430 East 56 Street
Manhattan, NY 10022BBL 1-01367-0035Map
Owner of record: Sutton Manor Apts In
430 East 56 Street is an elevator apartment building built in 1955 in Manhattan, 10022. It has 82 residential units across 13 floors. The owner of record is Sutton Manor Apts In. HPD has recorded 41 housing violations here, most recently on June 16, 2026. 39 of the 41 most recent violations are still open.
- HPD violations
- 41
- DOB violations
- 33
- ECB violations
- 11
- HPD complaints
- 42
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 41
- ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Jun 16, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at east fire door to roof at fire stairs
Jun 16, 2026
Closed — Violation closed - BHazardous
Replace with new the missing sheetrock at all walls and ceiling in the 4th room from north located at apt phb, 12th story, 1st apartment from south at west
Oct 3, 2025 · Apt PHB
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling in the private hallway located at apt phb, 12th story, 1st apartment from south at west
Oct 3, 2025 · Apt PHB
Open — Nov sent out - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures provide electrict to all electrical fixtures in the private hallway located at apt phb, 12th story, 1st apartment from south at west
Oct 3, 2025 · Apt PHB
Open — Nov sent out - BHazardous
Replace with new the missing missing sheetrock at ceiling and all walls in the private hallway located at apt phb, 12th story, 1st apartment from south at west
Oct 3, 2025 · Apt PHB
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of at ceiling in the private hallway located at apt phb, 12th story, 1st apartment from south at west
Oct 3, 2025 · Apt PHB
Open — Nov sent out - BHazardous
Replace the broken or defective sink in kitchen atnorth wall in the kitchen located at apt phb, 12th story, 1st apartment from south at west
Oct 3, 2025 · Apt PHB
Open — Nov sent out - BHazardous
Replace with new the missing sheetrock at all walls and ceiling in the kitchen located at apt phb, 12th story, 1st apartment from south at west
Oct 3, 2025 · Apt PHB
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective the floor in the kitchen located at apt phb, 12th story, 1st apartment from south at west
Oct 3, 2025 · Apt PHB
Open — Nov sent out
Show 31 more ↓
- BHazardous
Provide a safe and adequate supply of electric service to the fixtures ceiling and all walls in the kitchen located at apt phb, 12th story, 1st apartment from south at west
Oct 3, 2025 · Apt PHB
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of ceiling and all walls in the kitchen located at apt phb, 12th story, 1st apartment from south at west
Oct 3, 2025 · Apt PHB
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the private hallway located at apt phb, 12th story, 1st apartment from south at west
Oct 3, 2025 · Apt PHB
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective floor in the 4th room from north located at apt phb, 12th story, 1st apartment from south at west
Oct 3, 2025 · Apt PHB
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures ceiling and all walls in the 4th room from north located at apt phb, 12th story, 1st apartment from south at west
Oct 3, 2025 · Apt PHB
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of at ceiling and east wall in the 4th room from north located at apt phb, 12th story, 1st apartment from south at west
Oct 3, 2025 · Apt PHB
Open — Nov sent out - BHazardous
Replace with new the missing sheetrock at ceiling and all walls in the 3rd room from north located at apt phb, 12th story, 1st apartment from south at west
Oct 3, 2025 · Apt PHB
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective floor in the 3rd room from north located at apt phb, 12th story, 1st apartment from south at west
Oct 3, 2025 · Apt PHB
Open — Nov sent out - ANon-hazardous
Refit door at west wall in the 3rd room from north located at apt phb, 12th story, 1st apartment from south at west
Oct 3, 2025 · Apt PHB
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling in the 3rd room from north located at apt phb, 12th story, 1st apartment from south at west
Oct 3, 2025 · Apt PHB
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of at ceiling and all walls in the 3rd room from north located at apt phb, 12th story, 1st apartment from south at west
Oct 3, 2025 · Apt PHB
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective lower sash glass pane at west in the 1st room from north located at apt phb, 12th story, 1st apartment from south at west
Oct 3, 2025 · Apt PHB
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the private hallway located at apt phb, 12th story, 1st apartment from south at west
Oct 3, 2025 · Apt PHB
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the private hallway located at apt phb, 12th story, 1st apartment from south at west
Oct 3, 2025 · Apt PHB
Open — Nov sent out - BHazardous
Refit door at south wall in the 3rd room from north located at apt phb, 12th story, 1st apartment from south at west
Oct 3, 2025 · Apt PHB
Open — Nov sent out - BHazardous
Refit door to terrace at upper level in the 4th room from east at south located at apt phb, 12th story, 1st apartment from east at south
Sep 3, 2025 · Apt PHB
Open — Nov sent out - BHazardous
Refit door to terrace at upper level in the 3rd room from east located at apt phb, 12th story, 1st apartment from east at south
Sep 3, 2025 · Apt PHB
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective caulking around 1st window at west at upper level in the 3rd room from east at north located at apt phb, 12th story, 1st apartment from east at south
Sep 3, 2025 · Apt PHB
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective glass pane lower sash at 1st window at west at upper level in the 3rd room from east at north located at apt phb, 12th story, 1st apartment from east at south
Sep 3, 2025 · Apt PHB
