424 East 52 Street
Manhattan, NY 10022BBL 1-01363-0037Map
Owner of record: Southgate Owners Corp
424 East 52 Street is an elevator apartment building built in 1930 in Manhattan, 10022. It has 81 residential units across 13 floors. The owner of record is Southgate Owners Corp. HPD has recorded 15 housing violations here, most recently on March 15, 2023. 14 of the 15 most recent violations are still open.
- HPD violations
- 15
- DOB violations
- 33
- ECB violations
- 9
- HPD complaints
- 14
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 15
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 15, 2023
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective masonry and plaster ceiling in the 1st room from north at east located at apt 9a, 9th story, 1st apartment from north at east
Apr 4, 2002 · Apt 9A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective masonry and plaster in the bathroom located at apt 9a, 9th story, 1st apartment from north at east
Apr 4, 2002 · Apt 9A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east wall at sink in the kitchen located at apt 9a, 9th story, 1st apartment from north at east
Apr 4, 2002 · Apt 9A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceilings, walls and trim in the entire apartment located at apt 9a, 9th story, 1st apartment from north at east
Apr 4, 2002 · Apt 9A
Open — Nov sent out - ANon-hazardous
Replace with new the broken or defective butcher block counter top in the kitchen located at apt 9a, 9th story, 1st apartment from north at east
Apr 4, 2002 · Apt 9A
Open — Nov sent out - BHazardous
Replace with new the broken or defective and missing electrical ceiling light fixture in the foyer located at apt 9a, 9th story, 1st apartment from north at east
Apr 4, 2002 · Apt 9A
Open — Nov sent out - BHazardous
Replace with new the missing floor cabinet at sink in the kitchen located at apt 9a, 9th story, 1st apartment from north at east
Aug 2, 2001 · Apt 9A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the bathroom located at apt 9a, 9th story, 1st apartment from north at east
Aug 2, 2001 · Apt 9A
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of expose electrical wire at wall and ceiling in the kitchen located at apt 9a, 9th story, 1st apartment from north at east
Aug 2, 2001 · Apt 9A
Open — Nov sent out
Show 5 more ↓
- BHazardous
Replace with new the broken or defective counter top at sink in the kitchen located at apt 9a, 9th story, 1st apartment from north at east
Aug 2, 2001 · Apt 9A
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the entire apartment located at apt 9a, 9th story, 1st apartment from north at east
Aug 1, 2001 · Apt 9A
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective ceramic wall tile west wall in the bathroom located at apt 9a, 9th story, 1st apartment from north at east
Aug 1, 2001 · Apt 9A
Open — Nov sent out - ANon-hazardous
M/d law abate the nuisance consisting of exposed electrical wire ceiling in the kitchen located at apt 9a, 9th story, 1st apartment from north at east
Aug 1, 2001 · Apt 9A
Open — Nov sent out - ANon-hazardous
Replace with new the broken or defective wood counter top and sink base in the kitchen located at apt 9a, 9th story, 1st apartment from north at east
Aug 1, 2001 · Apt 9A
Open — Nov sent out
DOB building violations · 33
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 3, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 18, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 18, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 18, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 18, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 18, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 10, 2014
Dob violation - resolved
Show 23 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Apr 10, 2014
Dob violation - resolved - Failure to submit eer none
Failure to submit an energy efficiency report (eer) per ad. code sec. 28-308.4
Dec 31, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 27, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 27, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 23, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 23, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 28, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 28, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 2, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 2, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 27, 2006
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 6, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 6, 2006
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Oct 1, 2005
Dob violation - dismissed - Elevator elevatorrequired
1p18290
Nov 23, 1998
Dob violation - resolved - Elevator elevatorrequired
1p18289
Nov 23, 1998
Dob violation - resolved - Elevator elevatorrequired
51- lost motion 74-perform 5 ytear test
Jul 25, 1990
Dob violation - resolved - Elevator elevatorrequired
09- replace worn gibs where needed 74- perform 5 year test
Jul 25, 1990
Dob violation - resolved - Elevator elevatorrequired
(33) replace worn gibs where needed
Mar 29, 1989
Dob violation - resolved - Elevator elevatorrequired
51)motor eliminate vibration and running hot
Nov 14, 1988
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 14, 1988
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 14, 1988
Dob violation - resolved - Elevator elevatorrequired
(51) motor eleminate vibrations and running hot
Nov 14, 1988
Dob violation - active
ECB violations · 9
- Class - 1
Atoi of inspection of a facade job work in progress suspend scaffolds in use upon request to the rigging foreman(ronny granados) on site or the manufactured specs for pendants on motors in use and installed non
Aug 20, 2024 · Penalty $1,250
Resolve - Non-hazardous
50f,75u. main machine lost motion, perform and file five year test.
