111 East 75 Street is an elevator apartment building built in 1925 in Manhattan, 10021. It has 36 residential units across 10 floors. The owner of record is 111 Tenants Corp. HPD has recorded 26 housing violations here, most recently on November 17, 2025.
- HPD violations
- 26
- DOB violations
- 32
- ECB violations
- 36
- HPD complaints
- 46
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 26
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2024
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 15, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 15, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - BHazardous
Provide adequate supply of cold water for the fixtures at sink in the kitchen located at apt 10a, 10th story, 1st apartment from west at north
Jun 6, 2017 · Apt 10A
Closed — Violation dismissed - BHazardous
Provide adequate supply of hot water for the fixtures to sink in the kitchen located at apt 10a, 10th story, 1st apartment from west at north
Jun 6, 2017 · Apt 10A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall at the terrace door in the 1st room from north at west located at apt 10a, 10th story, 1st apartment from east at south
Nov 15, 2013 · Apt 10A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall at the window in the 1st room from north at west located at apt 10a, 10th story, 1st apartment from east at south
Nov 15, 2013 · Apt 10A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall at the window in the 2nd room from north at west located at apt 10a, 10th story, 1st apartment from east at south
Nov 15, 2013 · Apt 10A
Closed — Violation closed
Show 16 more ↓
- BHazardous
Properly repair with similar material the broken or defective 18'' by 18'' concrete floor tiles at the west section in the terrace located at apt 10a, 10th story, 1st apartment from east at south
Nov 15, 2013 · Apt 10A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective mortar in the bricks at the lintel over the window at west in the terrace located at apt 10a, 10th story, 1st apartment from east at south
Nov 15, 2013 · Apt 10A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south and west walls in the 2nd room from north at west located at apt 10a, 10th story, 1st apartment from east at south
Oct 19, 2013 · Apt 10A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 1st room from north at west located at apt 10a, 10th story, 1st apartment from east at south
Oct 19, 2013 · Apt 10A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls, in the entire apartment located at apt ptha, 10th story, 1st apartment from north at east
Oct 7, 2013 · Apt PTHA
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling, in the entire apartment located at apt ptha, 10th story, 1st apartment from north at east
Oct 7, 2013 · Apt PTHA
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at west and south walls in the 2nd room from north at west located at apt 10a, 10th story, 1st apartment from east at south
Oct 4, 2013 · Apt 10A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west and south walls in the 2nd room from north at west located at apt 10a, 10th story, 1st apartment from east at south
Oct 4, 2013 · Apt 10A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color west and south wall in the 1st room from north located at apt 10a, 10th story, 1st apartment from east at south
Sep 11, 2013 · Apt 10A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective broken pavers west section of terrace located at apt 10a, 10th story
Sep 11, 2013 · Apt 10A
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of moisture penetration at north west wall by window in the foyer located at apt 10a, 10th story, 1st apartment from east at south
Aug 10, 2010 · Apt 10A
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color north wall by window in the foyer located at apt 10a, 10th story, 1st apartment from east at south
Aug 10, 2010 · Apt 10A
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 10a, 10th story, 1st apartment from east at south
Aug 10, 2010 · Apt 10A
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 10a, 10th story, 1st apartment from east at south
Aug 10, 2010 · Apt 10A
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing tenant linda stromberg in the entire apartment located at apt 3c, 3rd story, 1st apartment from west at north
Oct 11, 2000 · Apt 3C
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls throughout east & west section bulkheads.