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective concrete floor in the 1st room from east located at penthouse phb, 13th story, 1st penthouse from south at west
Jul 31, 2025 · Apt PHB
Open — Nov sent out - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures light fixtures and electrical outlets throughout in the entire apartment located at penthouse phb, 13th story, 1st penthouse from south at west
Jul 31, 2025 · Apt PHB
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires throughout in the entire apartment located at penthouse phb, 13th story, 1st penthouse from south at west
Jul 31, 2025 · Apt PHB
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 15, 2023
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of bedbugs in the entire apartment located at apt 6a, 6th story, 2nd apartment from east at south
Nov 12, 2010 · Apt 6A
Open — Nov certified late - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 1st room from north located at apt 6a, 6th story, 2nd apartment from east at south
Nov 12, 2010 · Apt 6A
Open — Nov certified late - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the walls in the kitchen located at apt 6a, 6th story, 2nd apartment from east at south
Nov 12, 2010 · Apt 6A
Open — Invalid certification - BHazardous
Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 6a, 6th story, 2nd apartment from east at south
Jul 22, 2008 · Apt 6A
Open — Nov sent out - ANon-hazardous
Refit oven doors in the kitchen located at apt phb, 7th story
Mar 31, 2000 · Apt PHB
Open — Invalid certification - BHazardous
Replace with new the missing ceiling light fixture in the kitchen located at apt phb, 7th story
Mar 31, 2000 · Apt PHB
Open — Invalid certification - ANon-hazardous
Refit kitchen cabbinet doors in the kitchen located at apt phb, 7th story
Mar 31, 2000 · Apt PHB
Open — Invalid certification - ANon-hazardous
Refit kitchen sink cabinet doors in the kitchen located at apt phb, 7th story
Mar 31, 2000 · Apt PHB
Open — Invalid certification
DOB building violations · 33
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 22, 2024
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2023
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 10, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 19, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 22, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 15, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 7, 2014
Dob violation - resolved
Show 23 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Apr 7, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 6, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 11, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 11, 2012
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 27, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 27, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 2, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 2, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 30, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 30, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 30, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 30, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 27, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 27, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 19, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 19, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 21, 2004
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 24, 2003
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 24, 2003
Dob violation - resolved - Construction other optional
C-construction other optional
Aug 17, 1992
Dob violation - dismissed - Construction other optional
C-construction other optional
Aug 17, 1992
Vp-violation unserved ecb-active - Elevator elevatorrequired
(15) and (47) secure
May 31, 1989
Dob violation - resolved
ECB violations · 11
- Class - 1
Work without a permit:note observed during inspection gut renovation work being done in apartments 6f & 7f at the subject location.work doneinvolves plumbing,electrical,the erection of partitions and ceilings.t
Jun 15, 2023 · Penalty $2,500
Resolve - Class - 2
Failure to submit a required cycle 8b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control # 804782.remedy: submit required technical report
Oct 15, 2018 · Penalty $625
Resolve - Non-hazardous
22d6,46o2,50y14,50o2,55m7,57o2,73o2,74##. -22 secure, -46 clean, -50 clean, -55 provide, -57 clean, -73 clean installation, -74 repair car switch handle to self center.
Jul 14, 1999
Resolve - Non-hazardous
36t,50y,03o,57o, 03-top of car dirty.
Jul 30, 1997
Resolve - Non-hazardous
Work without a permit: work noted: construction of a wooden fence with attached planter boxes, approximately 50 feet in length running along parapet wall of penthouse b. remedy: obtain all required permits or r
May 26, 1993
Resolve - Non-hazardous
Altered building occupied at the 10 floor apts 10f & 10g combined without a c/o alt320/87.remedy:obtain a valid c/o or discontinue illegal use.
Feb 18, 1993
Resolve - Non-hazardous
Altered building occupied at apt.12a/phb without a valid c of o alt#1632/86.remedy:obtain a valid c of o.
Feb 18, 1993
Resolve - Non-hazardous
Failrue to have approved pa plans available for inspection. remedy: obtain plans and flame. use of prohibited hardware at n.e. exit.
Mar 27, 1990 · Penalty $230
Resolve - Non-hazardous
Exit door not self closing at ne exit. remedy : install self closing device on exit door. emergency lighting is inoperative.
Mar 27, 1990 · Penalty $140
Resolve - Non-hazardous
Altered building occupied at the 10 floor apartment 10f & 10g combine without a valid c of o as required by open alteration. remedy: obtain a new amended c of o as required.
Dec 13, 1989 · Penalty $250
Resolve
Show 1 more ↓
- Non-hazardous
Altered building occupied at the 12th floor apartment 12a & penthouse b without a valid c of o as required by open alteration 1632/86. remedy: obtain a new amended c of o as required.
