25 Sutton Place South
Manhattan, NY 10022BBL 1-01371-0038Map
Owner of record: Cannon Point North INC
25 Sutton Place South is an elevator apartment building built in 1959 in Manhattan, 10022. It has 320 residential units across 20 floors. The owner of record is Cannon Point North INC. HPD has recorded 3 housing violations here, most recently on May 12, 1992.
- HPD violations
- 3
- DOB violations
- 99
- ECB violations
- 35
- HPD complaints
- 2
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 3
- CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock street door to 1 sty public hall.
May 12, 1992
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock vestibule door to 1 sty public hall.
May 12, 1992
Closed — Violation closed - CImmediately hazardous
Repair and operate the gas appliance so as to prevent carbon monoxide incinerator room cellar north er1.
Apr 12, 1988
Closed — Violation dismissed
DOB building violations · 99
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 16, 2024
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Construction other optional
C-construction other optional
Aug 14, 2019
Vp*-violation unserved ecb- dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 16, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 16, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 16, 2019
Dob violation - resolved - Facade safety program facade required
Fisp-facade safety program facade required
Feb 15, 2019
Dob violation - dismissed - Construction other optional
Emergency work remedy: owner is directed to immediately pproceed with the stabilization of a masonry wall above the southbound lanes of fdr drive and the removal of the back that represents significant risk to traffic below the bldg.file for permits w/in 48hrs commencing work
Dec 17, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 16, 2018
Dob violation - resolved
Show 40 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
May 16, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 16, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 16, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 16, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 16, 2018
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 4, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 4, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 4, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 4, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 4, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 4, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 29, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 29, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 29, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 29, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 29, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 22, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 22, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 22, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 22, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 22, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 14, 2014
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 11, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 11, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 11, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 11, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 11, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 11, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 10, 2014
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 12, 2014
Dob violation - dismissed - Construction other optional
Boro-comm has issued an immediate stop work order due to withdrawal of app# 121380674 as of 05/15/2013 remedy: stop all work immediately, submitt all required documents to the boro-comm office forthwith
May 15, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 7, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 7, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 7, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 7, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 7, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 6, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 6, 2012
Dob violation - resolved
ECB violations · 35
- Class - 1
Atoi on a 19 story bldg. observed electrical work was perform@apt:#4c, @bathroom,&kitchenette upon reviewing. and doing a search on bis/dob now reveal to me that no permit was issued for electrical work for tha
Aug 7, 2024 · Penalty $1,600
Resolve - Class - 1
Sec. 3314.4 installation inspection,repair,maintenance,adjustment use & removal of scaffolds. at time of comp inspection i observed suspended pipe scaffold erected at roof level inadequately maintain failure to
Apr 13, 2020 · Penalty $2,500
Resolve - Class - 1
Work does not conform to manufacturers specifications.at time of inspection of a 20 story existing building under facade restoration,i observed multiple windsafe beams with supported scaffolds attached with the
Aug 14, 2019 · Penalty $2,500
Resolve - Class - 1
Work does not conform to approved construction documents and or approved amendments.at time of inspection i observed multiple suspended scaffolds with the following conditions.wrong tie-back locations not as pe
Aug 14, 2019 · Penalty $625
Resolve - Class - 1
Failure to maintain/display on site documents required by chapter 33.at time of inspection of a 20 story existing bldg under facade restoration,i observed several suspended scaffold with the backs no parapet cl
Aug 14, 2019 · Penalty $1,250
Resolve - Class - 1
No record of daily inspection of suspended scaffold performed by authorized person at site. at time of inspection of a 20 story building un-der facade restoration, i observed suspended scaffolds at exp #1, unde
