roofy

342 East 59 Street

Manhattan, NY 10022BBL 1-01351-0032Map

Owner of record: Brause 34059 Property Co

342 East 59 Street is a garage / gas station built in 1900 in Manhattan, 10022. The owner of record is Brause 34059 Property Co. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
58
ECB violations
46
HPD complaints
0

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 58

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 13, 2024

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jun 26, 2024

    Dob violation - dismissed
  • Construction other optional

    Full(entire park.struc.all 7fl.)vacate order. note-inspection of this building story(6+c) (7level) independent structure observed unsafe condition as per opsi filing. after dob plan examiner review recomme full vacate of entire parking structure. remedy, immediately vacate entire parking structure as per commisioner order

    May 22, 2024

    Dob violation - active
  • Construction other optional

    Emergency work order.note on an active parking structure consisting of 7 levels,observed:1)general crack throughout on all floors.2)spalled f alse ceiling on all floors at several locations.3)steel beam damage on on the ceiling level.remedy:owner to retain a nys reg design professio nal to supervise installation of safety measures.provide daily report

    Apr 25, 2024

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2023

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 17, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 17, 2021

    Dob violation - resolved
  • Facade safety program facade required

    Cycle 8 haz violation

    Apr 27, 2020

    Dob violation - dismissed
  • Failure to correct swarmp conditions (facade) facade required

    Cycle 9c failure to correct swarmp conditions

    Apr 27, 2020

    Dob violation - active
  • Facade safety program facade required

    Cycle 9 unsafe filing

    Apr 27, 2020

    Dob violation - dismissed
Show 40 more ↓
  • Failure to correct swarmp conditions (facade) facade required

    Cycle 9c failure to correct swarmp conditions

    Apr 27, 2020

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 11, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 11, 2019

    Dob violation - resolved
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator - failure to file category 1 2017 inspection/test

    Apr 5, 2019

    Dob violation - active
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - active
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 22, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 22, 2017

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - active
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - active
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - active
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 18, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 18, 2016

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jun 3, 2015

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 17, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 17, 2015

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst

    May 30, 2014

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 4, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 4, 2014

    Dob violation - resolved
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2012 inspection/test

    Mar 31, 2014

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 27, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 27, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 11, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 11, 2012

    Dob violation - resolved
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2011 inspection/test

    Oct 1, 2012

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 3, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 3, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 15, 2009

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 15, 2009

    Dob violation - resolved
  • Facade facade optional

    Ll1198-local law 11/98 - facade facade optional

    Nov 30, 2007

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 19, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 4, 2004

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 4, 2004

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 27, 2004

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 27, 2004

    Dob violation - resolved
  • Elevator elevatorrequired

    1f4247

    Nov 8, 2000

    Dob violation - resolved
  • Elevator elevatorrequired

    1f4246

    Nov 25, 1998

    Dob violation - resolved
  • Elevator elevatorrequired

    1f4247

    Nov 25, 1998

    Dob violation - resolved

ECB violations · 46

  • Class - 2

    Failure to maintain parking structure in safe condition. as noted at time of inspection on an occupied parking structure consisting of cellar and 6 levels, observed cracking at north elevation facade and cracki

    Aug 20, 2026 · Penalty $1,250

    Active
  • Class - 1

    28-323.1. failure to maintain parking structure in safe condition. as noted:-on an active parking structure consisting of 7 level(cellar, atll and above gl), observed general crack found throughout the floors o

    Apr 25, 2024 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to secure public safety and/or make the building's structure and appurtenances conform to the previous of the admin code after unsafe notification filed by q.p.s.i. #cr-m0002699 dated 03/19/2024. as not

    Apr 25, 2024 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 8c report of critical examination documents condition of exterior wall and appurtenances required by 28-302.4 for control#804740.remedy:submit acceptable required

    Feb 13, 2020 · Penalty $625

    Resolve
  • Class - 2

    59.b.15,68.b.7,21.q.3;59-b-15 brake tag missing tag device 68-b-7 main log not updated provide 21-q-3 4th floor intrlock unguarded properly guard

    May 23, 2019 · Penalty $625

    Resolve
  • Class - 1

    Bc3308.5 vertical safety meeting. pswo on exp#1. at time of inspectioni observe on exp#1-pipe scaffold erected to parapet level. safety net ting around scaffold does not enclosed entire perimeter.vertical safet

    Sep 28, 2015 · Penalty $1,600

    Resolve
  • Class - 1

    Work w/o permit.work was obsrved being done at metal cornice of bldg. in addition t demoliton of bulkhead on the roof.it also appears that contractor is working on facade. a tremendous amount of debris was ob

    Feb 28, 2015

    Resolve
  • Class - 1

    Rcny-1510(l) egress from fire escape shall not be obstructed.noted:@time of my insp fire escape hatch cut into sidewalk shed was blocked w/wood planks.causing an immediate hazard to any one who may try to escap

