345 East 57 Street
Manhattan, NY 10022BBL 1-01350-0020Map
Owner of record: 34557 Corporation
345 East 57 Street is an elevator apartment building built in 1928 in Manhattan, 10022. It has 60 residential units across 16 floors. The owner of record is 34557 Corporation. HPD has recorded 12 housing violations here, most recently on October 18, 2025. 1 of the 12 most recent violations are still open.
- HPD violations
- 12
- DOB violations
- 40
- ECB violations
- 14
- HPD complaints
- 25
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 12
- CImmediately hazardous
Remove device preventing door from being self-closing consisting of a hook and eye device installed at building entrance door
Oct 18, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 7b, 7th story, 2nd apartment from north at east
Oct 11, 2025 · Apt 7B
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box sign missing at public hall, 1st story
Oct 21, 2021
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Oct 21, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Oct 21, 2021
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Oct 21, 2021
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Oct 21, 2021
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east, north and west wall in the 1st room from east located at penthouse ph, 16th story, 1st penthouse from north at east
Oct 4, 2020 · Apt PH
Closed — Violation closed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration air conditioner unit erected on roof at center south.
Jan 5, 1995
Open — Not complied with - BHazardous
D26-10.01, 10.05 adm code remove all encumbrances consisting of garbage pails all stys fire stairs at east & west.
Jan 5, 1995
Closed — Violation closed
Show 2 more ↓
- ANon-hazardous
D26-12.01 adm code paint with light colored paint to the satisfaction of this department clgs pub hall bulkhead at east.
Jan 5, 1995
Closed — Violation closed - BHazardous
D26-10.01, 10.05 adm code arrange and make self-closing the doors at 6th sty public hall bulkhead door to roof.
Jan 5, 1995
Closed — Violation closed
DOB building violations · 40
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 3, 2022
Dob violation - dismissed - Plumbing none
The dob intends to revoke all approvals and permits under plumbing laa #140345641 due to suspension of master plumbers license. stop all plumbing work under above mentioned permit and obtain a new master plumber to supersede the plumbing permit
Sep 27, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 16, 2015
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 8, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 28, 2014
Dob violation - resolved - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7b technical report by 08/21/2012
Aug 30, 2013
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 30, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 30, 2012
Dob violation - resolved
Show 30 more ↓
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 26, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 26, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 23, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 23, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 2, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 2, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 31, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 31, 2007
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 2, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 6, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 6, 2006
Dob violation - resolved - Construction other optional
C-construction other optional
Dec 10, 2004
Vw*-violation - work w/o permit dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 12, 2001
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 12, 2001
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 12, 2001
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Elevator elevatorrequired
1p7801
Nov 8, 2000
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed - Elevator elevatorrequired
74) adjust or replace top and bottom car shoes
Sep 19, 1990
Dob violation - resolved - Elevator elevatorrequired
74)repair or replace safety edge
Sep 19, 1990
Dob violation - resolved - Elevator elevatorrequired
(51)replace controller skunts as necessary
Dec 21, 1988
Dob violation - resolved
ECB violations · 14
- Class - 1
Upon inspection on the roof of an active 16 story facade alteration jobsite i observed no guardrails installed at all exposures to prevent workers from falling. stop all work on roof. provide guard rails
Jan 24, 2024 · Penalty $5,000
Resolve - Class - 2
I observed tiebacks and lifelines wrapped around the parapet wall/chimney, openings in the bulkhead, and a secondary metal structure. upon review of the approved drawings wrap arounds require 6 wire wrapped aro
Jan 24, 2024 · Penalty $625
Resolve - Class - 2
Upon inspection of a active 16 story facade alteration jobsite i observed tiebacks for out rigger beams wrapped around the parapet wall and portions of the bulkhead. upon request to see a parapet stability repo
Jan 24, 2024
Resolve - Class - 2