Aug 27, 1998
Closed — Violation closed
DOB building violations · 32
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2024
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2024
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 26, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 26, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 9, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 19, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 19, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 17, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 19, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 19, 2014
Dob violation - resolved
Show 22 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Jul 12, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 29, 2012
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 29, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 29, 2012
Dob violation - resolved - Landmark none
Landmk-landmark none
Nov 18, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 2, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 2, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 27, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 27, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 19, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 19, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 15, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 18, 2003
Dob violation - resolved - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed - Landmark none
Landmk-landmark none
Mar 30, 2001
Dob violation - dismissed - Landmark none
Landmk-landmark none
Mar 30, 2001
Dob violation - dismissed - Landmark none
Landmk-landmark none
Mar 30, 2001
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 8, 2001
Dob violation - dismissed - Plumbing none
P-plumbing none
Oct 16, 2000
Vw*-violation - work w/o permit dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 17, 1995
Dob violation - dismissed
ECB violations · 36
- Class - 1
Rigger failed to designated a foreman. noted:no rigging foreman on site while rigging was in use. a mr. jose reyes did have a dob foreman card #3991 with a exp date of 3/31/08 from "olancho const corp"r-5945 me
Jan 6, 2012 · Penalty $400
Resolve - Class - 1
Licensed rigger failed to ensure scaffold worker met minimum requirements. noted:the following workers on rigging that was in use at time ofinspection did not have certificates of fitness:geovanny paul rorlas r
Jan 6, 2012 · Penalty $1,600
Resolve - Class - 2
Failed to notify department/obtain permit prior to use/inst off "c" hooks in connection with suspended scaffolds. noted:no notification for "c" hooks for suspended scaffolds in use at time of inspection. rem:no
Jan 6, 2012 · Penalty $400
Resolve - Non-hazardous
Failure to maintain exterior defects noted: at 10th fl terrace north side,plumbing stack vent pipes affixed to apt bulkhead are rusted, broken & cracked diffusing fumes below designated terminus. remedy: make
Apr 10, 2007 · Penalty $2,500
Resolve - Non-hazardous
Failure to comply w/ protective railing height requirements: defects noted: at 10 fl terrace north side of bldg terrace enclosure parapet wall height is 37" as measured to finish deck & does not meet bldg code
Apr 10, 2007 · Penalty $2,500
Resolve - Hazardous
No toe board on a two point suspension scaffold observed @ time of inspection no toe board on scaffold.
Dec 19, 2006
Resolve - Hazardous
Licensed rigger failed to ensure scaffold workers met minimum requirements.observed at the time of inspection there is no qualified personnel working on scaffold.
Dec 19, 2006 · Penalty $500
Resolve - Hazardous
Sect.27-1045.all suspension elements are vertical & inparallel to the wall at all times.(ropes & cables cannot jump over terraces(setbacks) etc.)observed @ time of inspection cables for the two point suspension
Dec 19, 2006
Resolve - Hazardous
Sect.27-1055.ropes & cables shall not be made fast to sharp objects orsurfaces observed @ time of inspection the two point suspended scaffo ld cable is rubbing against the sharp corner of the terrace wall.
Dec 19, 2006
Resolve - Hazardous
Sec.27-1042.all scaffolds shall be erected & maintained so that the safety of the public & property will not be impaired by falling materialtools,or debris or by collapse of the scaffold.observed @ time of
Dec 19, 2006
Resolve
Show 26 more ↓
- Hazardous
Supervision or use of rigging equipment w/o a special riggers license.observed at time of insp there is no special rigger license holder on job site.
Dec 19, 2006 · Penalty $500
Resolve - Hazardous
No center iron on a two point suspension scaffold observed @ time of inspection there is no center iron existing on a two point suspension scaffold.
Dec 19, 2006
Resolve - Hazardous
Failure to obtain proper permits (cd5 for outrigger beams)observed at time of inspection there was no cd5 permits w/ the dob.
Dec 19, 2006
Resolve - Hazardous
Operation of a crane,derrick or hoisting equipment in an unsafe mannerobserved @ time of inspection due to improper cable attachment scaffo ld was tilted towards the bldg @ an unsafe angle.
Dec 19, 2006
Resolve - Hazardous
Use of a two point suspension scaffold w/ stirrups placed approximate ly two feet from the end of the platform.observed @ time of inspectionstirrup is attached to the scaffold platform approximately two feet
Dec 19, 2006
Resolve - Hazardous
Use of rigging equipment w/o proper danger signs observed @ time of inspection two point scaffold hanging over a public courtyard w/ no danger signs or roped off areas.
Dec 19, 2006
Resolve - Hazardous
Licensed rigger designated an unqualified foreman observed @ time of inspection there is no qualified foreman on jobsite.
Dec 19, 2006
Resolve - Hazardous
Licensed rigger failed to ensure scaffold workers met minimum require ments.observed at time of inspection there is no qualified personnel working on scaffold.
Dec 19, 2006
Resolve - Hazardous
Supervision or use of rigging equipment w/o a special riggers license observed @ time of inspection there is no special riggers license holder on job site.