    Jan 15, 2015 · Penalty $1,600

    Resolve
  • Class - 2

    Work does not conform to approved plans (suspended scaffold) noted:@time of my insp outrigger beam placement & counter weight total weight did not conform to approved plans (cd-5) on site.none of the beam in pl

    Jan 15, 2015 · Penalty $250

    Resolve
  • Class - 1

    3314.8 pswo:issued 7 posted @front entrance supported scaffold does not meet code specs.noted:@time of my insp supported scaffold was missing guardrails,had decks not fully planked,&large amounts of debris stor

    Jan 15, 2015 · Penalty $1,600

    Resolve
Show 36 more ↓
  • Class - 1

    3305.1 storage of flammable & combustable liquids.noted:@time of my insp i found a gas can filled & stored on the sidewalk shed.(cau) had the name concord written on it.what looked like s pressure washer was co

    Jan 15, 2015 · Penalty $1,600

    Resolve
  • Class - 2

    Failed to notify department prior to use/installation of c-hooks/outrigger beams in connection w/suspended scaffold. noted: at time of inspection outrigger beams installed at exposure #3 w/o notification.*stop

    Dec 5, 2013 · Penalty $800

    Resolve
  • Class - 2

    41k11,40m7,68m7,100m7,100d10. machine room door rusted,replace same; 41k11-provide ladder to machine room missing; 40m7-provide missing maint log; 68m7-provide missing mcp data; 100m7-repair unsecured,damaged

    Sep 23, 2013 · Penalty $500

    Resolve
  • Class - 2

    Work w/o a permit-work noted roof (1) roof top enclosure -sometimes referred to as penthouse (burned out) (2) all floors rear-created expanded window opening w/lintels w/paper/plastic sign 'exit' new opening to

    Jan 6, 2012 · Penalty $800

    Resolve
  • Class - 2

    Failure to maintain building in code-complaint manner-general lightinglighting for exits are not operational on each floor exit emergency lighting not provided light fixtures missing bulbs,broken fixtures etc.

    Jan 6, 2012 · Penalty $500

    Active
  • Class - 2

    Failure to maintain building in code complaint manner. remove large amounts of misc debris at following areas. 1-space under-water tank. 2-roof enclosed space (rotted/burnt wood) 3-rear yard 4-cellar front unde

    Jan 6, 2012 · Penalty $500

    Active
  • Class - 2

    Failure to comply w/comm's order to file a c of c w/the dept of buildings for notice of violation #34113063j issued on 7/14/94 #34049389x issued on 2/11/91 pursuant to 28-204.4 & 1 rcny 102-01.

    Jan 6, 2012

    Resolve
  • Class - 2

    Failure to maintain building in code complaint manner. 1-floors cracked throughout all floors. 2-ceiling cracked repaired &/or covered over w/tin,plywood etc. 3-thru floor penetrations-no firestopping. 4-exit

    Jan 6, 2012 · Penalty $500

    Active
  • Class - 2

    Failure to file an acceptable sixth round technical report in compliance w/ code provisions periodic insp of exterior walls and appurtenances as required by article 28.302 and the dob rules and regulations rem:

    Jan 25, 2011

    Resolve
  • Class - 2

    Failure to file an acceptable sixth round technical report in compliance w/ code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the d.o.b. rules & regulations

    May 10, 2010 · Penalty $8,000

    Resolve
  • Class - 2

    Failure to submit an acceptable 6th round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the dept of buildings rules &

    Dec 12, 2008 · Penalty $4,000

    Resolve
  • Hazardous

    Failure to maintain bldg. defect noted: concrete is spalling away fromhorizontal beam (reinforced) on 3rd & 4th flr. remedy: repair concretebeam.

    Oct 25, 2007

    Resolve
  • Non-hazardous

    Failure to post c of o at time of insp. remedy: post c of o.

    Oct 19, 2005 · Penalty $250

    Resolve
  • Non-hazardous

    Exit passageway or corridor. total obstruction. exit passageway or corridor leading to exit doors obstructed by vehicles. location: 2nd - 5th fls. remedy: remove obstruction.

    Oct 19, 2005 · Penalty $480

    Resolve
  • Non-hazardous

    Exit door: total obstruction. exit door total obstruction by vehicles at 2nd- 5th fls. remedy: remove obstruction.

    Oct 19, 2005 · Penalty $480

    Resolve
  • Non-hazardous

    Failure to maintain: defect noted: (1) fire escape tread is deteriorated w/missing steps creating a hazardous condition at 2nd & 3rd fls. remedy:; make all repairs/make safe.

    Oct 19, 2005 · Penalty $800

    Resolve
  • Non-hazardous

    Failure to maintain: defect noted. spalling concrete at ceilings exposing rebars, location 3rd fl, 6th, 5th fls various locations. remedy: make all repairs.