Storage near unenclosed perimeters. upon inspection of an active 16 story facade alt construction site i observed pipe scaffold equipment stored approx. 2ft from unenclosed perimeters (no guardrails). all mater
Jan 24, 2024
Resolve - Class - 2
At the time of my inspection of active job site uppon asking for scaffold/sidewalk shed pre shift inspection log,ssm daily inspection log-none were provided,ssp provided not approved by dob,sidewalk shed instal
Sep 8, 2023 · Penalty $1,250
Resolve - Class - 2
/storage on sidewalk shed/at the time of my inspection i observed large amount of material(bricks,sand,mortar),equipment and debris stored on top of sidewalk shed-uppon checking sidewalk shed drawing no storage
Sep 8, 2023
Resolve - Class - 1
Work contrary to plans (cd 5) at the time of my inspection, i observed 3 suspended scaffold installed at site contrary to c05- 2 of scaffolds not shown on co5 (location), measurement from fulcrum point to count
Sep 2, 2023 · Penalty $2,500
Resolve - Class - 2
Temporary construction equipment on site - expired permit. noted at time of inspection observed approx frames of pipe scaffold erected around bulkhead/water tower under permit #121547344-01-eq-sf has expired on
Aug 5, 2014 · Penalty $4,000
Resolve - Class - 1
Sec. 3310.8.3 failure to comply w/rules promulgated by the commissioner - site safety rule. at time of inspection of 16 story bldg under alteration for facade under #120442734 observed incompleted logs for dail
Aug 5, 2014
Resolve - Class - 2
Failure to provide approved/accepted plans at job site at time of inspection. noted: at time of inspection observed supported pipe scaffold.erected at bulkhead level w/3 workers repairing brick work & installin
Aug 5, 2014
Resolve
Show 4 more ↓
- Class - 2
Work does not conform to approved construction documents.noted:installation of outrigger beams are contrary to approved cd-5 @ exp#1.counter weight are not rigging on roof deck as per plan.but are shore-up w/ b
Aug 11, 2011 · Penalty $250
Resolve - Class - 1
Fail to have site safety manager or coordinator as required-upon insp,facade repairs work existing 15 storied bldg commenced suspended scaffolding erected on outrigger beams.@ time of inspection no site safety
Mar 8, 2011 · Penalty $2,400
Resolve - Class - 1
(misc)bc3310.3fail to have site safety plan @ site as required-upon inspection facade repair work of 15 storied existing bldg has started.workers @ site.suspended scaffolding erected from outrigger beams form r
Mar 8, 2011 · Penalty $1,600
Resolve - Non-hazardous
Work w/o a permit:work noted:work permit #103391937 has been revoked,combining apts 8a & 8b.remedy:stop all work,except to make safe.obtain all proper permits & approvals before resuming additional work(obtain
Dec 15, 2004
Resolve
Complaints
- Heat/hot water
Apartment only
Nov 11, 2025 · Apt 7B
Close - Door/window
Door
Oct 25, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Oct 23, 2025 · Apt 7B
Close - Heat/hot water
Apartment only
Oct 16, 2025 · Apt 7B
Close - Heat/hot water
Apartment only
Oct 10, 2025 · Apt 7B
Close - Heat/hot water
Entire building
Dec 3, 2023 · Apt 7B
Close - Heat/hot water
Apartment only
Oct 19, 2021 · Apt 7B
Close - Unsanitary condition
Mold
Oct 5, 2020 · Apt PH
Close - Unsanitary condition
Mold
Sep 23, 2020 · Apt PH
Close - Heat/hot water
Entire building
Apr 25, 2014 · Apt 7B
Close
Show 15 more ↓
- Heating
Heat related
Jan 17, 2014 · Apt 7B
Close - Heating
Heat related
Oct 28, 2013 · Apt 7B
Close - Heating
Heat related
Oct 7, 2012 · Apt NA
Close - Heating
Heat related
Nov 18, 2011 · Apt 7B
Close - Heating
Heat related
Oct 28, 2011 · Apt 7B
Close - Heating
Heat related
Oct 26, 2011 · Apt 7B
Close - Heating
Heat related
Oct 26, 2011 · Apt 7B
Close - Heating
Heat related
Oct 23, 2011 · Apt 7B
Close - Heating
Heat related
Apr 13, 2011 · Apt 60
Close - Heating
Heat related
Nov 27, 2010 · Apt 6D
Close - Heating
Heat related
Oct 13, 2009 · Apt 7B
Close - Heating
Heat related
Oct 12, 2009 · Apt 7B
Close - Heating
Heat related
Nov 25, 2008 · Apt 7B
Close - General
Mold
Oct 27, 2005 · Apt 4A
Close - Electric
Electric-supply
Jun 17, 2004 · Apt 16C
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Dec 17, 2025 | $2,916,500 | Coops - elevator apartments | — |
| Oct 30, 2025 | $775,000 | Coops - elevator apartments | — |
| Sep 22, 2025 | $1,195,000 | Coops - elevator apartments | — |
Building details
- Building type
- Elevator apartment building (D4)
- Year built
- 1928
- Floors
- 16
- Residential units
- 60
- Building area
- 89,349 ft²
- Lot area
- 7,932 ft²
- Zoning
- R10
- Community board
- 106
- Council district
- 4
- Block / lot
- 1350 / 20
- Assessed value
- $9,171,000
- Landmark / historic district
- No
HPD registration #104869, last renewed Sep 17, 2025.
Questions about 345 East 57 Street
Who owns 345 East 57 Street?
The owner of record in NYC Department of City Planning PLUTO data is 34557 Corporation.
Does 345 East 57 Street have violations?
Yes. NYC HPD has recorded 12 housing violations at this property.
Is 345 East 57 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 345 East 57 Street built?
City records list 1928 as the year it was built.
How many apartments are in 345 East 57 Street?
It has 60 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.