec 5, 2007 · Apt 4B
Close - General
Doors
Dec 5, 2007 · Apt 4B
Close - General
Windows
Dec 5, 2007 · Apt 4B
Close - General
Windows
Dec 5, 2007 · Apt 4B
Close - Paint/plaster
Wall
Dec 5, 2007 · Apt 4B
Close - Heating
Heat related
Dec 5, 2007 · Apt 4B
Close - Paint/plaster
Wall
Jun 27, 2007 · Apt BLDG
Close - Appliance
Electric/gas range
Dec 14, 2006 · Apt 4B
Close - General
Floor
Dec 14, 2006 · Apt 4B
Close - Paint/plaster
Wall
Dec 14, 2006 · Apt 4B
Close - Paint/plaster
Wall
Dec 14, 2006 · Apt 4B
Close - General
Doors
Dec 14, 2006 · Apt 4B
Close - General
Windows
Dec 14, 2006 · Apt 4B
Close - General
Windows
Dec 14, 2006 · Apt 4B
Close - Nonconst
Vermin
Dec 14, 2006 · Apt 4B
Close - Nonconst
Vermin
Dec 14, 2006 · Apt 4B
Close - Nonconst
Vermin
Dec 14, 2006 · Apt 4B
Close - Nonconst
Vermin
Dec 14, 2006 · Apt 4B
Close - Nonconst
Vermin
Mar 23, 2004 · Apt 4B
Close - Nonconst
Vermin
Mar 23, 2004 · Apt 4B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 2016
- Floors
- 10
- Residential units
- 6
- Building area
- 17,164 ft²
- Lot area
- 1,779 ft²
- Zoning
- C2-8
- Community board
- 108
- Council district
- 5
- Block / lot
- 1417 / 21
- Assessed value
- $3,573,000
- Landmark / historic district
- No
HPD registration #132664, last renewed Dec 23, 2014.
Questions about 253 East 62nd Street
Who owns 253 East 62nd Street?
The owner of record in NYC Department of City Planning PLUTO data is 253 East 62nd Street,.
Does 253 East 62nd Street have violations?
Yes. NYC HPD has recorded 38 housing violations at this property.
Is 253 East 62nd Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 253 East 62nd Street built?
City records list 2016 as the year it was built.
How many apartments are in 253 East 62nd Street?
It has 6 residential units and 7 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.