Aug 14, 2019 · Penalty $1,250
Resolve - Class - 1
Failure to provide sidewalk shed where required.at the sidewalk shed at exp#2 and part of exp#1 shed had been removed.i observed extensive work remaining on the roof,material and equipment stored on roof in the
Aug 14, 2019 · Penalty $10,000
Resolve - Class - 1
Failure to institute safety measures-caz.at time of inspection of a 20story existing building under facade restoration,i observed the following.balcony at exp#4 with tenant access-outrigger beams/equipment abov
Aug 14, 2019 · Penalty $10,000
Resolve - Class - 1
Bc1704.1/failure to file special inspection statement of responsibility prior to permit issuance and prior to start of work under special inspection requirement.at time of inspection of a 20 story existing bldg
Aug 14, 2019 · Penalty $2,500
Resolve - Class - 2
Failure to post or distribute "safe construction bill of rights"at time of inspection of a 20-story existing building under facade restoration i observed that the "safe construction bill of rights had not been
Aug 14, 2019
Resolve
Show 25 more ↓
- Class - 2
Failure to post notice of tenant protection plan(tpp)at time of inspection of a 20 story existing building under facade restoration i observed that the notice of the tpp had been posted in the building near the
Aug 14, 2019
Resolve - Class - 1
Unsafe rigging/at time of inspection of a 20 story existing building under facade restoration i observed suspended scaffolds with the following conditions.tie back from above tied to back of beam.inadequate att
Aug 14, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to institute maintain safety equipment measures or temporary construction-guardrails.at time of inspection of a 20 story existing building under facade restoration i observed several setbacks/balconies
Aug 14, 2019 · Penalty $2,500
Resolve - Class - 2
Failure to comply with the commissioners order to file a certificate of failure to comply with the commissioners order contained in summons/violation #35322727y issued on 06/20/2018 and to file a certificate of
Aug 8, 2018
Resolve - Class - 2
Sec. 3310.4 condition of site has to be conformance w/ssp. note: at time of inspection i observed supported scaffold in place on exp#3 bldg court yard that does not reflect on the approved site safety plan.
Jun 26, 2018 · Penalty $625
Resolve - Class - 2
Sec. 28-104.12.2 built contrary to plan-all equipment must be installed as per cd/5 approved plan. note: at time of inspection i observed i observed several suspended scaffold in use w/the installation of delta
Jun 26, 2018 · Penalty $625
Resolve - Class - 2
Sec. 3307.6.5.8 periodoc inspection. failed to perform periodic inspe ction on shed. 6 months after intial & every 6 months there after. note: at time of inspection i observed sidewalk shed in place on exp#1&2
Jun 26, 2018 · Penalty $625
Resolve - Class - 2
No storage on shed. pedestrian protection does not meet code specifications storage not allowed unless permits state designated area. note: at time of inspection,i observed shed in palce on exp#4 w/storage of
Jun 26, 2018 · Penalty $2,400
Resolve - Class - 1
Failure to immediately notify the dept of an accident noted:@time of insp,observed as per qsp(jeff sperle) the incident took place on 06/19/2018 w/out notifying the dept of the incident immediately.rem:comply w
Jun 20, 2018 · Penalty $5,000
Resolve - Class - 1
Failure to safeguard all persons & property affected by const ops.noted:@the time of insp, i was responding to an imformed by manuel mangandid (foreman) & jeffrey sperle (sp) of the events (which) caused injury
Jun 20, 2018 · Penalty $5,000
Resolve - Class - 1
Equipment is contrary to plan. all equipment must be installed as per cd/5 approved plan. note: at time of inspection i observed several suspended scaffold in used w/suspended scaffolds using pipes & clamps are
Mar 23, 2018 · Penalty $2,500
Resolve - Class - 1
Work w/o permit. noted: at garage cellar,installed full height partitions approx 25'x30'x8'high constructed of 2"x4" wood studs & sheeted w/plywood. partitions enclose boiler room area. this non fire proof cons
Dec 14, 2013 · Penalty $800
Resolve - Class - 2
Failure to maintain bldg in code compliant manner. noted: at garage cellar level,spalling concrete ceiling in several areas exposes rebars to rusting. remedy: repair &/or replace concrete masonry ceiling.
Dec 14, 2013 · Penalty $250
Resolve - Class - 1
Failure to maintain bldg code compliant: use of prohibited hardware per bc008.1.8;27-371(j). noted: at garage,1st fl & cellar level exit doors have locking device installed requiring key to open.c this egress
Dec 14, 2013 · Penalty $1,030
Resolve - Class - 2
Failure to provide approved/accepted plans at job site at time of inspection for alt 2 job #12104125 of which permit is active & work is in progress at apt 11n. rem:contact this office at 718-286-0683 or at 120
Aug 30, 2012 · Penalty $250
Resolve - Class - 2
Failed to notify department/obtain permit prior to use/inst off outrigger beams in connection with suspended scaffold. noted:expired outrigger beam notification for suspended scaffold at exposure #1. rem:notify
Jan 18, 2012 · Penalty $400
Resolve - Class - 2
3314.4.1:installation:upon completion of the installation of the scaffold an inspection report verifying that the scaffold has been installed in accordance with the design drawing. noted:no sign off letter on s
Jan 18, 2012 · Penalty $400
Resolve - Class - 2
Failure to maintain building in code compliant manner.noted:concrete ceiling is spalling at the cellar level(parking garage) leaving the rebars exposed.remedy:repair and/or replace concrete.