Aug 11, 1999 · Penalty $180
Resolve - Non-hazardous
50y2. clean oil around machine.
Aug 19, 1997 · Penalty $100
Resolve - Non-hazardous
50y2,57o2. clean oil and rags around machine. clean pit.
Aug 19, 1997 · Penalty $100
Resolve - Non-hazardous
73#, 73. perform 5 year test, properly tag device and file elv.3 form
Apr 15, 1992
Resolve - Non-hazardous
Failure to provide approved plans at premises at time of inspection. remedy: provide approved plans.
Oct 19, 1988 · Penalty $50
Resolve - Unknown
Work without a permit. remedy: stop all work. obtain a new permit.
Oct 4, 1988 · Penalty $125
Resolve - Non-hazardous
Failure to provide approved plans at premises at the time of inspection. remedy: provide a set of approved plans at premises.
Oct 4, 1988 · Penalty $25
Resolve - Non-hazardous
Failure to provide approved plans at premises at time of inpsection for alteration 1433-86 remedy: provide approved set of plans for inspection.
Jun 15, 1988
Resolve
Complaints
- Plumbing
Water supply
Jun 17, 2019 · Apt ALL
Close - Paint/plaster
Ceiling
Oct 25, 2014 · Apt PH1
Close - Plumbing
Bathtub/shower
Oct 25, 2014 · Apt PH1
Close - Flooring/stairs
Floor
Oct 25, 2014 · Apt PH1
Close - Door/window
Door frame
Oct 25, 2014 · Apt PH1
Close - Paint/plaster
Wall
Oct 25, 2014 · Apt PH1
Close - Door/window
Door
Oct 25, 2014 · Apt PH1
Close - Flooring/stairs
Floor
Oct 25, 2014 · Apt PH1
Close - Paint/plaster
Ceiling
Oct 25, 2014 · Apt PH1
Close - Heating
Heat related
Oct 16, 2012 · Apt NA
Close
Show 4 more ↓
- Heating
Heat related
Jan 22, 2005 · Apt PHC
Close - Paint/plaster
Ceiling
Apr 2, 2003 · Apt 9E
Close - Paint/plaster
Wall
Apr 2, 2003 · Apt 9E
Close - Appliance
Electric/gas range
Apr 2, 2003 · Apt 9E
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Jul 16, 2026 | $925,000 | Coops - elevator apartments | — |
| Jul 14, 2026 | $1,100,000 | Coops - elevator apartments | — |
| May 7, 2026 | $1,155,000 | Coops - elevator apartments | — |
| Dec 17, 2025 | $408,000 | Coops - elevator apartments | — |
| Dec 15, 2025 | $705,000 | Coops - elevator apartments | — |
| Oct 20, 2025 | $550,000 | Coops - elevator apartments | — |
Building details
- Building type
- Elevator apartment building (D4)
- Year built
- 1930
- Floors
- 13
- Residential units
- 81
- Building area
- 88,181 ft²
- Lot area
- 10,041 ft²
- Zoning
- R10
- Community board
- 106
- Council district
- 4
- Block / lot
- 1363 / 37
- Assessed value
- $9,583,200
- Landmark / historic district
- No
HPD registration #117969, last renewed Aug 23, 2025.
Questions about 424 East 52 Street
Who owns 424 East 52 Street?
The owner of record in NYC Department of City Planning PLUTO data is Southgate Owners Corp.
Does 424 East 52 Street have violations?
Yes. NYC HPD has recorded 15 housing violations at this property.
Is 424 East 52 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 424 East 52 Street built?
City records list 1930 as the year it was built.
How many apartments are in 424 East 52 Street?
It has 81 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.