Dec 19, 2006
Resolve - Hazardous
Operation of a crane or hoisting equipment in an unsafe manner. observed at time ofinsp due to improper cable attachment scaffolding tilted towards the bldg at an unsafe angle.
Dec 19, 2006 · Penalty $4,000
Resolve - Hazardous
Sec. 27-1045. all supervision elements are vertical and in parallel tothe wall at all times.(ropes and cables cannot jump over terrace,setback,etc) observed at time of inspection cables for the two points
Dec 19, 2006 · Penalty $500
Resolve - Hazardous
Sec.27-1055. ropes and cables shall not be made fast to sharp objects,or surfaces. observed at time of inspection the two point suspended s caffold cable is rubbing against the sharp corner of the terrace wall.
Dec 19, 2006 · Penalty $500
Resolve - Hazardous
Sec.27-1042 all scaffolds shall be erected & maintained so that the safety of the public & properly will not be impaired by falling material, tools or debris or by collapse of the scaffold. observed at time of
Dec 19, 2006 · Penalty $500
Resolve - Hazardous
Sec.27-1046(e)(2) two or more two point suspension scaffold combined into one by bridging the distance b/w them or by connecting them together. observed at time of inspections top rail (pipe) is used to tie two
Dec 19, 2006 · Penalty $500
Resolve - Hazardous
No toeboards on a 2 point suspension scaffold. observed at time of inspection no toe boards on scaffold.
Dec 19, 2006 · Penalty $750
Resolve - Hazardous
No center iron on two points suspension scaffold observed at time of inspection there is no center iron existing on a two point suspended scaffold.
Dec 19, 2006 · Penalty $750
Resolve - Hazardous
Failure to obtain proper permits (cd5 for outrigger beams) observed attime of inspection there was no cd5,permit w/ the dob.
Dec 19, 2006 · Penalty $500
Resolve - Hazardous
Approved plans not available for inspection.observed at time of inspection there is no approved plans on job site and/or available for inspection.
Dec 19, 2006 · Penalty $500
Resolve - Hazardous
Sec.27-1046 use of a two point suspension scaffold w/ stirrups placed approx. two ft from the end of the platform. observed at the time of inspection stirrups is attached to the scaffold platform by approx. two
Dec 19, 2006 · Penalty $500
Resolve - Hazardous
Use of rigging equipment w/o proper danger signs.observed at time of inspection two point scaffold hanging over a public courtyard with no danger signs or roped off areas.
Dec 19, 2006 · Penalty $500
Resolve - Hazardous
Licensed rigger designated an unqualified foreman. observed at the time of the inspection there is no qualified foreman on jobsite.
Dec 19, 2006 · Penalty $500
Resolve - Hazardous
Approved plans not available for inspection observed @ time of inspection there is no approved plans on jobsite &/or available for inspection.
Dec 19, 2006
Resolve - Non-hazardous
Failure to submint a fifth round techincal report periodic inspection of exterior walls and appurtenances as required by local law 11 of 1998 and the dept of bldg rules and regulations remedy file the required
Sep 24, 2003
Resolve - Non-hazardous
Failure to submit a fifth round technical report:periodic inspection of exterior walls and appurtenances as required by local law 11 of 1998and the dept of bldg rules and regulations:remedy:file the required
Mar 3, 2003
Resolve - Non-hazardous
Plumbing work without a permit. (installing gas pipe + meter bar with out a permit.) remedy:obtain a permit if feasible or/restore to prior legal condition.