    Oct 19, 2005 · Penalty $800

    Resolve
  • Hazardous

    Exit door/windows total obstruction: at rear fire escape express windows are obstructed by jamming, and being boarded with steel and wood panels and 2x4 wood cross bars., thereby obstructing egress to rear fire

    Jul 28, 2004 · Penalty $1,200

    Resolve
  • Hazardous

    Exit door/window total obstruction note at rear fire escape all exits to fire escape are obstructed /boraded up & sealed with no escapes to fire escape throughout bldg (at rear)all floors remedy:remove obstruct

    Mar 12, 2004 · Penalty $480

    Resolve
  • Non-hazardous

    Failure to maintain/provide fire stoping where required note large areas of fire rated ceiling have collapsed are missing leaving exposed w ood joists on large portions (more than 100 cts)on floors # 6,5,3, and

    Mar 12, 2004 · Penalty $350

    Resolve
  • Non-hazardous

    Failure to provide exit signs where required note:there are no exit signs throughout builing at rear to indicate locations of exit to rear fire escape at all to rear fire escape at all floors remedy:provide

    Mar 12, 2004 · Penalty $400

    Resolve
  • Non-hazardous

    05b,18m,32m,30o,15i,50y,75u,46b,60m,57o. adjust door to fully close, inter lock and pipes and ducts covers missing , hoist way doors damage, main machine leaking, oil five year test tag.

    Jun 8, 1999 · Penalty $180

    Resolve
  • Non-hazardous

    39h,46h,50y,75u,31b,74i,15h,23u,02b,57o,11l,30i,03i,31b-provide cover for wiring a.c. motor 74i replace broken window machine room 15h- hoist way door gibs worm door lock covers missing replace 02-b repair

    Dec 23, 1997 · Penalty $350

    Active
  • Non-hazardous

    75m,25u,15h,03i,30o,02b,30i,46h, 15-h hoist way door gibs worn repair 03 i repair car flooring and wale 02b- repair alarm bell 30i repair holes in hoist way and replace all interlock

    Dec 23, 1997 · Penalty $350

    Active
  • Non-hazardous

    Occupancy contrary to that allowed by the certificate of occupancy from roof occuping a section of former roof as office contrary to c of o 10316 remedy restore premises back to prior legal condition

    Oct 23, 1995 · Penalty $2,000

    Active
  • Non-hazardous

    Occupying a section of former roof as office space with different rooms, kitchen & others-contrary to c,o,#10316 lawful use of roof. remedy: discontinue use or amend certificate of occupancy.

    Jul 14, 1994 · Penalty $800

    Active
  • Non-hazardous

    30q,30i,50y,14m,15i, (30) windows

    Feb 22, 1993 · Penalty $100

    Resolve
  • Non-hazardous

    30q,50y,14m

    Feb 22, 1993 · Penalty $100

    Resolve
  • Non-hazardous

    15w,18x,05m

    Mar 7, 1991 · Penalty $75

    Resolve
  • Non-hazardous

    15w,18x,03d,20l,47l,50y,31d,46y,55l

    Mar 7, 1991 · Penalty $150

    Resolve
  • Non-hazardous

    Work without a permit. work noted: penthouse structure erected at s/wcorner of roof. structure currently used as office space in conjunction with public parking garage located in building. structure is approx

    Feb 11, 1991 · Penalty $285

    Resolve
  • Non-hazardous

    Occuancy contrary to that allwowed by the c of o. remedy: discontiue illegal use.

    Dec 6, 1989

    Resolve
  • Hazardous

    Erect a sturcture on roof and occupying same sturcture as offices contray to zoning resolution in a c2-5 district no permited no permit and approvals for structure remedy comform to zoning resolution use

    Sep 13, 1989 · Penalty $745

    Resolve
  • Non-hazardous

    Occupancy contrayr to that allowed by the c of o dated 12-1-25 reads 5 autos on each floor not change to approx 40 cars per floor at time of inspection remedy discontinue illegal use

    Sep 13, 1989

    Resolve
  • Non-hazardous

    Occupancy contrary to that qallowed by the c of o 10316 issued 12/1/25 garage for 5 autos on each floor now approx 25 autos per floor. remedy discontinue illegal use

    Aug 3, 1989

    Resolve
  • Non-hazardous

    Occupying a section of former roof as office contrary to co10316, lawful use is roof. remedy: discontinue unlawful use or legaliz.

    Jun 17, 1988 · Penalty $250

    Active

Complaints

No HPD complaints in our records

Complaint data is still being backfilled from NYC Open Data.

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Garage / gas station (G1)
Year built
1900
Floors
6
Residential units
—
Building area
41,586 ft²
Lot area
7,531 ft²
Zoning
R8
Community board
106
Council district
5
Block / lot
1351 / 32
Assessed value
$4,504,950
Landmark / historic district
No

Questions about 342 East 59 Street

Who owns 342 East 59 Street?

The owner of record in NYC Department of City Planning PLUTO data is Brause 34059 Property Co.

Does 342 East 59 Street have violations?

NYC HPD has no housing violations on record for this property.

Is 342 East 59 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 342 East 59 Street built?

City records list 1900 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.