Dec 3, 2011
Resolve - Class - 1
Failure to have site safety manager present as required.upon inspec.of20 stories bldg appl.#120664762 facade alteration work in progress no site safety manager present.stop all work except to make safe provide
Sep 14, 2011 · Penalty $2,400
Resolve - Non-hazardous
Occupancy contrary to that allowed by the certificate of occupancy of building department records hazardous. certificate of occupancy #100986 dated july 13,1992 calls for the parking garage to have maximum of 1
Jan 2, 2008 · Penalty $800
Resolve - Non-hazardous
Exit door total obstruction cellar level stairway exit door is locked and un passable impeding egress of any and all personnel in an emergency. remedy: remove obstruction.
Jan 2, 2008 · Penalty $480
Resolve - Non-hazardous
B5c 27-386 directional exit signs cellar level - there are no exit directional signs leading personnel to an egress in case of an emergency remedy: provide directional exit signs.
Jan 2, 2008 · Penalty $200
Resolve - Non-hazardous
Bc5 27-381 exit lighting. cellar level stairway exit is not lighted remedy: provide lighting for exit signs.
Jan 2, 2008 · Penalty $200
Resolve - Non-hazardous
Exit passage or(corridor) required width decreased by obstruction cellar level over crowded with cars and the positioning of the cars parkedmakes it difficult to get to the cellar stairway egress in case of eme
Jan 2, 2008 · Penalty $350
Resolve - Non-hazardous
Failed to notify the dob prior to the use or installation of "c" hooksor outrigger beams in connection w/suspended scaffolds.
Sep 24, 2007 · Penalty $500
Resolve
Complaints
- Heating
Heat related
Nov 12, 2013 · Apt 6K
Close - Heating
Heat related
Nov 27, 2007 · Apt 11G
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Aug 17, 2026 | Non-market transfer | Coops - elevator apartments | — |
| Aug 5, 2026 | $1,375,000 | Coops - elevator apartments | — |
| Jul 9, 2026 | $1,975,000 | Coops - elevator apartments | — |
| Apr 29, 2026 | $600,000 | Coops - elevator apartments | — |
| Apr 13, 2026 | $980,000 | Coops - elevator apartments | — |
| Apr 10, 2026 | $775,000 | Coops - elevator apartments | — |
| Mar 27, 2026 | $900,000 | Coops - elevator apartments | — |
| Feb 26, 2026 | $730,000 | Coops - elevator apartments | — |
| Feb 12, 2026 | $1,640,000 | Coops - elevator apartments | — |
| Feb 10, 2026 | $1,375,000 | Coops - elevator apartments | — |
| Jan 16, 2026 | $1,210,000 | Coops - elevator apartments | — |
| Jan 12, 2026 | $1,350,000 | Coops - elevator apartments | — |
| Dec 17, 2025 | $1,150,000 | Coops - elevator apartments | — |
| Nov 17, 2025 | $1,296,800 | Coops - elevator apartments | — |
| Oct 20, 2025 | Non-market transfer | Coops - elevator apartments | — |
Building details
- Building type
- Elevator apartment building (D4)
- Year built
- 1959
- Floors
- 20
- Residential units
- 320
- Building area
- 537,750 ft²
- Lot area
- 40,400 ft²
- Zoning
- R10
- Community board
- 106
- Council district
- 4
- Block / lot
- 1371 / 38
- Assessed value
- $65,406,150
- Landmark / historic district
- No
HPD registration #138001, last renewed Jul 27, 2026.
Questions about 25 Sutton Place South
Who owns 25 Sutton Place South?
The owner of record in NYC Department of City Planning PLUTO data is Cannon Point North INC.
Does 25 Sutton Place South have violations?
Yes. NYC HPD has recorded 3 housing violations at this property.
Is 25 Sutton Place South rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 25 Sutton Place South built?
City records list 1959 as the year it was built.
How many apartments are in 25 Sutton Place South?
It has 320 residential units and 322 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.