Oct 16, 2000 · Penalty $800
Resolve - Non-hazardous
03o,25o,30o,
Dec 10, 1997
Resolve
Complaints
- Heat/hot water
Entire building
Feb 1, 2026 · Apt 5B
Close - Plumbing
Water supply
Jun 1, 2017 · Apt 10A
Close - Plumbing
Water supply
Jun 1, 2017 · Apt 10A
Close - Heat/hot water
Entire building
May 30, 2017 · Apt 1B
Close - Heat/hot water
Apartment only
Apr 2, 2016 · Apt 6D
Close - Paint/plaster
Wall
Nov 7, 2013 · Apt 10A
Close - Plumbing
Water-leaks
Nov 7, 2013 · Apt 10A
Close - Paint/plaster
Wall
Nov 4, 2013 · Apt PTHA
Close - Paint/plaster
Wall
Oct 11, 2013 · Apt 10A
Close - Paint/plaster
Wall
Oct 11, 2013 · Apt 10A
Close
Show 36 more ↓
- Plumbing
Water-leaks
Oct 11, 2013 · Apt 10A
Close - Plumbing
Water-leaks
Oct 8, 2013 · Apt PTHA
Close - Plumbing
Water-leaks
Oct 8, 2013 · Apt PTHA
Close - Paint/plaster
Wall
Oct 8, 2013 · Apt PTHA
Close - Paint/plaster
Wall
Oct 8, 2013 · Apt PTHA
Close - Plumbing
Water-leaks
Oct 1, 2013 · Apt PTHA
Close - Plumbing
Water-leaks
Oct 1, 2013 · Apt PTHA
Close - Paint/plaster
Wall
Oct 1, 2013 · Apt PTHA
Close - Plumbing
Water-leaks
Sep 4, 2013 · Apt 10A
Close - General
Fire-escape
Aug 28, 2013 · Apt BLDG
Close - General
Mold
Aug 21, 2013 · Apt 10A
Close - Paint/plaster
Wall
Aug 21, 2013 · Apt 10A
Close - Plumbing
Water-leaks
Aug 21, 2013 · Apt 10A
Close - General
Ventilation system
Aug 5, 2010 · Apt 10A
Close - Paint/plaster
Wall
Aug 5, 2010 · Apt 10A
Close - Paint/plaster
Ceiling
Aug 5, 2010 · Apt 10A
Close - Plumbing
Water-leaks
Aug 5, 2010 · Apt 10A
Close - Heating
Heat related
Nov 7, 2009 · Apt 4B
Close - Heating
Heat related
Oct 13, 2009 · Apt 4B
Close - Paint/plaster
Wall
Nov 26, 2008 · Apt 4B
Close - Paint/plaster
Wall
Nov 26, 2008 · Apt 4B
Close - General
Mold
Nov 26, 2008 · Apt 4B
Close - Paint/plaster
Wall
Nov 26, 2008 · Apt 4B
Close - General
Floor
Nov 26, 2008 · Apt 4B
Close - Heating
Heat related
Oct 19, 2008 · Apt 6D
Close - Heating
Heat related
May 2, 2008 · Apt 4B
Close - Heating
Heat related
Apr 29, 2008 · Apt 4B
Close - Heating
Heat related
Jan 4, 2008 · Apt 7C
Close - Heating
Heat related
Jan 4, 2008 · Apt 7C
Close - Heating
Heat related
Feb 4, 2006 · Apt 4B
Close - Heating
Heat related
Feb 4, 2006 · Apt BLDG
Close - Heating
Heat related
Oct 21, 2005 · Apt BLDG
Close - Heating
Heat related
Oct 21, 2005 · Apt BLDG
Close - Heating
Heat related
Oct 3, 2003 · Apt 4B
Close - Heating
Heat related
May 5, 2003 · Apt 4B
Close - Heating
Heat related
May 5, 2003 · Apt 4B
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Dec 31, 2025 | $1,850,000 | Coops - elevator apartments | — |
| Dec 18, 2025 | Non-market transfer | Coops - elevator apartments | — |
Building details
- Building type
- Elevator apartment building (D4)
- Year built
- 1925
- Floors
- 10
- Residential units
- 36
- Building area
- 36,301 ft²
- Lot area
- 5,482 ft²
- Zoning
- R8B
- Community board
- 108
- Council district
- 4
- Block / lot
- 1410 / 9
- Assessed value
- $4,641,750
- Landmark / historic district
- Upper East Side Historic District
HPD registration #122630, last renewed Jan 13, 2026.
Questions about 111 East 75 Street
Who owns 111 East 75 Street?
The owner of record in NYC Department of City Planning PLUTO data is 111 Tenants Corp.
Does 111 East 75 Street have violations?
Yes. NYC HPD has recorded 26 housing violations at this property.
Is 111 East 75 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 111 East 75 Street built?
City records list 1925 as the year it was built.
How many apartments are in 111 East 75 Street?
It has 36 residential units and 38 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.