Dec 13, 1989 · Penalty $250
Active
Complaints
- Electric
Power outage
Jan 30, 2026 · Apt PHB
Close - Door/window
Window frame
Jan 30, 2026 · Apt PHB
Close - Door/window
Window pane
Jan 30, 2026 · Apt PHB
Close - Paint/plaster
Wall
Jan 30, 2026 · Apt PHB
Close - Door/window
Door
Jan 30, 2026 · Apt PHB
Close - Flooring/stairs
Floor
Jan 30, 2026 · Apt PHB
Close - Paint/plaster
Wall
Jan 30, 2026 · Apt PHB
Close - Plumbing
Basin/sink
Jan 30, 2026 · Apt PHB
Close - Flooring/stairs
Floor
Jan 30, 2026 · Apt PHD
Close - Water leak
Heavy flow
Sep 25, 2025 · Apt PHB
Close
Show 32 more ↓
- Door/window
Window frame
Sep 17, 2025 · Apt PHB
Close - Door/window
Door frame
Sep 17, 2025 · Apt PHB
Close - Water leak
Heavy flow
Sep 17, 2025 · Apt PHB
Close - Electric
Power outage
Jul 29, 2025 · Apt PHB
Close - Flooring/stairs
Floor
Jul 29, 2025 · Apt PHB
Close - Paint/plaster
Ceiling
Jul 29, 2025 · Apt PHB
Close - Appliance
Electric/gas range
Jul 29, 2025 · Apt PHB
Close - Flooring/stairs
Floor
Jul 29, 2025 · Apt PHB
Close - Water leak
Slow leak
Jul 29, 2025 · Apt PHB
Close - Electric
Wiring
Jul 29, 2025 · Apt PHB
Close - Flooring/stairs
Floor
Jul 29, 2025 · Apt PHB
Close - Electric
Lighting
Jul 8, 2025 · Apt THD
Close - Door/window
Window frame
Jul 8, 2025 · Apt THD
Close - Door/window
Door
Jul 8, 2025 · Apt THD
Close - Electric
Lighting
Jun 6, 2025 · Apt PHB
Close - Unsanitary condition
Mold
Jun 6, 2025 · Apt PHB
Close - Electric
Wiring
Jun 6, 2025 · Apt PHB
Close - Flooring/stairs
Floor
Jun 6, 2025 · Apt PHB
Close - Plumbing
Basin/sink
Jun 6, 2025 · Apt PHB
Close - Plumbing
Radiator
Jun 6, 2025 · Apt PHB
Close - Appliance
Refrigerator
Jun 6, 2025 · Apt PHB
Close - Appliance
Electric/gas range
Jun 6, 2025 · Apt PHB
Close - Paint/plaster
Ceiling
Jun 6, 2025 · Apt PHB
Close - Paint/plaster
Wall
Jun 6, 2025 · Apt PHB
Close - Water leak
Damp spot
Jun 6, 2025 · Apt PHB
Close - Heat/hot water
Entire building
May 10, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
May 10, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 29, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 6, 2019 · Apt 2E
Close - Nonconst
Vermin
Oct 26, 2010 · Apt 6A
Close - Appliance
Electric/gas range
Jul 16, 2008 · Apt 6A
Close - Heating
Heat related
Nov 16, 2007 · Apt BLDG
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Jul 9, 2026 | Non-market transfer | Coops - elevator apartments | — |
| Jun 3, 2026 | Non-market transfer | Coops - elevator apartments | — |
| Apr 6, 2026 | $405,000 | Coops - elevator apartments | — |
| Mar 23, 2026 | $440,000 | Coops - elevator apartments | — |
| Feb 27, 2026 | $1,500,000 | Coops - elevator apartments | — |
| Jan 6, 2026 | $460,000 | Coops - elevator apartments | — |
| Nov 13, 2025 | $640,000 | Coops - elevator apartments | — |
| Oct 29, 2025 | $1,200,000 | Coops - elevator apartments | — |
Building details
- Building type
- Elevator apartment building (D4)
- Year built
- 1955
- Floors
- 13
- Residential units
- 82
- Building area
- 90,000 ft²
- Lot area
- 12,560 ft²
- Zoning
- R10
- Community board
- 106
- Council district
- 4
- Block / lot
- 1367 / 35
- Assessed value
- $9,990,450
- Landmark / historic district
- No
HPD registration #118875, last renewed Sep 18, 2025.
Questions about 430 East 56 Street
Who owns 430 East 56 Street?
The owner of record in NYC Department of City Planning PLUTO data is Sutton Manor Apts In.
Does 430 East 56 Street have violations?
Yes. NYC HPD has recorded 41 housing violations at this property.
Is 430 East 56 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 430 East 56 Street built?
City records list 1955 as the year it was built.
How many apartments are in 430 East 56 Street?
It has 82 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.